起重機吊運工 的英文怎麼說

中文拼音 [zhòngdiàoyùngōng]
起重機吊運工 英文
crane rigger
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : machineengine
  • : hangsuspend
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 起重機 : crane; derrick; crab; freight elevator; hoist; lifter; cranage; hoister
  • 起重 : jack up起重臂 jib loading boom; cargo boom; erector arm; jibboom; 起重車 carriage hoist; crane ca...
  1. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮,完成了水上輸、水上等作業,如鋼管樁的輸、插打、水上施平臺的搭設、鉆車的水上轉移、承臺箱的、鋼管樁的拔除等作業。
  2. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座1臺10噸門1臺汽車8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的輸噴塗精加設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船期為7 10天。
  3. The laminated jib crane is suitable for the production and maintenance in such fields as machinery manufacture, railway, chemical industry, light industry, etc. the characteristics of this product are novel structure, convenient operation and high efficiency

    疊臂式旋臂適用於械製造,鐵路化,輕等行業的生產維修場合。該產品具有結構新穎,伸屈自如,操作靈便,高效節能,是短距離作業頻率高的生產線上的理想的設備。
  4. The stationary slewing crane has such characteristics as simple structure, convenient operation, high efficient, etc. it is widely used for the feeding and laying off of the workpiece of production line, assembly line and lathe in the workshops, and the material swinging operation in such places as the warehouse, quay, etc

    定柱式旋臂定柱式旋臂,具有結構簡單操作方便節能高效等特點,廣泛用於礦車間的生產線,裝配線和床的上下件,以及倉庫碼頭等場所的物料作業。
  5. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移施中的具的選擇與布置、施平面布置、桁架結構拼裝單元及滑移單元劃分、滑移施方案及藝流程、桁架的連接、拼裝輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多藝問題。
  6. Improvements such as upgrading the sailing information display system, replacing the baggage handling cranes and refurbishing public toilet facilities are being made to the terminals

    兩個客碼頭現正進行改善程,包括改進航班資料顯示系統、更換行李,以及翻新公廁設施。
  7. This paper introduces the trolley - lifting load movement model and the revised model with damp for container crane operation simulator, works out swing angles of the load in different conditions by means of numerical analysis method and discusses effectiveness of the reducing swing by controlling trolley moving

    摘要給出了在港口集裝箱虛擬操作訓練系統中小車動模型及加阻尼項后的修正模型,並採用數值計算方法求得了在不同況下的的擺動,且討論了控制小車動時的減搖效果。
  8. Taking the derrick hoisting as an example and using the programming tool. visual c + +, the applications of computer - aided calculation & analysis for hoisting work in construction have been discussed in this thesis, which is based on computer simulation and timing control

    本論文從裝作業過程的計算模擬角度出發,引入適時控制的思想,利用visualc + +可視化編程具,以較先進的推舉法為例來探討裝作業過程中的計算輔助計算與分析在建設程中的用。
分享友人