起吊 的英文怎麼說

中文拼音 [diào]
起吊 英文
sling; crane起吊高度 sling height
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : hangsuspend
  1. The garret, built to be a depository for firewood and the like, was dim and dark : for the window of dormer shape, was in truth a door in the roof, with a little crane over it for the hoisting up of stores from the street : unglazed, anal closing up the middle in two pieces, like any other door of french construction

    閣樓原是做儲藏室堆放柴禾之類的東西用的,十分陰暗那老虎窗樣的窗戶其實是房頂的一道門,門上還有一個活動鉤,是用來從街而起吊儲藏品的。那門沒有油漆過,是一道雙扇門,跟一般法國式建築一樣,從當中關閉。
  2. The measurement, gross weight, net weight of each package, port of destination and any necessary cautions such as “ do not stack upside down ”, “ keep away from moisture ”, “ handle with care ”, “ hookon point ” shall be stenciled on the surface of each package with fadeless pigment, whenever necessary

    1每件包裝貨物的尺寸、毛重、凈重、目的口岸以及任何必要的注意事項,例如: 「不要倒置」 、 「防潮」 、 「小心輕放」 、 「起吊點」等,在有必要時應以不褪色的顏料印刷在每件包裝物的表面。
  3. The contract no., measurement, gross weight, net weight of each package, the heat number, port of destination and any necessary cautions such as “ do not stack upside down ”, “ keep away from moisture ”, “ handle with care ”, “ hook - on point ” shall be stenciled on the surface of each package with fadeless pigment, whenever necessary

    1每件包裝貨物的合同編號、尺寸、毛重、凈重、爐號、目的口岸以及任何必要的注意事項,例如: 「不要倒置」 、 「防潮」 、 「小心輕放」 、 「起吊點」等,在有必要時應以不褪色的顏料印刷在每件包裝物的表面。
  4. Most plants are provided with hoist wells for handing parts.

    大多數工廠設有搬運零件的起吊孔。
  5. Most plants are provided with hoist wells for handling parts.

    大多數工廠設有搬運零件的起吊孔。
  6. With the standardized workshop occupied 11600m2 and 630t hydraulic presses, 315t two axle punch presses, 250 sets of large, middle, small equipments, the company has the whole series production line. main equipments include cut - board machine, incurvate machine, opened incline pressure machine, drill attack machine, auto - moving hang machine, various kinds of moulding plastic machine, lathe, planer, drilling machine, horizontal axis rectangle platform flat grinder, universale lifting platform milling machine, eccentricity axis punching machine, liquid pressure derrick car, etc

    主要設備有: 630噸液壓機315噸雙軸沖壓機250噸沖壓機等大型沖壓機床,剪板機折彎機鉆攻兩用機自動走軌起吊機各式型號注塑機各式車床刨床鉆床臥軸矩臺平面磨床萬能升降臺銑床偏心軸沖床液壓重車等大中小設備386多臺套,形成具有自動沖壓步進的生產線。
  7. Make sure inner facing is long enough in order to avoid pulling at placket bottom

    確保襟貼足夠長以避免前襟起吊
  8. 2 ) from the angle of constructing course, steeve - arch supporting structure requires low - capacity cranes to erect, and simple constructing methods easy to meet. the time spending on construction is short. the usual arch supporting structure requires high - capacity cranes to erect, and complicate constructing methods hard to meet

    2 )從施工角度看,桿式拱架支承結構對車的起吊能力要求低,工藝簡單,施工方便,工期短;豎桿式拱架支承結構頂重量大,對車的起吊能力要求高,施工難度大。
  9. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮,完成了水上運輸、水上重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機車的水上轉移、承臺箱的起吊、鋼管樁的拔除等作業。
  10. Center back seam pulling

    后中起吊
  11. Beginning to erect no. 1 boiler steel structure on nov. 15, 1995. beginning to erect no. 2 boiler steel structure on jan. 18, 1996

    4 1995年11月15日1號爐鋼架起吊, 1號機開始安裝。
  12. During cantilever construction of large span cable - stayed bridge steel box girder, the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane

    摘要大跨度斜拉橋主梁懸臂拼裝匹配過程中,機作用梁段和被起吊梁段由於受力不同,相對變形存在較大差異。
  13. All of cranes are used in heavy duty service with double brakes to ensure safe operation

    重機均為重級工作制度為確保起吊安全升機構備有雙制動器。
  14. The walking track rail of the bracket - type crane is installed on the cement post in the factory building, along which this crane can do the vertical movement. at the same time the electric block can finish the swinging function along the vertical and horizontal movement of spiral arms

    該機行走道軌安裝在廠房的水泥柱上,沿著道軌可做縱向運動,同時電動葫蘆又可完成沿旋壁的橫向運動以及垂直方向的起吊功能。
  15. It builds a physical model according to hoisting capacity, lifting angle and structural stabiliy, theory, solves the problem of function relationships among lifting capacity, lifting angle, boom weight, boom dimension and deduces the natural boundary condition of design parameters, providing a new way to determine crane design parameters

    摘要將重量和起吊幅度為基本設計依據,以壓桿穩定理論為分析基礎,結合專業知識,建立物理模型,解決了重量、起吊幅度與臂質量、臂主要參數之間的函數關系的難題,首次確定出設計參數的自然邊界條件,為重機設計者提供了確定設計參數的新方法和科學依據,具有開創意義。
  16. A helicopter lowered a paramedic, who attached nancy to a life - support hoist

    一架直升機放下了一位醫務人員,醫務人員將南茜系在生命維持起吊裝置上。
  17. Top terminal link on slings for lifting aircraft

    起吊飛機用上部終端
  18. It was essential that the lifted girder could be moved by any angle. a hand drawn chain hoist was used instead of a steel wire rope to enable the girder to be moved freelyby any angle. the suspension centers should be kept far apart but to the front as much as possible

    起吊后的鋼梁靈活、方便的角度調整是關鍵,裝時用有足夠行程的手拉葫蘆代替鋼絲繩,以便進行角度調整,要求點相距要大一些,而且點盡量靠前端。
  19. If the units are too large for one crane they are sometimes lifted by two cranes working together.

    如果構件太大以至於一臺車難于起吊,有時可用兩臺車同時起吊
  20. Rescue equipment. rescue lifting devices

    援救設備.援救起吊裝置
分享友人