設備檢查位 的英文怎麼說

中文拼音 [shèbèijiǎnzhāwèi]
設備檢查位 英文
equipment check bit
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  1. Place the units in their intended mounting locations to check the cable length and monitor installation conditions

    放入計劃好的安裝置,電纜長度和監視器安裝條件。
  2. 9 inspect the amount, arrangement, fixing position of the signal equipment ( inspect all kinds of signal equipment according to “ navigation signal arrangement and mast structure drawing ” “ safe drawing ” ( such as signal light, signal shape things, signal flag, pyrotechnic signal, self igniting light of lifebuoy, sound signal etc ) whether satisfy finished plan, and check the qualified certificate of this equipment before and after installation on the ship

    信號驗與試驗(按照《航行信號布置及桅桿結構圖》 , 《安全圖》 )各種信號(如信號燈、信號形狀用品、信號旗、煙火信號、救生圈的自亮燈、聲音信號等)的數量、布置、安裝置是否滿足計的完工圖紙,並在安裝到船上之前和之後這些的質量合格證。
  3. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺重型吊車噸及bc跨( 1 ) ( 8 )軸線框排架各層豎向()荷載后,對廠房結構,尤其鋼吊車梁系統進行測鑒定與加固計的實際工程,首先對廠房結構進行了現場調研、技術、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據測、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  4. The chinese university of hong kong is employing two types f advanced computer technology to examine pap smears from its community clinic at prince of wales hospital for the prevention of cervical cancer

    香港中文大學引入先進電腦,提高其於沙田威爾斯親王醫院的預防宮頸癌驗社區診所所做的帕氏抹片的準確度。
  5. Approximately three months prior to the scheduled date for mechanical completion, buyer shall advise seller that it is ready to have a minimum of two seller representatives, to be provided through seller ' s affiliate to proceed to the site, at buyer ' s expense, to inspect the plant and to ascertain that the plant has been built in accordance with the project specifications and is ready for commissioning

    在擬定的機械完工日期前3個月左右,買方應通知賣方準要賣方從其所屬單選派至少兩名代表來現場對工廠進行,並確定工廠的建是否符合項目技術規范,是否具了試車的條件;選派上述人員而發生的費用應由買方承擔。
  6. A repairperson viewing a broken piece of equipment could see instructions highlighting the parts that need to be inspected

    修理技工在的故障部時,可以看見一些重點式的說明,指出哪些零件需要
  7. The preparing work before test run : first organize test run guide group consisted of supply party, demand party and installation party to check the installed qualified equipment ( machine, electricity, liquid, gas ) in an all - round way to see that circuit, water - way, gas - way and oil - way are switched on ; that all fastener, bolts and nuts are tight ; that all lubricating points and cooling points are put in position

    試運轉前的準工作:首先應組織有關(供方、需方、安裝)等單參加的試車領導小組,對已安裝合格的(機、電、液、氣)進行全面的,電路、水路、氣路、油路是否接通,所有的緊固件、螺栓、螺母等是否擰緊,各潤滑點和冷卻點是否到
  8. Sync check relay a sync check relay is an electrical device that monitors the phase relationship between two voltage sources and provides a signal when the voltage sources are within specific preset parameters

    同步繼電器同步繼電器是監測兩個電壓源之間的相關系的電氣,如果電壓源間的關系在預定的參數范圍內,它就會發出相應信號。
  9. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 3 - 30 : examinations and measurements - polish angle and fibre position on single ferrule multifibre connectors

    光纖互連和無源元件.基本試驗和測量程序.第3 - 30部分:和測量.單套圈多纖維連接器的拋光角度和纖維
  10. It is an ideal equipment for maintenance, care, tyre - changing and the comprehensive test, check and adjustment of each positioning parameter of the front wheels of all sorts of autos

    是各種汽車維修、保養、更換輪胎及對前輪各定參數的綜合測試、和調整的理想
  11. Fire - fighting equipment ' s should be placed in a visible area. check periodically if the equipment ' s are in good order and change damaged equipment ' s as soon as possible

    滅火應照規定放置於明顯易取之置,並定期保持可用狀態,滅火周圍應保持暢通無阻。
分享友人