設計基礎資料 的英文怎麼說

中文拼音 [shèchǔliào]
設計基礎資料 英文
basic data for design
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 名詞(墊在房屋柱子底下的石頭) plinth
  • : Ⅰ名詞1 (錢財; 費用) money; wealth; expenses 2 (資質) intelligence; endowment 3 (資格) quali...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 資料 : 1. (生產或生活的必需品) means 2. (依據的材料) data; material
  1. On the basis of having refered larg number of abroad test - well data and having investigated same local test - well, this dissertation have designed the drill and petroleum extraction tools test - well whole scheme to fit the well drill and petroleum extraction busywork characteristic and the demand of technique store for the dagang oil - field

    本文是在進行了大量的國外試驗井查閱及國內試驗井調研的上,根據大港油田鉆采作業的特點和技術儲備的要求進行了鉆采工具試驗井總體方案的
  2. The following are such theories and methods as nonlinear theory considering interaction between support and rock mass, which, based on quantity analysis technology and actual data of initial crust stress, can simulate complex geological condition, carven shape and supporting so that provide important reference for analysis of stability of rock mass around underground carven and design of supporting

    隨之而來的是考慮支護與圍巖共同作用的非線性理論和方法。這些理論和方法一般都以數值分析為手段,以實測地應力,能模擬復雜的地質條件、洞室形狀及支護措施,從而為地下洞室圍巖穩定性評價和支護提供重要的參考依據。
  3. The length of railways in operation is an important indicator to show the development of the intra ? structure for the railway transport, and also the essential data to calculate volume of passenger freight transport, traffic density and utilization efficiency of the locomotives and carriages

    鐵路營業里程是反映鐵路運輸業施發展水平的重要指標,也是算客貨周轉量、運輸密度和機車車輛運用效率等指標的
  4. Software for material management information subsystem is developed. the cims can also be divided into nine submodules such as system set, database management, planned management, stock ( contract ) management, storage management, capital management, document management, system maintenance and help

    對其中物管理信息子系統進行了軟體開發,共分系統置、數據管理、劃管理、采購(合同)管理、庫存管理、金管理、管理、系統維護和幫助九個子模塊。
  5. The length of highways is an important indicator to show the development of the highway construction and to provide essential information to calculate the transport network density

    公路里程是反映公路建發展規模的重要指標,也是算運輸網密度等指標的
  6. By the comparison of calculation result with the tests result, it was concluded that the method to calculate the year temperature difference and day temperature difference from weather data was feasible. by this method, it was got that the statistic parameters of combined temperature difference in base period and the reliability to different anti - crack index was calculated the combination of thermal effects and load effects was considering in this paper

    對多年氣象進行了統摘要浙江大學博士學位論文2003分析,將其轉化為結構的年溫差和日溫差,並與實測值進行了比較;在此上得到了準期內的結構組合溫差統參數以及不同抗裂指標所對應的可靠度。
  7. And that, the variable regulations of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized for the right and the left bank of underground chambers

    全面總結了溪洛渡水電站左、右岸地下廠房洞室群圍巖應力,變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工提供了和理論依據。
  8. And the variation characteristics of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized, which provides basic information and reference for the evaluation of underground cavities stability and project construction

    總結了地下洞室群圍巖應力、變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工提供了和參考依據。
  9. A contract for a major state construction project shall be concluded in accordance with the procedure prescribed by the state and in compliance with the state - approved documents such as the investment plan and feasibility studies report, etc

    第二百七十四條勘察、合同的內容包括提交有關和文件(包括概預算)的期限、質量要求、費用以及其他協作條件等條款。
  10. Survey and design contracts shall provide the time for delivery of the basic survey or design data and design documents ( including an estimated budget ) by both parties, the quality requirements of the design, other conditions for coordination and other similar provisions

    勘察、合同中,應規定雙方提交勘察、設計基礎資料文件(包括概預算)的時間,的質量要求以及其他協作條件等條款。
  11. In this article, computer simulation of mechanical performance of typical asphalt pavement structure under heavy axle load has been analyzed by means of finite element program abaqus, in order to supply some fundamental information for the asphalt pavement structure with higher bearing capacity designing under the heavy axle load

    文章利用大型有限元程序abaqus ,對承受重軸載車輛荷載作用的典型路面結構力學性能進行算機模擬分析,為特重車輛作用下承載能力較強的瀝青路面提供
  12. With a purpose to provide basic data or figures for the feasible research of a project construction and its planning, taking the practical project of preselecting a factory location for an instance, using the principle and method of shallow seismic reflection, based on the area conditions, differences in physical features and disturbance, with experiments on typical sections of the construction area, one can draw reasonable measuring lines, choose right modes of producing and receiving waves, conduct primary and precise computer data processing, acquire a distinct reflected wave section from a shallow depth and explore the stratum structure in the preselected location and the distribution of longitudinal waves

    摘要結合某重大工程預選廠址項目的工程實例,利用淺層地震反射波法的原理和方法,根據現場的場地條件、物性差異和干擾情況等,結合典型地段的試驗,合理布置測線,選擇恰當的激發和接收方式,進行初步和精細的算機處理,可以得到清晰的淺層反射剖面,準確地查明了預選廠址的地層結構和縱波速度分佈,為工程建的可行性研究和規劃提供了
  13. Second, on the basis of supplementing basic data and investigating the historic tidal level, the design tidal level has been analyzed and calculated. as the result of the comparison between p - iii type frequency curve and gumbel curve, the p - iii curve is recommended

    其次,在插補延長、歷史潮位考證的上,進行了潮位的分析算,並分別就採用p -型曲線及gumbel曲線兩種線型適線進行比較探討,推薦採用p -型曲線適線成果。
  14. Aiming at this current condition, on the basis of comprehensive technical literature for soft base treatment at home and abroad, and in combination with construction of nei - kun railway and zhu - liu railway, the overall introduction has been made of engineering characteristics and treatment measures of soft soil on the slope. concrete study includes : 1

    針對這一現狀,本文在廣泛查閱國內外有關軟處理技術文獻的上,結合株州至六盤水鐵路與內江至昆明鐵路建中的勘探、、施工,對「斜坡軟土」的工程特性與整治措施進行了較為全面的研究,取得了如下成果: 1
  15. The specialized research on the function that infrastructure investment drives economic growth is seldom seen. the thesis aims at doing qualitative and quantitative analysis on function that infrastructure investment promotes economic growth, offering actuality of investment decision to government and investors

    本文針對施投的作用問題,在充分利用宏觀經濟統數據的前提下,經過定性和定量分析,系統研究施投對經濟增長的作用,為政府部門及投者提供現實的投決策參考依據。
  16. And that, the variable regulations of stress filed, deformation field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized. based on the analysis of the effects of rock mass qualities on surrounding rock mass stability, the control effect of rock mass qualities about stability of surrounding rock mass was studied

    總結了地下洞室群圍巖應力、變形和破壞區的分佈特徵和變化規律,並通過對比分析圍巖質量對其穩定性的影響,闡明了巖體質量對圍巖穩定性的控製作用,為洞室群穩定性評價和工程施工提供了和理論依據。
  17. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    圖紙、備安裝修改通知單和監理通知單為依據,按規程規范的要求,以不影響工程進度為原則,由主管工程師對施工班組進行技術交底,利用經緯儀、水準儀和捲尺等測量工具放點定位進行及預埋件預埋並做好預埋記錄。
  18. It studied the engineering geology condition of the heigou mine - field of jisco. by the abundance of basic data with investigates and lab experiments, it estimated and analyzed the stability of the side slope of the heigou mine - field with many research methods that included " the ultimate balance ", " the discrete cell " and " the fea ". besides these, it gave same advice about analogous engineering in order to offer certain evidence for the later management of heigou mine - field and for the engineering blasting design

    本文以工程地質學、巖石力學理論為,針對黑溝礦區工業場地邊坡特殊的工程地質條件進行研究,在通過現場調查、實驗室試驗等手段獲得大量的前提下,對黑溝礦區工業場地的邊坡,採用極限平衡法、離散單元法、三維彈性有限元法等多種方法進行了穩定性評價及分析,並提出了相應的工程措施建議,為今後黑溝礦區工業場地邊坡管理及大爆破等提供了一定的依據。
  19. Several suggestions were given on the design and application of ground source heat pump air - conditioning system. discussion was on the basic data research, the system choice, and the well design. a feasible design proposal was mentioned

    對地源熱泵空調系統的應用提出了幾點建議,對調查、系統選擇、水井等方面進行分析,並針對承德市的特點提出了可行性方案。
  20. First, the thesis designs a whole geo - spatial data bank. generally, it involves in fundamental information preparation, writing standards, graph layer division, graph digitizing, collection of attribute data, edition, topological treatment, pretreatment, graph splicing, incorporation of attribute data and the final establishment

    論文首先對研究區地學空間數據庫進行了整體,大體經過準備、制定數字化圖層及屬性文件格式標準、劃分圖層、數字化圖形與採集屬性數據、編輯修改與拓撲處理、進行預處理、圖幅拼接與屬性數據合併,到地學空間數據庫建立。
分享友人