設定水位 的英文怎麼說

中文拼音 [shèdìngshuǐwèi]
設定水位 英文
designated water level
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 設定 : bd/ dvd settings bd/dvd
  • 水位 : stage; water level
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪特點,結合以往工程實際,對影響跨河橋梁計高度的主要因素? ?計洪流量及其相應洪的確方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪比降的確原則,並介紹了三日降雨量法。
  2. As the old specific water yield apparatus can not put up visually the influence of water level and its decrease depth on the specific water yield of incompact soil sample, a new apparatus is designed

    摘要針對原有給度實驗儀不能直觀反映地下埋深及其降深對給度影響的缺點,計了能採用柱體法測鬆散土體試樣的給度的實驗儀。
  3. During the adjustment. it decided the amount and the rate of humidification. the system can test the states of water level by water lever sensor, thereby the main control module can control the entrance and drain of water and give warnings ; as its good man - machine interaction, the system can expediently set the humidity and the amount of humidification and control water - in valve and leading winds through control panel. the system can communicate with computer thereby the net supervise is enabled

    本系統主要能夠完成以下功能:採集空氣中的濕度狀態,並送入主控模塊,主控模塊根據現有的濕度判斷是保持原來狀態還是進行加濕以及加濕量的大小和加濕速度等;能夠通過傳感器測試的狀態,從而通過主控模塊控制進、排、預報警、報警等;具有良好的人機交互性,能夠通過控制面板比較方便地進行濕度、加濕量、進閥的控制、導風的控制等;能夠和上機進行通信,從而實現網路監控。
  4. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國資源狀況和旱災害、說明庫汛期限制動態控制研究的必要性;介紹了傳統汛限計、汛限靜態控制、模糊汛限過程線存在的問題及其初步改進方法;分析汛期限制動態控制的方法及關鍵問題;進一步闡述了庫極限風險率的義;根據極限風險率義,詳細敘述了不同極限風險指標時、不同汛期限制下起調,庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限動態控制的極限風險率」 。
  5. The problem of modeling and control is a attention focus of people. the boiler water lever is importance index of industry boiler safety and satabilization. it is importance meanimg to ensure water level in definite range for increasing quality of steam and reducing wastage of equipment and insuring safety of whole hert - power - net at present, the mostly method is adopt the routine pid control

    鍋爐的建模與控制問題一直是人們關注的焦點,而汽包是工業鍋爐安全、穩運行的重要指標,保證控制在給范圍內,對于提高蒸汽品質、減少備損耗和運行損耗、確保整個網路安全運行具有重要意義。
  6. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆流計算出來的比非恆具有一的安全儲備;而對于灘地糙率的低估又會造成的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低或彌補糙率增加帶來的抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  7. In regulation works of mountainous channel, determination of designed lowest navigable water level of reach with fluctuating backwater area is a common problem

    摘要變動回區河段計最低通航是目前山區航道整治工程中經常遇到的問題。
  8. Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area

    以廣西繡江交口電站的變動回區河段為例,分析了變動回區的沙特性,分別利用、流量樣本及不同方法計算與分析本河段的,提出了變動回區河段計最低通航的確方法。
  9. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的變化而置船閘。長期以來,由於缺乏對鹽入侵內河河道產生影響的量評估,在船閘運行過程中為防止高鹽度鹹入侵內河,通常採用將內河淡打入閘室的方式來調節通航,船閘的這種運行方式不盡合理。
  10. Designated water level

    設定水位
  11. A ccording to actuality of boiler control, putting forward fuzy control rule of paramete self - adaptability, designing the self - adaptability fuzz pid control system. this system gets over disadvantage of no precision and difficulting to adjust parameter for using tradition control methods. this article designes cascade pidcontrol system and self - adaptability fuzzy pid three impulse control system for

    根據鍋爐控制現狀,提出了參數自整模糊控制規則,計了二輸入三輸出自適應模糊pid控制器對汽包進行控制,克服了傳統控制方式的控制效果不精確和參數難以調整等缺點。
  12. The construction goal of beijing biological project and medicine industry base : focusing on the construction of industry infrastructures and technology innovation, taking the “ four high ” - “ high starting plan and fixing position, high standard design and construction, high level plan and operation, high efficiency management and service ” as the guiding principles, we will construct this base into the internationally first - grade modern biological project and medicine industry base integrating research and development, enterprise incubation, production and manufacture

    北京生物與醫藥產業基地的建目標為:以產業配套和技術創新能力建為核心,以「高起點規劃與,高標準計與建,高平謀劃與運作,高效率管理與服務」的「四高」要求為總體原則,將園區建成為集研究開發、企業孵化、生產製造功能為一體的、國際一流的現代化生物工程與醫藥產業基地。
  13. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩性分析,計潮的分析計算,洪潮組合方案擬,工程前後對河道及流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  14. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理置和營運現狀,說明了船閘在航道建資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確其中包括東溝船閘過閘貨種和貨運量發展的預測,並確東溝船閘的計代表船型及營運組織;第三章東溝船閘改造工程計本章通過船閘改造工程主要技術參數:船閘規模、尺度、和高程等的確計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的計,並選了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝船閘改造工程二個計方案進行全面綜合比較后,確了推薦方案。
  15. At the stage of comparison of drafts, according to the fact of water resources in laiwu city, and the case of the water replenished together with used in qiaodian reservoir, it analyses that the water level heightened is necessary and feasible. it sums up an easy, rational and facile means that can be generalized in water design units at grass roots, according to choosing a best scheme by fuzzy comprehensive judgement. in the course of designing engineering, it has obtained the results such as the seepage of dam bottom, verifying the safety of dams, and the design of reinforcement, so that it ensures the safety on the engineering, and achieves the aims of prospective

    在方案論證階段,根據萊蕪市資源狀況及喬店庫來情況,分析了抬高興利的必要性和可行性,採用模糊數學綜合評判的方法,總結探討出一種簡單合理,易於操作,在基層計單具有一推廣價值的方案優選辦法;在工程計中,主要對大壩壩基滲漏,大壩安全校核及加固計進行了計算,並對大壩加固計進行模糊優選,保證了工程安全,達到了預期的目的。
  16. As a simulation workstation of marine engine - room simulator, the steam system is mainly utilized to accomplish the process simulation of marine boiler and equipments involved. the accurate models of boiler drum water system and steam pressure controlled system were established in accord with the theory of marine boiler

    論文首先根據船舶鍋爐的工作原理,通過機理建模的方法,得到鍋爐汽包和汽壓調節對象的模型,並通過一的假和簡化,得到汽包和壓力在具體擾動下的數學模型。
  17. Since 1950s, changjiang water resources commission as well as other scientific research units have carried out engineering geological reconnaissance for large - scale cross structures and the whole route, meantime, researched special subjects, such as special soils ( expansive soil, loess ), the canal section in coal mining area, regional structure stability, sandy soil liquefaction etc

    自20世紀50年代迄今,長江利委員會及其它科研計單對中線工程全線及大型交叉建築物進行了工程地質勘察,同時對特殊類土(膨脹土、黃土) 、渠線過煤礦區、區域構造穩性、砂土液化等專題進行了研究。
  18. According to the instance of the arch dam built, take the discount quotiety, the verification flood water level, the frictional quotiety and, the agglomerate force and as stochastic variable quotiety, calculate the reliability index of the abutment with the calculational programme after the average value and variable quotiety is known

    對于所取的拱壩實例,以揚壓力折減系數,校核洪,摩擦系數、 ,凝聚力、為隨機變量,在已知其均值並變異系數的前提下,利用電算程序計算其壩肩巖體的可靠指標。
  19. This paper introduces the working principles of an electronic double - water level alarm and the designing calculation of its related parameter selection

    介紹了一種電子式雙報警器的結構及工作原理,並對其有關參數的選進行了計計算。
  20. For wet - pit installations, it is recommended that the low water level elevation be specified to meet or exceed the minimum submergence to prevent vortexing

    對于濕井備安裝,建議所確的低高度應該達到或超過預防渦流的最小潛深度。
分享友人