試驗路 的英文怎麼說

中文拼音 [shìyàn]
試驗路 英文
test road
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 試驗 : trial; experiment; test
  1. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道資料為主,從實際出發,結合理論計算,對重載標準進行了詳細的討論,分別給出了水泥混凝土面與瀝青混凝土面的重載標準了;同時,通過大量的水泥混凝土板底應力計算,推導出了混凝土面板荷載與板底應力水平的關系式;給出了水泥混凝土面與瀝青混凝土面的交通分級;通過對試驗路各結構層進行承載板測,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有水泥面設計中的諾謨圖不能完全符合現有道材料,從而提出了對理論模量的修正公式。
  2. Through field test and observation, we have achieved the desired results and proved that the using of aeolian sand as paving material is feasible further

    同時,本課題鋪築了1公里長的試驗路,通過現場檢測和觀察,進一步證了風積沙用作沙漠公面材料的可靠性。
  3. Abstract : based on the indoor test results of the base bedding course materials for cement concrete pavement and prevalent actural calculation approach of the prevalent norms, and according to the different compositions in changtan expressway and in consideration of the experiences gained in the central and southern region, a typical structure legend for cement concrete pavement which is suitable for areas damp and with plenty of rainfall the typical structure and guideline for the use of the typical structure legend are presented in this paper

    文摘:通過對南方多雨地區目前常用的水泥混凝土面基墊層材料的室內,依據現行規范的結構計算方法,進行不同結構組合算與長潭高速公試驗路段現場檢測,並參考中南地區使用經,提出了適應多雨潮濕地區水泥混凝土面典型結構圖例,論述了運用典型結構圖例的原則及指南。
  4. Based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    基於某試驗路段軟基處理前後靜力觸探、十字板的對比測和對兩根單樁、兩處單樁復合地基進行的4次靜載,研究了樁間土性狀在施工水泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據靜載確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  5. Abstract : based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    文摘:基於某試驗路段軟基處理前後靜力觸探、十字板的對比測和對兩根單樁、兩處單樁復合地基進行的4次靜載,研究了樁間土性狀在施工水泥粉噴樁前後的變化和樁土應力比的變化規律,提出了根據靜載確定粉噴樁及其復合地基承載力新的取值方法,並修正了復合地基承載力的計算公式。
  6. Through the construction and survey of the experiment sections, the functional and anti - ice - snow performance of granulated crumb rubber asphalt pavement is proved well, and its relevant technical manual is compiled, deserving extensive use

    通過試驗路的觀測,證明了其良好的使用性能和抑製冰雪的能力,並提出了相應的施工技術指南,實體工程應用結果表明其具有良好的推廣應用價值,該研究成果達到國際先進水平。
  7. The paper discusses mechanism performance, durability and resistance to de - icing salt concrete, this kind of concrete is made with air - entraining agent or silica fume and used in the trial section construction of benxi - dandong freeway ' s charge square which is located in dandong

    本文通過在混凝土中摻入引氣劑或硅粉,來配製抗除冰鹽混凝土,並對其進行力學性能和耐久性測,重點其抵抗鹽凍能力,並用於本丹高速公丹東段的收費廣場試驗路施工。
  8. The technology route adopted is trial route based data from factual survey

    採取的技術線是依據實測數據進行研究的試驗路線。
  9. This paper conbined with the indoor test and the scene test road, through the synthetical analysis of the factors of influencing densification effect for the densification thickness of filling stone roadbed. the maximum grain size of fill material, densification machinery and densification frequency et al. advanced a control norm of the maximum grain size and piy of compression, established ration evaluating the control standard of densification quality of filling stone roadbed under overload. comparing with result of indoor test and the scene test road, studied on theory of densification in different kinds of stone material and perfected the control system of the densification of filling stone roadbed under overload

    結合室內和現場試驗路的實測數據,通過對填石基的壓實厚度,填料最大粒徑,壓實機械及壓實遍數等影響壓實效果的因素的綜合分析,提出填石基的最大粒徑和攤鋪厚度的控制指標,建立定量評定超重載交通下填石基壓實質量的控制標準,並對照室內和現場結果,研究不同石料條件下的壓實理論,補充完善了填石基壓實控制指標體系。
  10. Tests relating to pavements. deformations in pavement layers. part 1 : ovalisation test

    .面層變形.第1部分:橢圓
  11. By a great number of tests indoors, the theoretic analysis of microstructure and fracture mechanics, tests on the test - road, after the analysis of road - related performances of cement - bound crushed stones base and the study for improvement, the conclusion is put forward, that applying the cement fa - bound crushed stones base can obviously minish the maximal stress of asphalt pavement, lighten and stay cracks in the asphalt pavement effectively and economically so as to improve long - term performances of the structure of pavement

    通過大量室內、微觀結構和斷裂力學理論分析,鋪築試驗路段現場檢測,分析水泥穩定級配碎石基層的用結構性能,並研究其用性能的改善措施,得出水泥粉煤灰穩定級配碎石基層可明顯減小瀝青面層的最大應力,經濟有效的減輕和延緩瀝青面開裂,改善面結構長期使用性能。
  12. By means of inquisition, the paper analyzes the causes of cement concrete pavement damage in earlier period, divides its damage into stages and analyzes the damage mechanism in theory, then puts forward relevant countermeasure for all stages. on base of these, by studying large quantity of experiments indoors combined testing road, the technique of pressing mortar under cement concrete plank and changing pavement plank, the material used to quickly repair pavement and system for draining off water are analyzed and researched in detail from principle to craft. at same tune, all kinds of repairing material and technique adaptable to cement concrete pavement are put forward

    本文通過對水泥混凝土面破損的調查,分析了造成水泥混凝土面早期破損的原因;劃分了水泥混凝土破壞階段,對不同階段的破壞機理進行了理論分析,並相應的提出了各階段的維修養護對策;在此基礎上,通過大量的室內並結合試驗路的研究,重點對水泥混凝土板底壓漿技術、水泥混凝土面的換板技術、水泥混凝土面的快速修補材料以及對水泥混凝土面的排水系統從技術、原理到材料工藝進行了詳細研究和理論分析,提出了適應各種水泥混凝土面破壞的修補材料和修補技術;最後本文還對修築水泥混凝土面提出了具有指導性的建議。
  13. Finally, this paper brings forward the mix integrated design method of asphalt treated permeable material incorporating the results of structure analyses and tests. and the rational proposal and requirement for pavement subsurface drainage system of test road is suggested

    結合結構分析與室內分析的結果,提出了瀝青穩定碎石排水層混合料的綜合設計方法,並實際運用於試驗路的結構設計和排水系統設計。
  14. We built a test road and after one year, we used surface wave exploration to test. the result is that the repaired layer felt old road well and have no empty spot. we used the pendulum friction tested and the results are the wear - resisting property is better than cement concrete pavement and pendulum friction is higher than cement concrete pavement

    此種材料同原有水泥混凝土面的粘結性能強,強度上升快,韌性大,抗凍性好,防水抗滲;通過試驗路運營一年多的檢測結果表明:通過面波儀測定修補層與原面粘結良好,沒有脫空點;利用擺式摩擦儀測定其耐摩耗性能優于原水泥混凝土面。
  15. Third, mensurated the front axle ' s load - time history when truck was running on general tar - paved roads, mountainous roads and the proving ground enhancement roads, second sampled and pretreated to the load - time history with rpc software of mts corporation, acquired the relationship of the frequence of the mean and amplitude load, obtained the zero mean equivalent loads using goodman experiential fatigue equation, acquired the weibull distributing functions of equivalent loads of respective roads

    第三,測定了汽車前橋在一般瀝青公、山區公場強化試驗路面的載荷時間歷程。對載荷時間歷程進行了二次采樣和數據預處理。採用雨流計數法得到了各面的載荷均、幅值的頻次關系,並根據goodman經疲勞公式,得到了零均值的等效載荷及相應的頻次。
  16. The sensitivity analysis of design parameter of subgrade and pavement are used to confirmed the degree of impact on working state with change of the design parameter, it is the rational and economy that the range of design parameter are proposed. structure combination design is used to proposed basic structure of qinhuangdao ' s asphalt pavement in view of local natural environment, build material, traffic classification and soil grades. this paper puts forwards suiting 39 kinds of typical structure of qinhuangdao ' s asphalt pavement according to the actual structure, experimental section long - term observation, extensive surveys, structure theory ' s analysis and calculation

    在公等級、交通量等級、土基等級及面材料參數研究的基礎上進行面設計參數敏感性分析,用以確定設計參數的變化對面工作狀態的影響程度,並據此給出了經濟合理的面設計參數范圍;結合本地自然環境、築材料、交通狀況及土質情況進行面結構組合設計,提出了適宜於秦皇島地區公瀝青面的基本結構;最後根據實際面結構、試驗路的長期觀測、大量調查與面結構理論分析計算相結合,提出並推薦適合秦皇島地區的39種瀝青面典型結構,這是本課題的主要宗旨,其研究成果將直接指導設計人員的工作,並避免隨意性和盲目性,對加快秦皇島地區公交通事業的發展將具有十分重要的意義,對其他地區也有一定的指導意義。
  17. To the northwest area climate, to use the glasgrid which has the next characters : the high tensile strength, the low elongation, the high modulus of elasticity and so on, to absorb the crack of asphalt pavement on a semi - rigid type

    計算、實及最終的現場表明,對試驗路? ?寧夏古王高速公而言,採取加鋪玻璃纖維格柵來降低溫縮型反射裂縫的措施是非常有效的,其鋪設位置宜在基層頂。
  18. This study focused on construction technology of geogrid reinforced clayey soil embankment on common earth foundation. it is conducted according to a test road located in tongchuan, north - west china ' s shaanxi province. long term strain of geogrid in the embankment was researched

    本文以陜西省省道305線土工格柵加筋堤為實體工程,通過試驗路修築,對土工格柵加筋堤的施工技術進行了研究,分析了碾壓中的格柵損傷問題,對堤中土工格柵的應變進行了測與分析,並對土工格柵加筋堤邊坡坡面防護技術進行了研究。
  19. Construction technology of geogrid reinforced embankment and long term strain of geogrid in the embankment were also researched. the interpretation of fem analysis and the experimental results provided insight into the performance of reinforced embankment

    通過試驗路修築對土工格柵加筋堤的施工技術進行了研究,對堤中土工格柵的應變進行了長期觀測與分析。
  20. In addition, influence to density and strength of cement - stabilized soil because of molding delay and reasonable curing period from completion of subbase to the compaction of road - base are also researched. finally, experiment section of cement - stabilized silty soil subbase is constructed according to lab research results, and construction methods are summarized

    此外,研究了延遲成型時間對水泥穩定土的密度和強度的影響及底基層成型后至基層壓實前的合理養生齡期,最後,根據大量的室內研究成果進行了大劑量水泥穩定粉質土底基層試驗路的鋪築,並對施工工藝進行了總結。
分享友人