護面混凝土 的英文怎麼說

中文拼音 [miànhúnníng]
護面混凝土 英文
facing concrete
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Permeable durability reinforcing agent used for concrete surface is a material sealing surface of concrete, and it can permeate into inner of concrete and fill or block the pores of concrete surface with dry crystal or emulsoid generated by reaction between it and chemical compound in concrete

    用滲透型耐久性增強劑是一種針對的滲透封閉型材料,其可滲入內部,並通過乾燥結晶或與內部相關物質反應生成乳膠體將表層的孔隙填充、堵塞,對已有結構的防具有重要意義。
  2. Analysis for the product hydration process of natural maintenance show tailings and quartz sand surface is advantage for the major influence of hydration outcome in jing pei generate " base role ", do not participate in chemical reaction basically, while steam temperature and pressure for hydration structure and form of low silicon - tailings aerocrete have obvious influence, it is why the compressive strength of two products have obvious difference

    對自然養的製品水化過程分析的研究表明,尾礦和石英砂表對於水化產物的主要影響是利於晶胚生成的「基底作用」 ,基本不參與化學反應,而蒸壓溫度和壓力對低硅尾礦加氣水化產物的結構、形態有著明顯的影響,導致兩種製品的抗壓強度有明顯差別。
  3. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、原材料質量、澆築、成型割縫及養幾個方分析了機械化襯砌板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  4. In a word, it is show that joints could be strengthened by cfs and it could be put into use in civil engineering in large scale. at the same time, experiments also show than cfs used in joints strengthening have not been make full use. the failure mode of cfs is the debond failure between concrete and steel

    同時,利用對試驗構件的應變片分析,揭示了cfs加固節點的破壞具有其自身的特殊性,即cfs的利用率比較低、 cfs的破壞以層?主筋界的粘結破壞為主、加固試件和非加固構件破壞形態基本一致等特點。
  5. For finishing coat of epoxy floor paint on concrete floor and other concrete surfaces which need to be protected in chemical plant, pulp mill, paper mill, pharmaceutical factory and petrochemical works, etc

    本品用以塗布化工廠、紙漿廠、造紙廠、制藥廠、石化類企業等工廠的地坪,和其他需要保,作為環氧地坪漆漆。
  6. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷施工支體應力監測的工程實例,闡述了該大跨度地下空間支結構的參數選擇、地下空間的開挖方法、支體結構的應力量測方法及測試手段;分析了支體初期支工字鋼拱應力、錨桿軸力、噴射內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支體系失穩的原因。
  7. High performance concrete is a very popular key of research in structure material currently. but high performance cement mortar is lack of much attention. in fact, cement mortar and concrete are very close relationship

    原因是多方的,其中一個重要原因是砂漿的應用目前還主要是抹、找平和砌築,還沒有能夠上升到砂漿是等結構材料的保層的高度。
  8. The paper introduced the construction technology and the key point in tanghe inverted siphon project, including the construction technology in concrete temperature control and curing, concrete in bottom of soleplate, splayed concrete of soleplate, and other special parts - the surfaces in construction joints

    摘要介紹了唐河倒虹吸工程施工技術、施工的關鍵控制點溫控和養、底板根部、底板八字、施工縫附近鍘等特殊部位施工技術。
  9. It is respectively : production, facility for transporting operates personnel : jockey of lathe work, milling, grinding work, boring labour, solderer, modular machine tool, machining center jockey, casting matchs benchwork, besmear to install ship - fitter of ship - fitter of equipment of benchwork of labour, tool, boiler, electric machinery, discretion to control ship - fitter of appearance of ship - fitter of appearance of instrument of electric equipment ship - fitter, electron, electrical engineering instrument, machine ; irrigation works of aricultural herd fishing produces personnel : inspector of quarantine of the member that animal epidemic disease prevents and cure, animal, firedamp produces work ; personnel of line of business of commerce, service : the member that assistant, bagman, publication is issued, chinese traditional medicine purchase and sale, clerk of the member that the division of division of appraisal appraisal division, chinese style noodle, chinese style noodle, western - style cook division, western - style noodle division, division that move wine, nutrition distributes food, dining - room, antechamber clerk, client clerk, health care ; handle affairs personnel and concerned personnel : secretary, public relations member, the member that terminal of communication of computer operator, cartographer, operator, user is maintained

    分別是:生產、運輸設備操作人員:車工、銑工、磨工、鏜工、焊工、組合機床操作工、加工中心操作工、鑄配鉗工、塗裝工、工具鉗工、鍋爐設備裝配工、電機裝配工、高低壓電器裝配工、電子儀器儀表裝配工、電工儀器儀表裝配工、機修鉗工、汽車修理工、摩托車維修工、精密儀器儀表修理工、鍋爐設備安裝工、變電設備安裝工、維修電工、計算機維修工、手工木工、精細木工、音響調音員、貴金屬首飾手工製作工、石方機械操作工、砌築工、工、鋼筋工、架子工、防水工、裝飾裝修工、電氣設備安裝工、管工、汽車駕駛員、起重裝卸機械操作工、化學檢驗工、食品檢驗工、紡織纖維檢驗工、貴金屬首飾鉆石檢驗員、防腐蝕工;農林牧漁水利生產人員:動物疫病防治員、動物檢疫檢驗員、沼氣生產工;商業、服務業人員:營業員、推銷員、出版物發行員、中藥購銷員、鑒定估價師、中式點師、中式點師、西式烹調師、西式點師、調酒師、營養配菜員、餐廳服務員、前廳服務員、客戶服務員、保健按摩師、職業指導員、物業指導員、物業治理員、鍋爐操作工、美容師、美發師、攝影師、眼鏡驗光員、眼鏡定配工、家用電子產品維修工、家用電器產品維修工、照相器材維修工、鐘表維修工、辦公設備維修工、保育員、家政服務員、養老理員;辦事人員和有關人員:秘書、公關員、計算機操作員、制圖員、話務員、用戶通信終端維修員。
  10. Application of cast - in - situ grid plate to standard seawall

    柵欄板結構在標準海塘工程中的應用
  11. If the surface is covered or watered after casting of concrete, the influence resulted from change of environmental temperature and relative humidity on concrete will decrease to some extent. then the shrinkage stress will also decrease and the probability of cracking will be reduced as well

    澆注完后對表進行覆蓋或澆水養,可以很大程度上地減少外界溫濕度變化對內部的影響,減小了的收縮應力,從而降低開裂的可能性。
  12. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋防水層和保層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化配合比,灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋防水層和保層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  13. When the cement concrete pavement is opened to the traffic up to 3 ~ 5 years, especially when the wear resistance of the coarse aggregate is not good and the strength of the concrete pavement is not adequate, the wear in the original road surface will be more distinct in these cases. the phenomena of stripping, pit slot, surface pit, incompact and polish, filler damage and etc. usually happen in the cement concrete pavement. it will influence the traffic quality once the diseases appear in the cement concrete pavement

    本論文結合東北高速黑龍江分公司項目《水泥白色薄層罩技術的研究》展開工作,通過大量的試驗研究,從以往國內的修復材料,國外的同類材料中,參考道路修復材料的技術標準,路維修手冊和修補技術要求,吸取已有材料的長處和特點,研製開發了kg水性修補材料和kg油性修補材料,通過反復測試並做正交試驗,研製出最優配方。
  14. As support and liner against cross section rock, spraying - concrete has enormous influence on the tunneling progress and the safety of the tbm tunnel ' s tunneling machine

    作為隧洞斷巖石支撐和襯砌的重要手段之一的噴射對tbm隧洞掘進機掘進進度和安全影響極大。
  15. The scc has the following advantages : remarkably reducing the noisy pollution and the worker s labor intensity in construction, deducing the rough surface or segregation because of missing - vibration or excessive - vibration in conventional construction, resolving the quality - defect problems resulting from lacking - vibration in the section of complex shapes and densely - packed reinforcement area. at the same time, large of industrial solid waste such as fly ash and blast furnace slag is utilized in the proportioning of scc. it is helpful in comprehensive utilization of resource and environment protection, so the scc belongs to " green concrete ", it is a branch of hpc which will be developed in the future

    這種可以顯著降低施工中的噪音污染;大幅度減輕工人的勞動強度;減少傳統施工中因漏振或過振造成的麻或離析;解決了配筋密集、結構復雜部位因振搗不足而造成的質量缺陷問題;同時,由於自密實在配製中,大量利用粉煤灰、高爐礦渣等工業固體廢棄物,有利於資源的綜合利用和生態環境的保;從而被譽為「綠色」 ,是未來向高性能發展的方向之一。
  16. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷尺寸、塊體材料(塊石和卵石兩種) 、底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性鉸鏈體等一類整體性較好的層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  17. By means of inquisition, the paper analyzes the causes of cement concrete pavement damage in earlier period, divides its damage into stages and analyzes the damage mechanism in theory, then puts forward relevant countermeasure for all stages. on base of these, by studying large quantity of experiments indoors combined testing road, the technique of pressing mortar under cement concrete plank and changing pavement plank, the material used to quickly repair pavement and system for draining off water are analyzed and researched in detail from principle to craft. at same tune, all kinds of repairing material and technique adaptable to cement concrete pavement are put forward

    本文通過對水泥破損的調查,分析了造成水泥早期破損的原因;劃分了水泥破壞階段,對不同階段的破壞機理進行了理論分析,並相應的提出了各階段的維修養對策;在此基礎上,通過大量的室內試驗並結合試驗路的研究,重點對水泥板底壓漿技術、水泥的換板技術、水泥的快速修補材料以及對水泥的排水系統從技術、原理到材料工藝進行了詳細研究和理論分析,提出了適應各種水泥破壞的修補材料和修補技術;最後本文還對修築水泥提出了具有指導性的建議。
  18. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青防滲板和正在建設的壩高104m 、瀝青心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪防壩工程,施工工藝和施工機械化程度已達到或接近國際先進水平。
  19. Cause analysis and control of fangguanying reservoir dam upstream slope prevention destruction

    察爾森水庫坡灌漿和溢流修補
  20. Abstract : this paper presents the effect of curing to the strength of concrete from the aspects of curing humility, temperature and the treatment of wetting heat, etc. furthermore, the main points in controlling the construction curing are given as well

    文摘:從養濕度、溫度和濕熱處理等方闡述了養強度的影響,並對施工養控制要點進行了說明。
分享友人