解吸塔 的英文怎麼說

中文拼音 [jiě]
解吸塔 英文
desorber
  • : 解動詞(解送) send under guard
  • : 動詞1 (把液體、氣體等引入體內) inhale; breathe in; draw 2 (吸收) absorb; suck up 3 (吸引) a...
  1. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵反循環的方式排渣,既能有效決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆採用液壓起立,減少了輔助作業時間。
  2. The term guru - tva - akarshan can be interpreted to mean, ' to the attracted by the master "

    古魯? ?瓦? ?阿卡薩這個術語釋起來意思是: 「被師傅(主人)所引」 。
  3. The leakage and treatment of solvent desorber in a butadiene unit of organic synthesis plant are introduced

    摘要介紹了某石化公司乙腈法抽提丁二烯裝置的一次溶劑解吸塔泄漏情況和處理過程。
  4. An integrated absorption / desorption unit with single tower in fccu is proposed

    提出一種新的催化裂化收-流程。
  5. Abstract : an integrated absorption / desorption unit with single tower in fccu is proposed

    文摘:提出一種新的催化裂化收-流程。
  6. Cracks analysis of desorption tower body

    解吸塔體裂紋成因分析
  7. Over the country, the excellent run of almost a thousand towers provided by our company has proved our products and technic successful in many industrial fields. by the desorption tower, saturated water tower, copper liquor scrubber and desulfurization tower in fertilizer industry, and by dealcoholization and dealdehyde tower in formaldehyde industry, the performance indexes of design are all accomplished. the towers, which are successfully made from haynos alloy by our company, contribute to the acetic acid industry

    經多年來全國各行業近千座器運行證明,我公司提供的填料在化肥行業中解吸塔包和熱水銅洗脫硫,在甲醛行業中脫醛脫醇都達到指標要求,哈氏合金加工成功,為醋酸行業作出了貢獻。
  8. The results showed that the heat taken from the feed section should be the same as in the double tower case, and the added reboiler should be located in the middle of the desorption section

    對新的催化裂化收-流程工藝條件的模擬研究結果表明,進料取熱應和雙流程相同,而加熱板宜選在段的中部。
分享友人