設計排水量 的英文怎麼說

中文拼音 [shèbèishuǐliáng]
設計排水量 英文
design displacement
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 排水量 : displacement; withdrawal; tonnage; water discharge; water displacement
  • 排水 : drain off water; drain away water; dewatering
  1. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建,分析了地下泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻基床的方法;運用質守恆定律和地下滲流原理,建立了港口碼頭算數學模型和過程算公式,並用在了碼頭的穩定算中。
  2. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    部《房屋建築工程質保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給管道、備安裝為2年; 5 、裝修工程為2年。
  3. In the third, this paper makes a survey on components of the exhausted flue gas and waste heat resource, and discusses the possibility and methods of steam generation and air preheating with the waste heat. and then, the analysis on the advantages and disadvantages of heat recovery plants with conventional steel - water heat pipes and inorganic heat - transfer heat pipes is carried out. the paper also gives a valuation about the plan and features of the design of heat recovery

    對余熱源煙的成分和余熱資源進行標定,討論余熱回收產生蒸汽或加熱燃燒用空氣的可行性和方法,分析常規余熱回收技術、採用普通鋼-熱管和無機傳熱熱管等傳熱元件的余熱回收裝置的優缺點,並對余熱回收方案及其特點進行總體評價。
  4. But now it ' s urgent to adopt new methods for calculating the head loss of regional drainage due to some factors such as long length, large flow quantity and probable strong topographic change

    由於存在管線長、流大以及區域地形變化幅度可能較大等因素,建區域系統需要採用新的方法較為準確地頭損失。
  5. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高頭、大泄流情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋算方法,其算結果與實測值吻合良好;三、利用試驗與算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣估算方法,為導流洞氣方案的提供了參考依據;六、在高頭、大流條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  6. The litter - resistance slowly closing butterfly check valve is developed a newest product based on our butterfly check valve, hydra - matic transmission to be add in the valve with unique design, new stuction and optimum performance, can be used pipeline of water supply and dring with such media : fresh water, sea water, sewage, raw water, ect. the valve should be installed at outlet of the water pump, in stapping the pump, the process of slowly closing after valve plate shuts rapidly. can be guard effectively against the destruction water hummer, so to ensure the safe operation of the pipline

    微阻緩閉蝶式止回閥是在我廠生產的蝶式雙瓣止回閥的基礎上利用能轉換原理增油壓緩閉裝置的新型模式止回閥,獨特,結構新穎,性能優宜,適用於凈,源,污,海等介質的供、管路中,安裝於泵出口端,停泵時由於油壓阻尼作用法盤先速閉后緩閉,以消除破壞性錘,保證灌路安全運行。
  7. Takes several energy saving measures for air conditioning system, nick a large capacity centrifugal chillers working with variable frequency nil capacity chillers, variable frequency and variable flow control on secondary pump water systems, cooling tower for four - pipe water system in winter, fan - coil unit for commercial peripheral zones aid all - air systems for interior zones, variable frequency control on supply and exhaust air fain, enthalpy control on fresh air cooling in winter and intermediate season

    採用了多項空調節能措施:大冷離心冷機組搭配變頻小冷機組,二次泵變頻變流空調系統,四管制風機盤管冬季用冷卻塔換冷供冷,商業外區風機盤管、內區全空氣空調系統,送風機、風機變頻控制,過渡季、冬季利用室外新風通風降溫的焓值控制
  8. Measurements of rainfall and water loss as a result of evaporation are essential for various applications in connection with water resources planning, drainage design, water quality control, reservoir design and operation, irrigation as well as hydrological forecasting and flood control

    度雨及因蒸發作用而引致的損耗非常重要,所得結果可以應用於利資源策劃系統質控制和管理灌溉文預報及防洪等。
  9. Hydrometeorology is concerned with the study of these atmospheric processes which affect the water resources of the earth and which are of interest to the meteorologist and the hydrological engineer. measurements of rainfall and water loss as a result of evaporation are essential for various applications in connection with water resources planning, drainage design, water quality control, reservoir design and operation, irrigation as well as hydrological forecasting and flood control

    文氣象的研究范圍包括所有影響地球利資源而氣象學家和文工程師又有共同興趣的大氣過程。度雨及因蒸發作用而引致的損耗非常重要,所得結果可以應用於利資源策劃、系統質控制、和管理、灌溉、文預報及防洪等。
  10. Risui s active restoration reduction water production device, which was developed on a sound scientific basis by discarding incorrect theories concerning activation, is available in the form of individually designed products that meet specific customer needs with respect to using purpose and treated water volume, in addition as ready - made standard products

    的還原石才是個奇跡球除活性化的錯誤理論,根據科學依據理論開發的活性還原製造裝置除了現有的規格產品外,還能根據不同的使用目的和處理產品。
  11. Automatic control of jigs discharging, coal and water inputting have been realized with industrial computer. the design of the systems hardware and software are described in details

    應用工業控制算機實現了對跳汰機料、給煤、給的自動控制,介紹了系統的軟、硬體
  12. To explore why the ratio of collectable wort extract is higher than that of non - extruded, the influences of all parameters of rice extrusion system ( barrel temperature, material moisture, screw speed ) on resistant starch content of extuded rice were studied by using second - order quadratic orthogonal rotating combination design method

    摘要為探索擠壓蒸煮大米啤酒輔料麥汁浸出物收得率高於傳統不擠壓蒸煮啤酒輔料收得率的原因,用二次正交旋轉組合試驗法試驗,研究了大米擠壓蒸煮系統諸參數(套筒溫度、物料含、螺桿轉速)對大米抗性澱粉含的影響規律。
  13. By structural analysis and calculation for original highway structure without permeable layer, the critical modulus of base have been obtained which makes asphalt pavement fill different allowable stress criterion. by structural analysis and calculation for different highway structure with permeable layer, critical modulus of permeable base course are obtained to make asphalt pavement fill different allowable stress criterion. the paper also presents the tendency of structure response of different highway structure with drainable layers mainly depends on the thickness of asphalt pavement, the thickness and the critical modulus of permeable base

    對于不層的原路面結構,通過結構算得出對應于不同的瀝青面層容許應力值時所需的基層臨界模值;對于加層的路面結構,通過結構算得出對應于不同的瀝青面層容許應力值時所需的基層臨界模值;加層的路面結構的結構反應的變化趨勢主要取決于瀝青面層厚度、基層厚度和基層臨界模值。
  14. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過高位富區時,不用襯砌直接承受較高的外壓力,要實現這個目標必須做好襯背的工作,使通過加固圈滲透過來的及時走,及時削減累積的
  15. The design capacity of the communal drainage system is intended for handling the surface runoff arising from rainstorms, the volume of which is much higher than the volume of wastewater being inappropriately discharged into the drainage system. even though some wastewater may find its way into the communal drains, the drainage system which is serving a large catchment area should be able to handle it without increasing the risk of flooding

    公用系統的流,是要把大雨所引致的地面徑流收集並走,其容遠遠超過錯誤入的污,加上集區的面積廣闊,就算有污錯誤入,公用系統都足以應付,不會增加浸的風險。
  16. Design of small - discharge low - specific - speed submersible sewage pump

    小流低比轉速潛污泵的
  17. The key parameters are related to the hydrodynamic parameters and its weight

    污泵耦合裝置關鍵參數的確定主要與泵本身參數以及有關。
  18. Xh rubber slowly - closing cut - off vavle is a new water supply and drainage vavle with full rubber structure, duck - mouthed appearance and functions or positive flow - in and reserve cut - off. according to thrust analysis and calculation as well as different operation mechanism and different rubber products by special processing. all will be open at weak hydraulic pressure is higher, the vavle gate will open more greatly and the water flow is greater. at reserve operation, the vavle gate closes naturally and seals tightly cut - off vavle ; the back pressure is higher, the vavle gate closes more tightly and the seal effect is better. it is used widely in various drainage exit to prevent from pouring backwards and flowing backwards in city planning, water conservancy and sewage disposal etc. it is the ideal productto replace flap vavle

    Xf型橡膠緩閉逆止閥是一種全橡膠結構外形呈「鴨嘴狀」 ,具有「正向流入反向逆止」功能的新型給閥門產品。它根據受力分析和受力算,針對不同的工況,採用不同的機理,選用不同的橡膠配方,並按特殊工藝製作而成。正向工作時,由進口流入,微小的壓,便能打開閥門,壓越大,閥門開啟越大,越大。
  19. Main contents for studying of the paper is : ( 1 ) analysing the outcome, characteristic and the problem of the hot water supplydesign second flow method in the europe and the usa. ( 2 ) it is determined that value frequenly of different fixture use in the period of using water high peak. ( 3 ) the relation between the n and the hot watersupply design second flow is got by applying program to computer under the different probablity

    本課題研究的主要內容為: ( 1 )分析對比歐美主要國家熱秒流算方法的結果、特點及存在的問題; ( 2 )根據我國居民生活用熱特點,由用標準推算出各類型用戶用高峰期的衛生器具使用概率; ( 3 )編制算機程序,算不同使用概率情況下,給與熱秒流的關系表; ( 4 )建立熱秒流q _ g和給n與使用概率p之間的相關關系; ( 5 )繪制《建築給規范》中有關熱秒流算方法的算用圖表。
  20. The determination of water supply design second flow is one of the most important subject in building water supply and drainage and is the moist frequent question in designing

    秒流算是建築給中最重要的課題之一,是中使用最頻繁的工作,如何將秒流算更符合實際情況是一個值得探討的問題。
分享友人