護坡工程 的英文怎麼說

中文拼音 [gōngchéng]
護坡工程 英文
q slope protection mtqhgk works
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑的綜合治理方案是由削方、錨索抗滑樁、擋墻、地表排水、整填縫、生物防等多種措施優化組合而成。治理后,在飽水有地震荷載狀態下滑的安全儲備系數為1 . 10 。
  2. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施時需要爆破施,對邊的穩定造成了不利影響,加之連續出現的幾次滑失穩事件,基坑支越來越引起了各方面的重視。
  3. In this paper, research is emphasized on the situation of slope protection in shaanxi areas, analyses the engineering and economic effect of all kinds of slope protection, compare the traditional protection with the new, puts forward the protection principle that should be followed in shaanxi areas, study the destruction mechanism and stability analysis of high slope in ocher area, and puts forward effected and economic new protection methods

    本文對陜西地區的邊狀況進行了研究,分析各種防型式的防效果及其經濟效益,並結合國內外的防新技術,對傳統防型式和新型防型式進行了對比分析,提出陜西地區在以後的防中應該遵循的原則,並研究了黃土高邊的破壞機理和穩定性判斷的方法,提出巖土邊有效、經濟的新型防措施及其施藝。
  4. With the guidance of foundation theory such as geotechnical engineering, garden vegetation, pedology, soil magnetism and environment engineering and the base of slope ecological protection, this paper studies ecological material protection techniques which is suitable for abrupt rock slope

    本文以巖土、園林植被學、土壤學、土壤磁學、環境基礎理論為指導,以邊生態理論為基礎,研究了適宜巖質陡邊生態恢復的生態基材方法。
  5. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路、橋梁、防浪堤、水庫堤壩、隧道、機場跑道、市政井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  6. Slope reinforcement is an important part of rock slope engineering, a typic type of engineering measurements to assure the slope and engineering structure and maintenance ’ s security in mountainous district fundamental constructions

    加固是巖石邊的重要組成部分之一,是山區基本建設中為保證山體和建築物及道路運營安全常採用的一種措施。
  7. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支體系基礎上開發應用成功的一種新型實用性支技術。其支機理類似於未嵌入坑底的排樁多錨支,只是由肋梁代替了開挖前施的排樁從而提前期並降低支造價;同時繼承了土釘墻隨挖隨支的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊中成功應用。
  8. Application of interlocking concrete slab in nenjiang dike slope protection

    混凝土聯鎖板塊在嫩江堤防護坡工程中的應用
  9. This new kind of slope protection can avoid some defects of traditional concrete prefabricated components and is worth of being spread in grit slope protection

    此種新型結構可避免傳統混凝土預制板的某些弊端,為砂堤護坡工程提供了具有實用價值的推廣方案。
  10. Third according to the practice, over 300 g / m2 of the staple nonwoven geotechnical fabric is used in the bank project of the large rivers, its tensile strength is 600 n / 5cm. forth the filtration under the traffic load, normally, the traffic load is repeated load and fast movement. in this case, thick filtration is applied, such as sand and / or thick fabric, of which weight is over 700 g / m2

    研究結果表明:對d _ ( 85 ) 0 . 074mm的土料,不宜採用土織物作濾層;對級配極不均勻的土壤(不均勻系數cu 2或cu 6 ) ,在滲流作用下,很容易發生管涌,對土織物的選用要慎重;一般大江大河的護坡工程至少應採用300g m ~ 2以上的短纖無紡土布,其抗拉強度為600n 5cm左右。
  11. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在項目的施期內,主要的活動包括挖填土方土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。
  12. Ancillary works including earthworks, construction of embankments, footpaths, drainage and river training works, slope works, landscaping works, construction of retaining walls, and the erection of noise barriers

    進行附屬包括土方行人路建築路堤渠務及改善河道環境美化建築土墻,以及設置隔音屏障。
  13. This paper presents analysis on the engineering geologic features, cause of revival and prediction of the developing trend of the captioned landslide in zigui county, together with the proposed treatment measures, which will be of reference value for other landslide treatment practices

    摘要在論述三峽庫區秭歸縣歸州四號滑地質特徵、復活原因、後期變化趨勢的基礎上,提出滑治理方案,進行預應力錨索抗滑樁、樁間檔土板、植被、地面排水等分項設計,總結本滑治理的設計經驗,供其它滑治理參考。
  14. As one part of the research program of study on reliability of stability of high rock slope and optimization of support, the thesis does further study on blasting and achieves some results as follows : ( 1 ) the interaction of shock wave and explosive gas due to blasting is the important cause to the destroy of the rock. the rock in the line of every hole is easiest to be destroyed while single - row blasting. dynamic loads of blasting can be simplified to triangular loads

    本文作為「巖質高邊穩定可靠性與支結構優化研究」研究課題的一部分,對邊中的爆破施進行了深入的研究,主要取得了以下成果: ( 1 )沖擊波和爆生氣體的共同作用是引起巖石破壞的重要原因;單排爆破中炮孔連心線上最容易破壞;爆破動力荷載可以簡化成三角形荷載。
  15. Abstract : taking the boshan - laiwu freeway as an example, the paper discusses the rocky deep cut slope problems from many sides such as : slope stability assessment, slope design, protection engineering and the constructional monitoring especially the explosion control etc. it stresses on the informational control principle of the deep and large cut slope

    文摘:該文以博菜高速公路為例,從邊穩定性評價、邊設計、防及施監控、尤其是控制爆破等多方面探討了山區高等級高速公路石質深路塹邊問題,強調了高大路塹邊的信息化控制原則。
  16. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊復雜性和錨固的特殊性,待邊開挖揭示后,根據邊的實際地層巖性,風化度、破碎度、構造裂面、體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊加固進行動態設計,確保體穩定結構安全。
  17. Slope surface protection works

  18. Construction of rockfall fence along the slopes on the north side of this section of tuen mun road

    于這段屯門公路北面的現存斜進行墜石保
  19. On the basis of the blasting and excavation and the shotcreting and rock bolting process of a large high slope engineering, the vibration transmission laws in the presplitting blasting, the rock caving blasing and the high slope blasting where the vibration is magnified are analyzed and compared. the effect of the blasting on the slope rock mass and the quality of supporting system construction are evaluated. on this basis, the construction quality control measures are worked out

    以某大型高邊的爆破開挖與錨噴支為基礎,分析比較了預裂、崩巖爆破與高放大的震動傳播規律,評價了爆破對邊巖體及支系統施質量的影響,據此提出了施質量的控制措施。
  20. A construction of a new road link between smithfield and pokfulam road including an underpass extending under pokfulam road and the pokfulam road playground, associated elevated structures, retaining walls, and slope works

    A興建一條道路連接士美菲路及薄扶林道,包括一條地下隧道建於薄扶林道及薄扶林道游樂場,以及有關的高架結構土墻和斜
分享友人