設備安置 的英文怎麼說

中文拼音 [shèbèiānzhì]
設備安置 英文
facilities location
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. Gas welding equipment - safety devices - incorporating a flame flashback arrestor

    氣焊.全性裝.使用火焰
  2. Gas welding equipment - safety devices - not incorporating a flame flashback arrestor

    氣焊.全性裝.未使用火焰
  3. Gas welding equipment - safety devices - part 1 : incorporating a flame flashback arrestor

    氣焊.全裝.第1部分:裝回火
  4. Gas welding equipment - safety devices - part 2 : not incorporating a flame flashback arrestor

    氣焊.全裝.第2部分:不裝回火
  5. ; gas welding equipment - safety devices - part 1 : incorporating a flame flashback arrestor ; german version en 730 - 1 : 2002

    氣焊.全裝.第1部分:裝有火焰
  6. ; gas welding equipment - safety devices - part 2 : not incorporating a flame flashback arrestor ; german version en 730 - 2 : 2002

    氣焊.全裝.第2部分:無火焰
  7. Acetylene generator adopts low pressure water submerged calcium carbide process and is equipped with automatic slagging off and water replenishing device which ensures high reliability and safety standard

    乙炔發出器採用電石入水低壓式,有自動排渣和自動加水裝全可靠。
  8. Erection of low voltage installations - part 7 : requirements for special installations or locations - section 753 : floor and ceiling heating systems ; german version hd 384. 7. 753 s1 : 2002

    低壓裝.第7部分:特殊裝或位要求.第753節
  9. Safety in electroheat installations - part 3 : particular requirements for induction and conduction heating and induction melting installations

    電熱全.第3部分:感應和傳導加熱以及感應熔煉裝的特殊要求
  10. It has overload protection equipment which insures the safe running of the equipment

    有過載保護裝,保證全運行。
  11. Medical electrical equipment - particular requirements for safety - specification for high voltage generators of diagnostic x - ray generators

    醫用電氣.全性專門要求. x射線診斷裝的高壓發電機規范
  12. Electrical installations of buildings part 7 : requirements for special installations or locations section 707 : earthing requirements for the installation of data processing equipment

    建築物的電氣裝.第7部分:特殊裝或位的要求.第707部分:數據處理裝的接地要求
  13. Low the harnessed implement to a flat surface until the embedding legs touch it and the depth control wheels are in the air

    降低平面直到接觸到掩埋臂,並且深度控制輪懸空。
  14. Measure the spacing between the bottom of depth wheels and the surface ? the result is approximately the embedding depth

    測量深度控制輪底部與平面的距離就為大致的埋深度。
  15. To develop and deploy icom tm ( internet - connectivity - on - module ) architecture that enables secure access by common devices and equipment to broadband internet or intranets

    開發和應用因特網互聯智能模塊體系,使普通全可靠地接入寬帶因特網或企業內部網。
  16. Safety requirements for arc welding equipment - part 12 : coupling devices for welding cables

    弧焊全要求第12部分:焊接電纜耦合裝
  17. Grasp the maintenance, management and application of master data of computer ( sap - pm module ) and repair content of various equipments

    在基建施工和生產準階段,參與機械裝、調試,確保裝順利開車投產。
  18. Attend the installation and commission of instrument during the capital construction and production preparation phase to ensure smooth start - up of plant

    在基建施工和生產準階段,參與機械裝、調試,確保裝順利開車投產。
  19. Participate in the installation commissioning of machinery during the capital construction production preparation period to ensure production starts up smoothly

    在基建施工和生產準階段,參與機械裝、調試,確保裝順利開車投產。
  20. Transmitting data by snmp, administrator can use network manager supervise network even though devices been installed in obscurity and far away place

    這樣,通過使用snmp協議進行數據傳輸,即使設備安置在偏僻遙遠的地方,管理人員也可以使用網管站對它們進行集中管理。
分享友人