計算荷重 的英文怎麼說

中文拼音 [suànzhòng]
計算荷重 英文
assumed load
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : 荷名詞(蓮) lotus
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設有著要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. The calculation and design procedures of air conditioning load, ground loop heat exchangers, radiant floor system, distribution system between heat pump and build are mainly introduced

    點介紹了建築空調負、地下埋管換熱器系統、輻射地板系統以及熱泵和建築物內分配系統設等方面的內容。
  3. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的載道路資料為主,從實際出發,結合理論,對載標準進行了詳細的討論,分別給出了水泥混凝土路面與瀝青混凝土路面的載標準了;同時,通過大量的水泥混凝土板底應力,推導出了混凝土面板載與板底應力水平的關系式;給出了水泥混凝土路面與瀝青混凝土路面的交通分級;通過對試驗路各結構層進行承載板測試,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有水泥路面設中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模量的修正公式。
  4. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    系統有硬體和軟體組成,硬體的基礎是採集裝置;軟體採用windowsdna構架,使用分散式,解決了原來系統的任務過于繁造成數據服務器不能承擔負的問題;服務方面提供基於ie的mis系統,使數據查詢和報表服務擺脫了原來的專用網路的限制;新增加模塊「標準互連」模塊是針對目前各種自動化系統不兼容的問題而產生的,可以實現電力自動化在更高層次上的實現,在這個模塊中,有意識的採用
  5. This paper emphasize study the seepage of vacuum - heaped load combining precompression., deduce the drainage quantity computation formula for stage loading in soft soil. an example show that the results of calculation are in good agreement with the measured value, this explain that the formula is rational

    本文點對真空堆載聯合預壓法的滲流進行了研究,得出了在分級加下軟土地基滲流量的公式,例表明其值與實測值較吻合,說明所建模型是比較合理的。
  6. Choose two nodes on the edge of the structural to compare the results calculating by the finite element program midas, then we can draw a conclusion that these kinds of space truss systems is sensitive to the libration of the dynamic wind loads. to consider this factor is very necessary in the process of design, we will use the pulsant augmentation coefficient to realize it

    比較靜力風載和動力風載作用下的有限元軟體的結果,選取結構邊緣部分的兩個節點,對比它們在兩種方法下的最大位移的結果。經過比較可以看出量輕、頻率低、阻尼小的柔性建築物對風載的橫向振動是很敏感的,在進行工程設時應該考慮這種因素,並可採用乘以風振系數等相應方法來加以體現。
  7. This paper also tested each model and system - the second loop of qinshan nuclear power station ( the second term ) , computed the balance point , tested the performance of step disturbance and runback loads for system ( no adding adjustment system ) , analyzing the factors effecting the first tiptop rotate speed of turb and time which the rotate speed reach the tiptop

    在模擬模型上,完成了穩態、系統階躍擾動試驗、甩負試驗(未加調節系統)等測試,主要監控和分析了汽輪機動態特性中兩個要參數:汽輪機第一飛升轉速、飛升時間。
  8. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很要的作用,樁端阻力所佔比例甚少。這與設樁基時的模式相差很大,承載力也較設增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬和定量研究。
  9. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容、側壓力系數、垂直載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並出了相應的襯砌結構可靠指標。
  10. The main work of this thesis is to study of electronic structure of cathode material. some structure paramters, such as total energy, atomic net charge, atomic overlap population, of the model li5mn4o83 +, li5mn12o24 -, li7co6o2015 -, li7ni6o2015 -, li5mn2co2o83 +, li5mn2ni2o8 are calculated

    論文點研究了正極材料電子結構,通過對尖晶石型錳系材料模型li5mn4o83 +和li5mn12o24 -和層狀結構的li7co6o2015 - 、 li7ni6o2015 -模型以及摻雜模型li5mn2co2o83 + 、 li5mn2ni2o8的,得到了各個原子簇體系的總能量、凈電分佈、原子疊布居值。
  11. According to mechanics theory the formulary of flexural rigidity, axial rigidity, shearing rigidity are deduced. the framework membrane structures are widely used present. the nonlinear finite element method is used in this dissertation, after form - finding the shape are overlapped the framework structure, the shape and the framework structure make up integrality structure, the nonlinear finite element method is employed, due to deadweight and wind load and snow load and self - stressing the response of the framework membrane structures are analyzed, and computation results of integrality model and dividing model have been compared

    骨架式膜結構是目前應用最廣泛的的膜結構,本文運用非線性有限元理論,將找形后的膜面覆蓋在骨架結構上,膜面與鋼結構組成整體,採用非線性有限元方法對骨架式膜結構在自和自應力、風載、雪載等共同作用下的反應進行了分析,對膜結構和骨架結構分開和整體模型進行了比較。
  12. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受過程的實際測試,得出了樁、土分擔載比例和變化過程,從而為樁、土的提供實際依據;從設置的大量沉降觀測點中所得到的沉降資料,得出載、沉降變化規律,從而指導在實際施工中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴後果;通過沉降規律分析,得出了適用於軟土地區的樁基沉降方法,用於指導實際施工,以滿足沉降控制的強制性標準。
  13. Abstract : constraining moment between winding beam and cantilever beam should be considered when cantilever beam and its complete winding beam are in the case of bearing heavy load, even working carriers. this paper uses the the ory of constraining moment of crossing component to solve this problem, also st ates the calculating theory of constrainging moment, and does deduction of formula

    文摘:鋼筋混凝土懸臂樑上與其整澆的邊梁在負,甚至做為要承構件情況下,應考慮邊梁與懸臂梁相互之間的約束力矩.本文採用相交構件約束力矩理論來解決這一問題,並對約束力矩原理進行論述和公式推導
  14. It is also pointed out that the shear stress along the flow - in direction existing near the junction of straight and curve edges is one of the major components of drawing pressure, and it is very important in the calculation of drawing load of non rotational symetrical drawing

    並且指出,法蘭直、曲邊交界附近存在的流入方向剪切力是拉深力的主要成分之一,在非回轉對稱拉深載中非常要。
  15. The research of load calculation is very important for flight safety of the civil aircraft

    對於民用飛機來說,載的研究對于飛行安全有著非常要的意義。
  16. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型工況,並具體給出了相應的作用載的方法,使在庫區岸坡滑體穩定性分析評價時對工況選擇及其作用載的更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  17. Then, made use of software ansys to calculate the strength of a catamaran ferry structure, applied the formulae deduced in chapter 3, selected reasonable restraint form, in the whole ship computing result further verified the formula then on the base of a model of the whole ship, used fea to study the hull connecting structure with the limit of strength, deduced the useful assumption for after research

    並將要環節連接橋單獨取出,進行專門的簡化模型推導,根據連接橋上與片體相連處節點的受力情況分析應力分佈規律,尋找合理的載施加方法,並根據實際情況對模型進行約束,使連接橋單獨的結果與全船相吻合,從而達到模擬全船的簡便的目的。
  18. From the beginning construction of the raft foundation to sealing roof during the overall construction procedure, the representative seven step loads are selected to apply to the simulating models

    點選取了從筏板施工開始至主樓結構封頂的全過程中具有代表性7次載進行模擬。
  19. Then, mechanical responses of pavement structures were analyzed with elasticity theory, based on actually applied pattern of heavy loading, analysis method of ultimate bearing capacity of pavement structures was proposed, and the factors affecting ultimate bearing capacity were analyzed also, which provided a theoretical basis for the restriction of alex load

    其次,根據實測載作用面積和輪胎接地壓力,載作用下水泥混凝土路面結構的力學響應,提出了分析混凝土路面極限承載力的方法,並分析了極限承載力的影響因素,為限載提供了理論依據。
  20. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標進行理論與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論值與現場實測值具有良好的一致性,進而通過變形協調理論對載?沉降曲線進行數值,並用不同施工工藝的實例說明了理論載?沉降曲線與實測載?沉降曲線的擬合效果,從而達到可在不做靜載試驗或少做靜載試驗的情況下通過剪切波速和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中鉆孔灌注樁承載性狀,這對于工程初步設中減少設的盲目性具有十分要的現實意義。
分享友人