覆蓋層壓力 的英文怎麼說

中文拼音 [céng]
覆蓋層壓力 英文
pressure of overlying strata
  • : 動詞1. [書面語] (蓋住) cover 2. [書面語] (底朝上翻過來; 歪倒) overturn; upset 3. 同 「復」 (Ⅱ1. 2. )
  • : 蓋名詞(姓氏) a surname
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 壓構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 覆蓋 : 1 (遮蓋) cover; overlap 2 (植被) plant cover; vegetation3 (保護層 覆蓋物) cover; covering; ...
  1. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能和壩面的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下深,地質條件差,抗沖能弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  2. Finally, based on the stresses analysis of the rock mass, the existed design rules are discussed, and a new method to predict the safe location of the pressure tunnels is developed

    最後,根據對圍巖應場的分析,對現有確定隧洞最小的經驗準則進行了評價,提出一種新的確定隧洞位置的方法。
  3. The deleterious effects of pressurized seepage, percolating through the natural discontinuities in the rock mass, have generally been ignored, resulting in tunnel alignments with inadequate lateral and vertical cover

    隧洞傳統計算方法假定圍巖是不透水介質,忽略了圍巖中滲流和滲透的不利影響,從而導致設計時隧洞軸線方向上厚度不足。
  4. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能和壩面的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下深,地質條件差,抗沖能弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
分享友人