計算周期 的英文怎麼說

中文拼音 [suànzhōu]
計算周期 英文
computation period
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. A computer image restoration algorithm based on the aperiodic model of deconvolution

    一種基於非卷積反演模型的機圖象恢復演
  2. Trial 2, effect of supplemental copper of different type on nutrition and specific immunity of mice - ii the grouping of trialt animal was the same as trial 1, at the first day, second day, third day, one mouse was injected with pha brine fluid for 10mg / kg avoirdupois after weighing in the same time in each repeat, following the 7d, 14d, 21d, 8d feeding period, after weighing, blood was made, wrigh - giemsa coloration, counting the number of lymphocyte female cell and overage lymphocyte, index of immune organ, copper concentration in liver and spleen

    試驗二,不同形式銅對小鼠營養與特異性免疫功能的作用-試驗動物分組同試驗一,進入正式試驗后,在每第1天、 2天、 3天同一時間每重復選取1隻小鼠,稱重后每天按10mg kg體重肌肉注射一次植物血凝素生理鹽水溶液,並於試驗第7天、 14天、 21天、 28天稱重后尾尖取血,姬姆薩-瑞氏染色,t淋巴細胞轉化率,免疫器官指數,測定肝臟、脾臟銅含量。
  3. The attempt to calculate the cohesive energy of metals has scarcely been carried beyond the first column of the periodic table.

    金屬結合能的嘗試幾乎沒有超過表上的第一行的范圍。
  4. Because of the huge memory space and rapd calculation speed that compuer possesses, we can manage the ekisted drawings central1y and search them rapidiy in conclusion, the high quality and low price product wtth the help of applytng the cad technology will not only satisfy the requiremen of the market but also help factory amer apply the compeer technology in the process of production ( for example, haher production managemen0 we has applied thes systetn in extuion embranchmen factory and obtained favorable effect wich reveds tha thes system has widely applytng prospect and uti1ity value

    該系統將成組技術的分類編碼原理和機輔助設技術應用於擠壓鋁型材的產品開發設和產品圖紙的管理中,不僅可以極大地提高產品設質量、縮短產品開發,還可以減少重復繪圖工作及規范制圖方法;同時,利用機存儲空間大、運行速度快的優點,可實現對已有產品圖紙的集中管理和快速檢索。利用機輔助產品開發,不僅能以高質量、低成本的產品迅速滿足市場需求,還可為工廠進一步實施機應用工程(如后續生產管理等)奠定良好的基礎。
  5. The reasons are that in a scavenging grid, which snatches computing cycles from desktop pcs, ownership of the resources remains local and scheduling must accommodate the needs of the owners

    原因在於,拾遺網格是從桌面pc中獲取計算周期,而資源的所有者仍然在本地,所以網格對資源的規劃必須適應資源所有者的需要。
  6. That is to say, inside integrated computation cycle, some is specific day ( or ) actual working hours can exceed 8 hours ( or 40 hours ), but the total actual working hours inside integrated computation cycle should not exceed working hours of total legal standard, should regard as partly more than lengthen working hours and press " labor law " the 44th 1 the regulation pays salary reward, its decide off day sino - frenchly to arrange laborer to work, by " labor law " the 44th the 3rd regulation pays salary reward

    也就是說,在綜合計算周期內,某一具體日(或)的實際工作時間可以超過8小時(或40小時) ,但綜合計算周期內的總實際工作時間不應超過總法定標準工作時間,超過部分應視為延長工作時間並按《勞動法》第44條第1項的規定支付工資報酬,其中法定休假日安排勞動者工作的,按《勞動法》第44條第3項的規定支付工資報酬。
  7. Based on the urgent need that pier protective device primarily designed needed to be tested its crashworthiness by the impact of ship in multi - situation, etc in multi - angle and multi - water, the writer analyzed the critical elements that affect the simulation of the collision between ship and pier protective device, and found the feasible way to deal with the conflict between calculation efficiency and precision. using this method and employing ansys / ls - dyna program, which is the universal nonlinear dynamic analysis software, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented, the simulation of time history course of full - scale mini - collision between ship and pier protective device was taken into reality with a spot of elements ( less than 21000 ) and scanty time ( 9 hours on p4 pc )

    本文在前人研究的基礎之上,結合船橋碰撞實例,對碰撞機模擬模擬的關鍵技術進行了研究,在效率與精度的矛盾中找到平衡,對一艘2000噸級散貨船橫橋向正撞廣東管洲河大橋橋墩防撞鋼套箱這一種工況進行了機模擬模擬,實現了以較小的單元和較短的時間模擬碰撞的時間歷程,模擬滿足工程精度要求,解決了目前碰撞模擬計算周期太長的問題,同時模擬模擬得到的結論對該類防撞裝置提供了有價值的參考。
  8. Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method

    本文基於netomac模擬軟體,以發電市場預調度劃模型及演法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度內的市場購電價格最小為目標的發電市場預調度劃模型,並根據預調度劃問題狀態數多、變量多、混合整數、非解析的特點,將預調度劃模型的目標函數簡化為各時段的市場清電價最小,設了三段式預調度演法:用靜態規劃法求解整個預調度內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。
  9. The high - order finite element methods are used to obtain high accurate solutions of the steady flows. characteristics of the chaotic mixing are analyzed by numerical simulation and experiment through examining of the asymptotic coverage of a passive tracer

    數值模擬採用高階有限元獲得高精度的流場,計算周期和非混沌混合中的染色液滴對流圖案和實驗進行比較。
  10. Calculate number of periods

    計算周期數。
  11. " developerworks, june 2005 provides a roadmap for harvesting spare compute cycles

    」 ( developerworks , 2005年6月)給出了一個利用空閑計算周期的路線圖。
  12. 6. three fast algorithms for determining the k - error linear complexity of periodic sequences are proposed

    提出三個計算周期序列k -錯線性復雜度的快速演法。
  13. If the lowest computation period for one unit is one minute and the highest 10 minutes, then clients could easily contact the server for more information at anything between 20 - and 200 - minute intervals

    如果一個單元的最短計算周期為一分鐘,最長時間為10分鐘,那麼客戶機很可能每過20分鐘到200分鐘向服務器請求更多信息。
  14. 3. a fast algorithm is proposed for computing the linear complexity of a binary sequence with period p ? and generalized one for determining the linear complexity of a sequence with period pfl over gf ( q )

    提出了一個計算周期為p ~ n的二元序列的線性復雜度的快速演法,並推廣為確定gf ( q )上為p ~ n的序列線性復雜度的快速演法。
  15. Based on these, it is discussed how to realize and simplify it in dsp system. the primary parameters of the hardware system are also estimated such as sample frequency, calculation period and the amount of memory

    並在此基礎上,分析了該演法在dsp處理器中的實現以及運量的初步簡化,估了該波束形成演法所要求的硬體系統載荷? ?運量(計算周期) 、采樣率以及數據存儲量。
  16. Imagine an environment where free computing cycles are dynamically gathered for real - time on - demand computing directly from the data - generating instruments themselves instead of monolithic large - scale, batch - orientated computation

    假設有這樣一個環境:將空閑的計算周期搜集起來,根據需要提供給數據生成的基礎設施中所執行的使用(而不是那些大型的、面向批處理的) 。
  17. This dissertation mainly investigate important measure indexes ? inear complexity, k - error linear complexity and period, on the security of stream ciphers, design several fast algorithms for determining the linear complexity and k - error linear complexity of periodic sequences

    本文主要研究流密碼安全性重要的度量指標- -線性復雜度、 k -錯線性復雜度和等,設出若干計算周期序列的線性復雜度和k -錯線性復雜度的快速演法,得到如下主要結果: 1
  18. This essay explores how to figure out the period of calculating interest as well as times of it in the analysis of the feasibility of real estate projects and other problems, such as effect of tax variation, calculation of internal return rate and analysis of uncertainty

    摘要本文理論聯系實際地探討了房地產開發項目可行性研究中息次數的確定、稅收變動的影響、內部收益率的試和不確定性分析等疑難問題,對進行房地產開發項目可行性研究具有一定的實用價值和指導作用。
  19. The internal damping forces and the nonlinear elastic forces in the analytical form are deduced from the kelvin. voigt viscoelastic model. a smart method basing on the concept of period number is proposed for evaluating periodic solutions of the nonlinear system and determining the periodic. doubling bifurcation points

    ( 2 )建立了一個4dof單跨彈性轉子在非線性油膜力、非線性內阻力和非線性彈性力作用下的非線性動力學模型,提出了求解的數值方法,以及計算周期數及分岔點的演法。
  20. As written, the function counts weekends, new year ' s day, memorial day, the fourth of july, labor day, thanksgiving, and christmas as non - business days

    正如所編寫的,這個函數能用來末,新年,紀念日,美國國慶日,勞工節,感恩節,以及聖誕節這些非商業的日
分享友人