負荷變號 的英文怎麼說

中文拼音 [biànháo]
負荷變號 英文
reversal of load
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 號Ⅰ名1 (名稱) name 2 (別號; 字) assumed name; alternative name3 (商店) business house 4 (...
  • 負荷 : [電學] load; charge; weight
  1. Based on power spectrum and rbf neural network to classify surface electromyography

    不同方式引起的腰部肌肉表面肌電信化特徵
  2. The numerical results indicate that the deformation within the solid inner core is very small. however, in the fluid outer core, the changes of the displacement with relatively low spherical harmonic degree ( n < 10 ) is very complicated via the radius, due to the resonance near the eigenfrequenies of the core long - period oscillations. while the spherical harmonic degree of the loading is larger than 10, the deformation and the gravitational perturbation in the core are very small, and the earth ' s deformation response is dominantly represented as the radial displacement in the elastic mantle

    研究了地球在日月引潮力和表面作用下的形特徵,數值計算結果表明,在固體內核中的形很小,由於在長周期核模本徵頻率附近的共振,液核中低階( n 10 )位移隨半徑的化非常復雜,當階數超過10時,地核中的形和擾動位都很小,地球的響應主要表現為彈性地幔中的徑向位移,且隨深度增加急劇減弱,地表love數與信頻率的依賴關系很弱,給出了體潮love數計算的一種有效的近似處理方案。
  3. The combustion - optimizing and automatic control system is being adopted on boiler no. 2 in jiaozuo power plant, successfully realizing the combustion optimizing control of said boiler under constant load and varying load conditions, the on - line combustion debugging test, and the monitoring analysis of operation economic behavior, making the said boiler always to be safe operation with highest efficiency, enhancing averagely the boiler efficiency to more than 0. 5 %, economic benefit being obvious

    摘要焦作電廠2爐採用燃燒優化與自動控制系統,成功地實現了鍋爐定過程的燃燒優化控制、鍋爐在線燃燒調整試驗和運行經濟監測分析,使鍋爐時刻在最高效率下安全運行,鍋爐效率平均提高0 . 5 %以上,經濟效益顯著。
  4. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽水蓄能電站的水泵運行時,不同工況下停機、導葉和轉輪間壓力的化,闡述了華東桐柏抽水蓄能電站1機組發電機斷路器開斷的最佳值選定。
  5. The main product instant no power but automatic compensating controlling device is especially applicable to the places, where the instant charge changes acutely and continually, and this product has got state patent and the quality and technical indexes are one - up level of our country in the same products, and it has been recognized as energy - economizing product by china energy - economizing association and it has won the award of excellent technological product of international technology management association and it has been added to 1 net of china petroleum energy

    主要產品瞬時無功功率自動補償控制裝置,特別適用於瞬時化大而頻繁的用電場所,該產品已獲國家專利,在同類產品中質量及技術指標處于國內領先水平,被中國節能協會認證為「節能適用產品」 ,榮獲國際科技管理協會「優秀科技產品」獎,已加入中國石油能源一網。
  6. Redundancy design and module circuit design have been used, and completely think over the adaptability to environment, self - protection and heat release. the control software is compiled with asm language, the software includes the air - fuel ratio control program under different situations, monitor program and signal processing program

    根據發動機的工作特性用匯編語言設計相應的綜合控制軟體,它包括發動機起動、怠速、加速、減速、恆速和等工況的空燃比控製程序、串列和并行通訊程序、信採集及數據處理程序和控制量輸出程序。
  7. The water turbine regulation system is a complicate auto - controlling system, it ' s small fluctuation dynamic course means : when the water turbine regulation system is interfered by tiny disturbance of load or command signal, the change of different parameters in the system is less, we can thought they are subtle change near by the discussing conditions, so we can make each tache in the system linearization, that is, describe the dynamic specialty of each tache and the whole system by means of linear differential equation

    水輪機調節系統是一個復雜的自動控制系統,其小波動過渡過程是指水輪機調節系統在受到微小的干擾(或指令信擾動)時,系統中各參數的化都較小,可以認為是在所討論工況點附近作微小化,則可將調節系統各環節加以線性化,用線性微分方程式來描述各環節及整個系統的動態特性。
  8. Only the future load of supply area is ascertained that the strategic variables including the substation location and capacity electric lines " route and style switchers " setting up and time when to bring into service can be forecasted

    只有確定了配電網供電區域內各小區的未來,才能對電站的位置、容量,線路的路徑、型,開關設備的裝設及其投入時間等決策量進行規劃。
  9. Correction problem of the ocean loading signals to strain field variation at foundational stations in crust movement observation network in china

    中國地殼運動觀測網路基準站應化的海潮改正問題
分享友人