設備選擇時序 的英文怎麼說

中文拼音 [shèbèixuǎnzháishí]
設備選擇時序 英文
device selection timing
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
  • : 擇動詞(挑選) select; pick; choose
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 選擇 : select; choose; opt; election; choice; culling; alternative
  • 時序 : [地質學] sequence; sequential; time sequence; timing sequence; sequence in time
  1. The second problem is that after material choice, how can we put the material in proper position to avoid mouthpiece vertically. the third problem is that for every belt of the equipment " s material, what angle can we put the joint weld, because the improperly arrangement of joint weld will reduce the equipment ' s pressure _ bearing ability. the thesis has researched the optimizing condition of material selection and weld joint position arrangement in chemical equipment making technology. the author also discuss the optimized model and develop a stock layout software by using microsoft corporation ' s tools visual basic 6. 0

    本文針對以上問題,根據化工生產實踐討論了化工製造過程中對材料用料的優化及排料焊縫位置(環縫、縱縫)的優化,建立了用料優化計算模型及焊縫位置的優化計算模型,並利用microsoft公司的程開發工具visualbasic6 . 0開發了化工智能排樣系統,該系統可以根據用戶材料及用戶在製造過程中各種要求進行優化計算並輸出優質的製造排樣圖。
  2. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控制的重點包括:計階段控制好方案對比、計優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高計質量和深度,注重控制計成果的長期效益;施工階段協助業主好施工承包商,制定出嚴謹、完的施工合同,搞好監造,嚴格執行質量控製程,使工程施工處于受控狀態;同要提高承包商的質量自控能力,堅持施工質量的全過程、多方法、多體系控制。
  3. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程計過程的全面管理,充分論證了計方案的計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程和方法,施工單位遵循一定的監理程,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質的采購管理,通過對采購合同內容的論述,明確了物質采購應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  4. For example, a subscriber might have multiple devices, and your application might select the device based on time of day

    例如,一個訂閱方可能有多個,應用程可以基於一天中的
  5. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的過程中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同為了更加系統地對龍鳳熱電廠及管道的保溫現狀進行分析,開發了一套「絕熱工程信息決策系統」軟體,利用該軟體可以實現絕熱工程的計、評估及施工指導,並可以查閱計及施工標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的。該套軟體的計填補了國內空白,避免了絕熱工程改造、計及施工過程中的無現象,規范了絕熟工程市場,從而為我國絕熱工程的材、計、施工及管理提供科學依據。
  6. Your application might have built - in logic to select subscriber devices based on conditional logic, such as day, time, or message importance

    應用程可能有內置的邏輯來基於條件邏輯(例如,日期、間或消息重要性)訂閱方
  7. On the one hand, we separate the system into four apartment, basic database, quoting for tenders, the document management and consumer information management, on the other hand, we are going on the logic design for the database in detail according to the requirment. we design the database ' s physical structure and distributing according to client end / server mode. we design the database equitment and the database with microsoft sql server

    在應用軟體開發上,按照客戶端服務器模式計出數據庫的物理結構及分佈,在microsoftsqlserver上建立了數據庫及數據庫;在程編碼上,採用面向對象和生命周期法相結合,開發出滿足功能計的應用軟體,並在用戶的應用測試中不斷修改完善,同給出相應的技術文檔;在開發平臺的上,主要用powerbuilder作為前端開發工具。
  8. At the same time, the program applies the result to the module of verifying the electric devices " stability

    該短路計算程為開發其他功能模塊,如在線電氣動、熱穩定校驗以及提供了介面。
分享友人