設船閘的運河 的英文怎麼說
中文拼音 [shèchuánzhádeyùnhé]
設船閘的運河
英文
lock canal- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 船 : 名詞1. (水上的運輸工具, 船舶的通稱) boat; ship; vessels 2. (姓氏) a surname
- 閘 : anchor gate
- 的 : 4次方是 The fourth power of 2 is direction
- 運 : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 運河 : canal
-
The calculation method of lock capacity is very valuable and affords an academic base for the redaction of code of ship lock general design. the main contents and results in the thesis include the following aspects. ( 1 ) the randomicities of daily and hourly arrivals at a waterway lock have been analyzed
該方法具有很強的指導意義和推廣價值,可為蘇北運河船閘設計、管理和發展提供科學依據,同時也可為國內其它河流上的船閘設計、以及《船閘總體設計規范》的修訂提供參考。Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough
沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的水位變化而設置船閘。長期以來,由於缺乏對鹽水入侵內河河道產生影響的定量評估,在船閘運行過程中為防止高鹽度鹹水入侵內河,通常採用將內河淡水打入閘室的方式來調節通航水位,船閘的這種運行方式不盡合理。Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。On the grand canal in the north of jiangsu province, practical lock capacity of each lock is more than the designed so that delays become more and more serious. it is necessary to research the lock capacity for the layout, design and management at a waterway lock. in this thesis, the lock capacity has been systemically studied by the method of mathematical analysis based on the data from shiqiao and huaian locks
目前蘇北運河船閘均處于飽和運行狀態,船閘的實際通過能力已接近或超過原設計通過能力,船舶待閘現象也愈來愈嚴重,規范中關于通過能力的計算方法己不適應,非常有必要研究船閘通過能力計算新方法,為船閘的規劃、設計和管理等服務。When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred
在通航或者竹木流放的河流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。分享友人