豎尺 的英文怎麼說

中文拼音 [shùchǐ]
豎尺 英文
vertical staff
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : 尺名詞[音樂] (中國民族音樂音階上的一級 樂譜上用做記音符號 參看「工尺」) a note of the scale in ...
  1. Use a square to align each rib at 90 degrees from the spars and perpendicular to the span

    使用一個曲以從桅桿和直到跨度的90度排齊每個肋。
  2. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  3. Early data of mount jade indicated that its height is 3997 meters, so former chinese youth hiking association built a 3 - meter - high bronze statue of yu yo - ren at the peak so that the total elevation is 4000 meters. but after two intentional damages, the authority decided not to build another one, but a stone that says " mount jade main peak, 3952 meter ", due to historical and ecological reasons

    早期玉山曾有資料標高為三千九百九十七公,前中華青年登山協會因而在山頂興建高三公的于右任銅像,讓玉山增高到四千公,后經二次人為刻意破壞后,玉管處考量歷史、生態景觀等因素,決定不再塑銅像,改立寫有玉山主峰、標高三千九百五十二公的基石。
  4. The vertical spread of fire along the external wall is affected not only by the building - height and window dimensions, but also by the protrude components such as balcony, windowsill and fireproof eave, etc. the balcony is an important part of buildings and used widely

    火焰沿外墻面直向上的傳播速度,不僅要受到建築高度、開窗寸的影響,而且還受到墻外凸出構件,如陽臺、窗臺、防火挑檐等因素的影響。陽臺是建築物的重要組成部分,運用普遍。
  5. Workmen dig, workmen hammer, soldiers laugh and sing ; in the morning, by the fountain, there is raised a gallows forty feet high, poisoning the water

    工人挖地,工人釘釘,當兵的又笑又唱。到了早上,泉水邊起了一個四十英高的絞架,把泉水都變得有毒了。 」
  6. Interaction of run - on slab and soil is simulated by “ m ” method, run - on slab is constrained by soil through the vertival and horizontal, advances computing model of new type semi - integral abutment bridge. ( 3 ) this paper takes hengyang dashuiting middle bridge for test supporting project, designs full scale model test which can reflect truly interaction of beam, run - on slab and the embankment behind the abutment of new type semi - integral abutment bridge

    通過「 」法來模擬搭板與土體之間的相互作用,用向彈簧和水平彈簧來實現土體對搭板的約束作用,建立了新型半整體式無縫橋梁的計算模型; ( 3 )以衡陽大水町中橋為試驗依託工程,設計了能真實反映新型半整體式無縫橋主梁、搭板以及臺后填土相互作用的足模型試驗。
  7. The carpentry team built seven frames of equal size to support the large background painting that would be placed on the stage. several fellow practitioners then secured canvas fabric over each of the frames, which stood nine meters high, due to the enormous size of the lecture venue formosa s largest indoor stadium. the sections were then carried by five brothers from the basement of the taoyuan center to an empty lot in front of the kitchen, where they were erected and placed together for painting

    由於師父的講經會場非常的寬廣,光是講經臺背景的布幕就有九公高,所以先由木工同修將框架釘好,再由數位同修負責裱好胚布,這些工作都在中心的地下室進行,裱好的畫布須由四五位大漢從地下室以人力搬運至中心廚房前的空地,以便將畫布立起來作畫。
  8. The canvas stands at over 8 feet high and depicts a portly and rosy - cheeked washington as commander of the continental army at princeton, new jersey

    據路透社1月18日報道,這幅油畫立起來后的高度超過了8英,其所描繪的華盛頓顯得神態威嚴且雙頰紅潤。
  9. " it ' s only the second time in 150 years that winged lion statues have been found on this site, " he said, adding that the sculptures stand five meters ( more than 16 feet ) tall

    「這是在150年之內在這個地方第二次發現了有翼的獅子雕塑, 」他說,並說雕像立起來有5米高(超過16英) 。
  10. For the comprehensive cognition to the prestressed concrete frame, four monolayer and monospan frames is built, two of which are loaded only vertically and the other two are loaded vertically and horizontally at the same time

    為了對預應力框架的受力性能有一個全面深刻的認識,重慶建築大學又製作了四榀接近足的單層單跨預應力框架,並對其中兩榀同時施加水平荷載和向荷載進行了試驗研究。
  11. Based on the experimental study of two presstressed frames, it analyses the question of redistribution of internal force and analyses influence of moment modulation of prestressed frames. therefore, it draws some conclusion as follow : 1 ) post - tensioned prestressed frames can be practiced on moment modulation. but how to operate decides on practical situation in design

    本文通過對兩榀近於足的后張有粘結預應力框架在跨間向荷載作用下的試驗研究,探討了預應力框架內力重分佈問題,從塑性內力重分佈入手分析了次彎矩對框架彎矩調幅的影響以及影響內力重分佈的其他主要因素,得到一些概念性的認識和結論: ( 1 )對后張有粘結預應力框架可進行適當調幅。
  12. First1y, in this paper, the testes about tensi1e resistance of masonry components in different period are processed and re1ated suppositions and formu1as are brought forward : the formu1a about maxima1 shear stress of top side in high or tier masonry bui1dings is deduced. it can be found easi1y that the factors affect ing the maxima1 shear stress are vertica1 resi stance coefficient 1oad magnitude wa11 geometry dimensions and its modu1us of e1asticity

    首先,進行了不同齡期下的砌體試件抗壓力學性能試驗,提出了相關的假定和公式,推導出了縱橫墻荷載差影響下的多、高層砌體結構房屋頂層的最大剪應力公式,從中可以看出影響最大剪應力的因素有向阻力系數、荷載大小、墻體的幾何寸和墻體的彈性模量等。
  13. Hence, large, long, and complex - shaped parts must be properly supported at critical positions to avoid sagging or preferably are hung with the long axis on the vertical

    因此,對寸大,長度大,形狀復雜的部件,必須正確支撐其關鍵位置,以防產生弧垂,也可以將其長軸直懸掛。
分享友人