起吊梁 的英文怎麼說
中文拼音 [qǐdiàoliáng]
起吊梁
英文
lifting beam-
Destabilization laws of an arcuated built - up system bridge are provided, nonconservative force of hanger rods and members " bearing force are integrated in order to consider influence of hanger rods towards arch stability
提出了拱式組合體系橋梁的失穩規律,將吊桿非保向力和構件受力結合起來考慮吊桿對拱穩定性的影響。The company specializes in production of model jpkk series endless chain electric block, jkbk flexible single main beam hanged crane, rotary beam hoist, as well as all kinds of motor, carriage, control box, etc
本公司專業生產jpkk型系列環鏈電動葫蘆、 jkbk柔性單主梁懸掛起重機、旋臂吊起重機以及各種電機、小車、控制箱等。It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up
本船改建后為非自航固定式起重船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石油鉆井採油平臺和其他海上弔裝工程。During cantilever construction of large span cable - stayed bridge steel box girder, the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane
摘要大跨度斜拉橋主梁懸臂拼裝匹配過程中,吊機作用梁段和被起吊梁段由於受力不同,相對變形存在較大差異。It was essential that the lifted girder could be moved by any angle. a hand drawn chain hoist was used instead of a steel wire rope to enable the girder to be moved freelyby any angle. the suspension centers should be kept far apart but to the front as much as possible
起吊后的鋼梁靈活、方便的角度調整是關鍵,吊裝時用有足夠行程的手拉葫蘆代替鋼絲繩,以便進行角度調整,要求吊點相距要大一些,而且吊點盡量靠前端。This ship is a non - propelled fixed luffing 500t steel crane vessel. this vessel is mainly used to lift and hookup the concrete components, bridge blocks, mechanical electrical equipments for harbours, bays, quays and jetty
建港304為非自航固定變幅式500噸鋼質起重船,主要用於中國南海沿海各港灣港口及內河碼頭和堤岸的混凝土構件橋梁機電設備等吊裝工程。Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality
摘要採用起重機吊裝預制梁,具有施工機具簡單、易於操作、成本低、工期短、質量安全易於保證等優點。Type lxg suspension over - rail crane is specially designed for use at coal, mill in power plant, it applies to hoisting the roller spare parts of coal mill and etc, it is also suitable for use of connecting the workshop and various site where it is needed
Lxg型電動單梁懸掛過軌起重機是為我國大型火力發電廠輸磨煤系統而設計的專用起重設備,主要用於吊運磨輥及其它磨煤機部件,它還適用於連跨車間以及需要懸掛過軌的各種現場。Lifting beams of overhead monorail
單軌吊車起吊梁The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。分享友人