試驗研究設施 的英文怎麼說

中文拼音 [shìyànyánjiūshèshī]
試驗研究設施 英文
laboratory design and engineering
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 研同 「硯」
  • : Ⅰ動詞(仔細推求; 追查) study carefully; go into; investigate Ⅱ副詞[書面語] (到底; 究竟) actually; really; after all
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 試驗 : trial; experiment; test
  • 研究 : 1. (探求) study; research 2. (考慮或商討) consider; discuss; deliberate
  • 設施 : installation; facilities
  1. And. the test research on the restrained beams strengthened by epoxy - glued cfrp which is glued in term of different angle is presented. based on the test of shear strengthening by cfrp - bonded, qt. ality control standards of the design and construction is established

    作者對cfrp加固用材料性能、結構受力特徵進行了系統的論述,對按不同角度粘貼cfrp加固的約束梁進行了,得到大量數據,並在的基礎上,得出了有關的構造要求、錨固要求等工質量控制條件。
  2. In the former, two computing modes of fem are built, aimed at the coupling of variable - profile pylon, curved - axis arch and flexible cable. the software algor feas is used to get the results of dynamic numerical analysis, such as natural vibration frequency, vibration mode, dynamic displacement, dynamic stress, which are compared with the results of shaking table test research to draw to important conclusions. these conclusions provide not only potent basis for the design and construction of nanjing century tower, but also reference for other pylon - cable - arch structures similar to the project

    在動態數值分析中,針對世紀塔變截面的塔身,曲線軸線的拱以及柔性拉索相互耦合時清況,建立兩種有限元計算模式,利用有限元軟體algorfeas得到動力數值分析的結果,如:自振頻率、振型、動位移、動應力等等,再和振動臺成果作比較,得到一些重要的結論,從而為南京世紀塔工程的計和工提供強有力的依據,而且為類以於世紀塔工程的其它塔-索-拱結構的計也提供一定的參考。
  3. At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test

    目前,國內外對瀝青混凝土心墻的材料和結構性能已進行了一些,其計方法、工工藝和備較為成熟,但其基本性能方面顯得較為薄弱,本文結合實際工程對瀝青混凝土心墻的芯樣和室成型的件進行了,主要包括靜三軸、圍壓穩定以及應力鬆弛,得到以下基本結論: 1
  4. By means of laboratory and field experimentation of typical semi - rigid base materials, the relationships among laboratory experimental values, field maintain values, field core values and construction criteria are put forward. and the relationships between different test methods are established. using time - temperature conversion principle, it processes the intensity assessment of field cores, then offers the method of determining the test deflection of pavement surface

    通過典型半剛性基層材料的室內外主要計參數的室內值、野外養生值、現場取芯值及工指標間的關系,建立了不同方法間的相關關系,運用時溫換演算法則,對現場芯樣進行強度評定,並提出了路表彎沉檢測標準的確定方法。
  5. To release the burden of labor intensive and low efficiency manual wheat and maize interplanting, a maize interplanting - fertilizing implement was developed. to match the implement, the tread and ground clearance of small - four - wheel tractor are increased. when sowing wheat, the interplanting line for maize is reserved to mechanize the work for the next crop

    借鑒保護性耕作在廣大旱農地區已取得的成功經,結合山東省的生產實際和種植模式,進行保護性耕作的;針對人工套播玉米生產效率低、播種質量差的情況,利用計的玉米肥套播機和改裝的小四輪拖拉機進行機械化套播玉米
  6. This research was also supposed to provide a valuable reference for the construction of 500kv eastern hangzhou transformer substation project. to guarantee the rationality of the torsion and bending load application, a set of experimental equipments was transformed from a traditional one by exerting tangential force on the brim of the fan board and conducting broad - billed roller application. in the actually fulfilled experiments on the capabilities of the members under different ratios of torsion and bending, the equipments proved to be well qualified in load applying to large - tonnage members

    中,為保證扭轉及彎矩荷載加的合理性,在浙江大學工程結構室原有的加載備的基礎上,分別採用在扇形板邊緣加切向力和寬軸承滾軸加載的方法,改造並調出一套可專門用於大噸位構件加扭轉荷載及組合作用的備,並利用這套備進行了離心鋼管混凝土構件在不同彎扭比的組合作用下的
  7. According to some model test results of fishing vessels in the developed fishery countries, through analyzing the capsizing mechanism of fishing vessels, author gives some measurs for improving the stability of fishing vessel in rough sea, which include how to design and arrange the bulkwark port and ensure the reliability of water - tight facilities and use catamaran

    為此,作者根據海洋漁業發達國家進行的一些漁船穩性的船模結果,經過對漁船傾覆機理的分析,提出改善漁船風浪中穩性的一些措,包括如何合理計與布置舷墻排水口,確保船體開口水密的可靠性以及採用雙體漁船等。
  8. The results reveal that the force in the members and the displacement are small when two structures are under seismic load. that the ideas of designing cable dome change from " continuous tension, discontinuous compression " to " discontinuous tension, discontinuous compression " and that the ideas of construction technique change from " moving diagonal cable " to " moving outer diagonal cable or ridge cable " is proposed

    提出索穹頂結構的計思想已經從最初的「連續拉,間斷壓」 ,發展為「間斷拉,間斷壓」 ;工成形技術也從原來的張拉斜索,演變為張拉最外圈的脊索浙江大學申請博士學位論文葵花型索育頂結構的理論分析和或者最外圈的斜索。
  9. To investigate the practical stability performance of this bridge, a model test is carried out. the test model actually simulates nan pu bridge based on similarity criterion. the model test reveals that the stability factors is more than 2. 0, so the stability and strength of this bridge have been verified to be met with

    該模型首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋的模型計和製作中,其成果對南浦大橋實橋的工以及竣工后的運行有重要的應用價值,並對今後鋼管混凝土桁式拱橋的計、工具有重要的指導意義。
  10. In order to study the practical stability performance of chunan nanpu bridge, a total bridge model test was carried through. the design method of " spar to spar " modeling method was firstly introduced in this test. the test results are significant for construction and management of chunan nanpu bridge ; excessively, the test results are significant for design and construction of large span cfst arch bridge also

    該模型首創了「桿對桿」剛度等效法,應用於鋼管混凝土桁架拱橋的模型計和製作中,其成果對南浦大橋實橋的工以及竣工后的運行有重要的應用價值,並對今後鋼管混凝土桁式拱橋的(特別是模型製作) 、計、工具有重要的指導意義。
  11. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的」 ,所做的工作主要在以下三個方面:一是根據8根樁身內埋量測元件樁的單樁豎向靜載荷資料,分析了各樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術成果的基礎上,結合現場結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步提供經,並為今後在該地層中合理選用樁型以及指導工提供了依據。
  12. The paper on the basis of the study on the control of the changing slope curve paving in theory, through the study on the responses of the screed to different input signal in condition of the erected string, the controller of the transverse gradient and the floating beam on the spot experimentations, and through the analyzes the three paving design method in theory and the experimentation, on through the analyzes the three paying design method in theory and the experimentation data, provides some material solving measures to solve the changing slope curve paving

    摘要根據彎道變坡攤鋪控制特性的理論,在工程實際中採用掛線法、橫坡控制器和浮動均衡梁進行了不同輸入激勵函數下熨平板響應的,並通過對這3種攤鋪計方法的理論和數據的分析,提出了解決彎道變坡攤鋪的具體措
  13. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐計與工作者借鑒與參考
  14. Firstly, the master zhang binbin ' s tests further verified that the design methods brought forward by the code for design of reinforced concrete high - rise structure ( jgj3 - 2002 ) can not satisfy basic seismic requirement. at the same time, our research group find that some acceptable improved reinforcement arrangement scheme in domestic and foreign researches can not attain satisfying ductility performance

    其中首先通過碩士生張彬彬的工作,進一步證實《高層建築混凝土結構技術規程》 ( jgj3 - 2002 )提出的計方法不能滿足抗震基本要求;同時查明,國內外已提出的某些工可以接受的改進配筋方案仍未達到較滿意的延性性能。
  15. Based on the study idea of the former pile else, this paper has conducted and discussed the mechanism of consolidation, settlement calculation and optimization design of the pcc pile according to the test in situ results and reasoning. it includes the followings in detail : ( 1 ) compared with the precast tube concrete pile and tube sinking concrete pile, the merits and shortages, construction machine, construction technology of the pcc pile and pcc pile composite foundation are introduced in detail to make the pcc pile be known completely by engineers

    本文在借鑒其他樁型的的基礎上,通過現場和理論推導,對pcc樁處理軟基加固機理、沉降計算和優化計等進行了較為深入的和探討,具體包含以下幾方面的內容: ( 1 )在與預制管樁和沉管灌注樁等樁型比較的基礎上,對pcc樁的優缺點、工機具備、工工藝、技術作用機理以及pcc樁復合地基技術特點等進行了述評。
  16. Due to irrational land utilization, absurd assarting and herding, a series of environmental problems, such as sandy soil, grassland degeneration, soil and water loss, appeared, which severely threatened to survival and development of human being. it was proved that biomic - measure was the radical measure of ecology environment construction and harnessing. thus, a research on choosing a kind of grass, which was good, stronger stress resistance and faster growth velocity, was carried out

    黃土高原半乾旱區多年來由於不合理的土地利用和濫墾濫牧等現象,致使土壤沙化,草地退化,水土流失等一系列生態環境問題嚴重威脅著人類的生存與發展,多年的已證明,生物措是生態環境建與治理的根本性措,因此,針對目前的自然現狀,選擇抗逆性強、生長快、生產中急需的優良牧草進行了定位
  17. However, the geologic structure of the carstic formation is complicated and the design, construction, quality testing method of the high - pressure grouting is developing rapidly. we have engaged lots of experiments and studies in xiangshuiriver reservoir on this subject. one of the purposes subject is to guide the design, construction of the curtain grouting in the xiangshuiriver reservoir and optimize the grouting design, the other is to be a reference example for other similar engineering

    但由於巖溶地質條件的復雜性,且高壓灌漿作為一項技術和工藝,在計、工、質量檢及效果評價等方面,仍然處在不斷發展的過程中,正是基於以上兩個方面的考慮,本課題結合響水河水庫高壓帷幕灌漿工程進行了大規模的,一方面指導帷幕灌漿的計與工,達到優化計方案的目的;另一方面對資料進行分析,以期對同類工程有所助益。
  18. The test study of this method was carried out on the yichang freeway in hunan province, and results show this method can solve the vehicle bumping problem on freeway well with the advantages of low - cost and convenient implements

    本文提出的半剛性擠密樁處理橋頭跳車的計方法在長常高速公路益常段進行了,結果表明對臺背回填和地基進行綜合處理不僅解決了橋頭跳車問題,而且經濟實用、工方便。
  19. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科項目,在非典期間,現場長達5個月的工作,完成了從、現場工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的。主要的內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建、安全運行和沿線構築物計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了:包括天然密度、含水量、塑液限、顆粒級配等指標的成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  20. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨水管道中遇到的技術難題,進行手掘式工具管砂土層頂管法工技術,在中考慮砂土層存在的后靠土體移位、變形,工具管難以進入出洞土體,挖掘面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體換填加固,出洞土體換填加固,以及在工具管頭部置管帽、格柵、糾偏系統等技術措
分享友人