設備檢查 的英文怎麼說

中文拼音 [shèbèijiǎnzhā]
設備檢查 英文
dc device check
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  1. We should judge the adhibit of solder paste before screen printing by automatic machine or by hand

    我們在進行錫膏印刷前應對錫膏進行一定的測。如果沒有專用也可以用以下的方法一下。
  2. Malfunctioning of portable screening devices used for on - the - spot breath tests

    用作即場呼氣測試的手提失靈的問題
  3. Place the units in their intended mounting locations to check the cable length and monitor installation conditions

    放入計劃好的安裝位置,電纜長度和監視器安裝條件。
  4. Check the running and operation of power distribution unit, determent peccancy operation / using, ensure the normal running of power supply system

    負責各配電的運行和使用,制止違章操作使用,確保各配電的正常運行。
  5. Sufficient or not of the battery on the device should be carefully examined before every flying, so do the every pole, helm and gemel, whether or not is the receiving antenna drew out of the body and in straight, examine the ground effective distance for remote control without the drawing out the antenna, ensure it nomal in rang of 30 - 50 meters

    1 .仔細測試每次飛行前都應該仔細電量是否充足,飛機各個拉桿舵角鉸鏈是否正常,接收機天線是否拉出機身並拉直,在不拉出發射機天線的情況下測試地面有效遙控距離,確定30 - 50米內不發生跳舵情況。
  6. Urmson checks a tarp protecting the metal cage full of computers and custom electronics that serves as the sensate head of the chimeric robot, which has the body of an old marine corps humvee

    這臺異想天開的機器人用電腦與訂做的電子當做頭腦,裝載在舊型海軍陸戰隊悍馬的車體上,而厄姆森正裝載這些的金屬外殼,看看防水布是否保護周全。
  7. Inspectors periodically check wiring, heating plants and chimneys.

    員定期電線系統,暖氣和煙囪。
  8. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下水道,排水管,排氣口,水泥和混凝土,地基等相關的結構進行每季度,每半年,每年的和修理。
  9. Have your life saving apparatus checked periodically

    定期救生
  10. Check life saving apparatus periodically

    定期救生
  11. Responsible for contractor lifting operation management, reviewing important lifting plan, inspecting measures of lifting operation, ensure efficiency and quality of field technical supervision for important lifting operations

    負責對維護承包商修的起重作業的管理,審核重要的起重方案,現場起重作業的準工作,對重要的起重作業進行現場技術監督保證高效、優質完成維護修工作。
  12. Some patients reach a hospital, it is to see a doctor no matter, examination, operation or with medicine, the demand is higher, cure seeking a name sees a doctor, ask an expert to become an operation, with high - grade equipment supervision, with medication best

    有些病人一到醫院,不論是看病、、手術或用藥,要求都較高,找名醫看病,請專家做手術,用高精尖設備檢查,用最好的藥物治療。
  13. Characteristics of methods on checking equipments in laboratory

    實驗室設備檢查方式的特點
  14. Fire services inspection

    消防設備檢查
  15. Check the equipments before manufacturing, to insure the normal operation of the equipments

    做好生產前的設備檢查工作,保證的運行正常。
  16. Inspection of pressure - relieving devices

    壓力釋放設備檢查
  17. The inspection station shall have washing facilities including soap and paper towel for inspector, hot water attemperature above 83 c to disinfect inspection tools, carcass counter and recording device with its placement facility. the facility shall be placed at a location easily accessed by the inspector

    站內應具有清潔劑、擦手紙巾之人員洗手施、用具之攝氏八十三度以上熱水滅菌、屠宰只數計數器、記錄用具及其放置,其置地點應便於員使用。
  18. The need for more checklists that reflect the equipment to be used and operations to be performed

    制訂更多的用於潛水設備檢查和履行作業表的必要性。
  19. In the case of 0. 5mm distance strips only : place the anode on an aligned pre - assembly table prior to flushing and check the electrode for unevenness using the anode testing equipment

    僅在0 . 5毫米的間距帶情況下:在沖刷之前把陽極排列在預組裝好的平臺上,用陽極設備檢查電極的不均勻性。
  20. Responsible for the specification, procurement, design review, inspection and support of installation of process equipment in air separation plants

    負責提供機械件的詳細規格,采購途徑,和支持空分廠的安裝。
分享友人