規定水位 的英文怎麼說

中文拼音 [guīdìngshuǐwèi]
規定水位 英文
dimensioned water level
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 規定 : stipulateprovide
  • 水位 : stage; water level
  1. Dundrum, south, or sutton, north, both localities equally reported by trial to resemble the terrestrial poles in being favourable climates for phthisical subjects, the premises to be held under feefarmgrant, lease 999 years, the message to consist of 1 drawingroom with baywindow 2 lancets, thermometer affixed, 1 sittingroom, 4 bedrooms, 2 servants rooms, tiled kitchen with close range and scullery, lounge hall fitted with linen wallpresses, fumed oak sectional bookcase containing the encyclopaedia britannica and new century dictionary, transverse obsolete medieval and oriental weapons, dinner gong, alabaster lamp, bowl pendant, vulcanite automatic telephone receiver with adjacent directory, handtufted axminster carpet with cream ground and trellis border, loo table with pillar and claw legs, hearth with massive firebrasses and ormolu mantel chronometer clock, guaranteed timekeeper with cathedral chime, barometer with hygrographic chart, comfortable lounge settees and corner fitments, upholstered in ruby plush with good springing and sunk centre, three banner japanese screen and cuspidors club style, rich wine - coloured leather, gloss renewable with a minimum of labour by use of linseed oil and vinegar and pyramidically prismatic central chandelier lustre, bentwood perch with a fingertame parrot expurgated language, embossed mural paper at 10 - per dozen with transverse swags of carmine floral design and top crown frieze, staircase, three continuous flights at successive right angles, of varnished cleargrained oak, treads and risers, newel, balusters and handrail, with stepped - up panel dado, dressed with camphorated wax, bathroom, hot and cold supply, reclining and shower : water closet on mezzanine provided with opaque singlepane oblong window, tipup seat, bracket lamp, brass tierod brace, armrests, footstool and artistic oleograph on inner face of door : ditto, plain : servant s apartments with separate sanitary and hygienic necessaries for cook, general and betweenmaid salary, rising by biennial unearned increments of 2, with comprehensive fidelity insurance annual bonus, and retiring allowance based on the 65 system after 30 years service, pantry, buttery, larder, refrigerator, outoffices, coal and wood cellarage with winebin still and sparkling vintages for distinguished guests, if entertained to dinner evening dress, carbon monoxide gas supply throughout

    一截彎木上棲著一隻馴順得能停在手指上的鸚鵡它吐字文雅,墻上糊著每打價為十先令的壓花壁紙,印著胭脂紅色垂花橫紋圖案,頂端是帶狀裝飾一連三段櫟木樓梯,接連兩次拐成直角,都用清漆塗出清晰的木紋,梯級登板起柱欄桿和扶手,一律用護板來加固並塗上含樟腦的蠟浴室里有冷熱管,盆湯淋浴,設備俱全。於平臺246上的廁所里,長方形窗子上嵌著一塊毛玻璃,帶蓋的坐式抽馬桶,壁燈,黃銅拉鏈和把手,兩側各放著憑肘幾和腳凳,門內側還掛有藝術氣息濃厚的油畫式石版畫。另外還有一間普通的廁所廚師打雜的女僕和兼做些細活的女傭的下房裡也分別裝有保健衛生設備僕役的工錢每兩年遞增兩英鎊,並根據一般忠誠勤勞保險,每年年底發獎金一英鎊,對工滿三十年者,按照六十五歲退職的,發退職金餐具室配膳室食品庫冷藏庫主樓外的廚房及貯藏室等堆煤柴用的地窨子里還有個葡萄酒窖不起泡亮光閃閃的葡萄酒,這是為宴請貴賓吃正餐身穿夜禮服時預備的。
  2. Standard practice for field procedure for constant drawdown tests in flowing wells for determining hydraulic properties of aquifer systems

    用於測層系統硬性的流動井中恆下降試驗現場程序的標準實施
  3. The definition degree of degree is a mark by the bears educational degree and academic level to reach formulary level learning name of grantor

    義學是標志被授予者的受教育程度和學術平達到標準的學術稱號。
  4. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽時計算區域各點降深隨時間的變化,研究流運動律;求解任意邊界條件下的井流量抽問題,預測潛,指導施工開挖進度,評價降方案的合理性。
  5. Article 26 in accordance with the marine environmental protection law and the water pollution prevention law, people ' s governments at all levels shall take measures to protect and improve the ecosystem of fishery waters, prevent pollution and investigate the responsibility of any unit or individual that pollutes the fishery waters

    第二十六條各級人民政府應當依照《海洋環境保護法》和《污染防治法》的,採取措施,保護和改善漁業域的生態環境,防治污染,並追究污染漁業域的單和個人的責任。
  6. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮對庫岸滑體穩性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一科學研究價值的研究成果: ( 1 )研究結果發現,的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下升高降低了滑坡體的有效應力,另一方面是由於地下的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫、地震以及庫由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩性分析評價時對計算工況選擇及其作用荷載的計算更具范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩性綜合分析評價系統,使對滑坡體穩性分析計算更方便、更準確; ( 5 )將上述滑坡體穩性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩性分析的具體事例中,分析結果表明,本文所提出滑坡體穩性綜合分析評價方法對三峽庫區的滑坡穩性分析是實用可行的。
  7. A ccording to actuality of boiler control, putting forward fuzy control rule of paramete self - adaptability, designing the self - adaptability fuzz pid control system. this system gets over disadvantage of no precision and difficulting to adjust parameter for using tradition control methods. this article designes cascade pidcontrol system and self - adaptability fuzzy pid three impulse control system for

    根據鍋爐控制現狀,提出了參數自整模糊控制則,設計了二輸入三輸出自適應模糊pid控制器對汽包進行控制,克服了傳統控制方式的控制效果不精確和參數難以調整等缺點。
  8. 2 while laid up out of commission as provided for in clause 4 below, including lifting or hauling out and launching, while being moved in shipyard or marina, dismantling, fitting out, overhauling, normal maintenance or while under survey ( also to include docking and undocking and periods laid up afloat incidental to laying up or fitting out and with leave to shift in tow or otherwise to or from her lay - up berth but not outside the limits of the port or place in which the vessel is laid up ) but excluding, unless notice be given to the underwriters and any additional premium required by them agreed, any period for which the vessel is used as a houseboat or is under major repair or undergoing alteration

    在下述第4條的船舶擱置不用,包括起浮或拖帶及船舶下,以及在船舶被移入船塢或遊艇停泊港、拆除設備、配置設備、徹底檢修、日常保養,或是在船舶接受檢驗的情況下(也包括進或出船塢、偶爾擱置不用或配置設備而造成的船舶擱置、離開原地去進行救助或基於其他目的,開往其泊或從泊離開,但以不離開該船舶被擱置的港口或地點為限) ,但不包括船舶被用做船宅或船舶正進行重大修理或船舶正在改造的情形,除非承保人得到通知並同意所要額外增加的保險費。
  9. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域文情勢、河道演變律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩性分析,設計潮的分析計算,洪潮組合方案擬,工程前後對河道及流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  10. Article 15 enterprises and institutions that discharge pollutants into a water body shall pay a pollutant discharge fee in accordance with state regulations ; if the discharge exceeds the limits set by the national or local standards, they shall pay a fee for excess discharge according to state regulations

    第十五條企業事業單體排放污染物的,按照國家繳納排污費;超過國家或者地方的污染物排放標準的,按照國家繳納超標準排污費。
  11. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理置和營運現狀,說明了船閘在航道建設和資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確其中包括東溝船閘過閘貨種和貨運量發展的預測,並確東溝船閘的設計代表船型及營運組織;第三章東溝船閘改造工程設計本章通過船閘改造工程主要技術參數:船閘模、尺度、設計和高程等的確,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設計,並選了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個設計方案進行全面綜合比較后,確了推薦方案。
  12. Article 26 for those bridges, approaches, wharves and other engineering structures across a river which seriously intercept or block water, the water conservancy administrative department concerned may, according to the flood control standards, report to the people ' s government at or above the county level that will, within the scope of powers provided by the state council, order the construction unit to rebuild or dismantle them within a time limit

    第二十六條對壅、阻嚴重的橋梁、引道、碼頭和其他跨河工程設施,根據防洪標準,有關行政主管部門可以報請縣級以上人民政府按照國務院的權限責令建設單限期改建或者拆除。
  13. In the topic 1, utilizing the natural lysimeters and drainage region in wudaogou station, based on expriment and imitation methods, frist the hydrology effect of drainage has been analyzed, and then the index of water logged farm drainage and suitable ground water level have been provided. on the theory of darcy rule and farm hydrodynamics, the standard and pattern and empirical formula of farm drainage system have been presented as well, and provide scientifically foundation for drainage planning

    在農田排技術研究中,利用五道溝實驗站地中蒸滲儀和排試驗區,採用試驗法和動態模擬法,分析了排工程的文效應,提出了農田排漬標準和作物適宜的地下埋深,採用達西律和農田動力學原理,提出了農田排系統的格、布置方式及經驗公式,為排工程劃提供依據。
  14. This thesis takes the process of the futures delivery as the object of the research, analyzes and investigates the physical delivery system. firstly the thesis introduces the connotation, status and functions of the futures delivery in the futures market, and then makes a deep research in the futures delivery systems concerned such as the designing of the grade of the listed commodity at par as well as the premium and discount, the selection of the delivery locations and the regulation on the designated delivery warehouses, as well as the management and circulation of the warehouse receipts. on the basis of the above - mentioned analysis, this paper makes some constructive suggestions and recommendations on the improvement and innovation of the futures delivery to be taken by the chinese futures market at the present stage

    本文首先闡明了期貨交割在期貨市場中的經濟內涵、樞紐地和功能保障作用;然後,從合約設計出發,用均衡原理揭示了期貨交割制度與品種活躍和風險控制的有機關系;進而,對比中外交割制度,通過比較,認清了中外現貨基礎、誠信和法制等環境因素的差距,明白了「拿來」的內容和如何構建中國特色的交割制度;從而,就小麥國家標準的歷史局限性,標準和替代交割品級及其升貼的設計原則,交割標準把握的出發點和落腳點,交割倉庫設置和管理的目標和狀況,標準倉單沾滯的根源等期貨市場交割制度及相關,進行了深入而細致的剖析。
  15. H. t. fresh cooling system is filled cooling water of soften additive expansion chamber arrives at water level of being specified

    3高溫淡冷卻系統已注入軟化添加劑的冷卻,膨脹箱達到高度。
  16. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態劃方法中把庫的整個調度期,按句劃分為t個時段,以庫的蓄量s或蓄z和入庫量q作為狀態變量,以庫放量q或電站出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確性徑流過程時,分別按缺量d最小作為目標函數建立多階段確性動態劃數學模型。
  17. How many pumps were turned on should be based on the dynamic design according to project target. and how many pumps should be in operation in standard shut off procedure. it was approved that although the theoretical boundary of decline of groundwater level is 10m, the actual boundary is only about 6m

    提出了一些與真空預壓加固地基設計相關的概念和處理方法,如義真空預壓加固區場地形狀系數,提出按加固土體體積來確射流泵數量、根據工程需要動態設計開泵量、增加停泵標準中對開泵量的等設計思想等,論證了真空預壓加固地基時地下下降的理論極限深度為10m ,而實際極限深度約為6m 。
  18. In this part, the author, with a far - sighted version, systematically puts forward six special suggestions on it : ( a ) reasonable arrangement of the legislation system of the corporation manager, ( b ) redelimitation of the legal status and authority of the corporation manager ; ( c ) clear stipulation of the director of the company may not concurrently serve as the manager, ( d ) strengthening the civil obligations of the corporation manager, ( e ) setting up the managerial system of stimulus and corresponding restraints, ( f ) introduction of the system of protection and remedy on the managerial rights to our country

    基於以上幾部分的分析,文章第四部分到渠成地提出了公司經理法律制度在中國的創新與完善。作者以高屋造瓴之姿態從六個方面系統地提出了關于中國公司經理法律制度創新與完善的若干具體建議:合理安排公司經理法律制度之立法體例,重新界公司經理的地與職權,明確公司董事不得兼任經理,加強公司經理的民事法律責任,建立經理激勵與約柬相容的制度,引進公司經理保護與權利救濟機制,從而使本部分的內容形成一個完整的體系。
  19. In the regulation in company worth and domestic worth clauses : to the flood, seismic sea wave, ice approach, rainstorm, the natural disaster such as mud - rock flow belongs to insurance scope of business, the person that every attends insurance ( safe unit and individual ) the dangerous rate that has state and seat area to suffer water to browbeat by belongings builds insurance contract or bond, pay insurance premium regularly

    在企業財產和家庭財產保險條款中:對洪、海嘯、冰凌、暴雨、 ,泥石流等自然災難都屬于保險業務范圍,凡參加保險者(保險的單和個人)按財產擁有狀況和所在地區受威脅的危險程度建立保險合同或契約,期交納保險費。
  20. In case a non - navigable stream or man - made waterway becomes navigable after a dam or sluice gate structure is built, the construction unit shall simultaneously build ship passage facilities or reserve sites for such facilities, and the expenses needed thereby incurred shall be borne by the communication departments concerned, unless there are other state - provisions applicable

    在不通航的河流或者人工道上修建閘壩后可以通航的,閘壩建設單應當同時修建過船設施或者預留過船設施置,所需費用除國家另有外,由交通部門負擔。
分享友人