超時線路 的英文怎麼說

中文拼音 [chāoshíxiàn]
超時線路 英文
toc time out circuit
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. In this thesis, the author analyses the deficiency in detecting and controlling function of the computer detecting and controlling system utilized in present transforming station. the strategy of design of software on operation and direction of 5 00kv transformer station is presented. it points out that we can deduce the mathematic analytical formula using the current, voltage and power of two terminals of transmission line as input. on this basis, we do realtime calculation of 500kv transmission line ' s parameter. we can also deduce the linear analytical formula of three - winding autotransformer ' s resistence using its current, voltage and power as input. the corresponding software is programmed on this basis

    論文提出以輸電本端和對端電流、電壓、功率作為輸入量,導出了高壓長的波阻抗和傳播常數的數學解析式,在此基礎上進行了500kv輸電參數計算;提出以三繞組自耦變壓器的電流、電壓、功率為輸入量,導出了自耦變壓器繞組的電阻、電抗的性解析式並進而對變壓器的實參數進行計算;在此基礎上編制了相應的軟體。
  2. Going in the other direction, an intel p4 or amd athlon running at clock speeds over a gigahertz should be able to satisfy the requirements of a 45 megabit t3 line

    另一方面,以過1ghz的鐘速度運行的intel p4或amd athlon應該能夠滿足一條45兆位t3的需求。
  3. Network manager is the world ' s leading network management system with more than 500 installations worldwide in power generation, transmission, distribution, energy trading, business management and central market applications

    一旦發生故障或者負荷,網管理員系統將即確認其地點,使工作人員可以隔離故障,利用另一條供電,並且派遣服務隊伍直接趕赴故障地點。
  4. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營間分,有:日間公交車、 「 2 」字頭的早晚高峰車和「 3 」字頭的夜宵車;按地域范圍分,有浦西的、浦東的、過江的(含大橋、隧道)和郊區;按票務方式分,有單一票價1元(全程13公里以下的)或1 . 5元(全程13公里的)的無人售票車(市內公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的絕大多數是無人售票車,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調車和多級票價的專車(有「 5 」字頭的大巴專、 「 6 」字頭的浦東專車、 「 8 」字頭的中巴專和「 9 」字頭的雙層車或空調大巴,還有十條空調旅遊專) 。
  5. Through specification and project fact, this paper puts forward 3 terms of superelevation easement curves for establishing in high grade highway mute design, and then deduce a critical formula, in order to treated separately to establish superelevation easement curves

    摘要通過結合規范和工程實際,提出對高等級公設計中高緩和段設置的三個條件,並推導出臨界判斷公式,以便在高緩和段設置區別對待。
  6. Two of us ( grant and starr ) developed the idea further in papers that explored how ultracold hydrogen ? either liquid or supercritical gas ? might both chill the superconducting wires and deliver energy in chemical form within a continental - scale system

    我們其中兩位作者(葛蘭特和史塔)曾經發表論文,探討冷氫(包括液態或臨界態)是否可用以建立大陸規模的系統,在冷卻的同,傳輸化學能源。
  7. High - qualified designers and engineers of chaowei are able to provide various high - qualified design services such as ic software program, circuit board, product appearance, products structure, and product package, etc. the factories directly under chaowei have advanced production abilities including mould making, inection moulding, surface spray - painting, silk - screening, shift - screening, smt, welding and assembling, quartz clock core production, and quality check and assurance. chaowei held many design patents and utility model patents, at the same time, national clock and watch quality certification, national technical supervision bureau certification, usa fcc and astm security authentication, canada ic, and euro ce are achieved, the rich experience in oem and odm can ensure high quality products and professional service

    維公司擁有一批高素質的專業設計師和工程師,有能力為國內外客戶提供包括ic軟體編程板設計產品外觀設計產品結構設計產品包裝設計等多方面高水準的設計服務維的直屬工廠則擁有模具製造注塑成型表面噴漆絲印移印smt焊接裝配石英鐘機芯製造品質檢驗測試等先進的生產能力維公司的產品擁有大量的外觀設計專利和實用新型專利,同獲得了國家鐘表質量檢驗中心的合格證書國家技術監督局檢驗合格證書美國fcc認證和astm安全認證加拿大ic認證歐盟ce認證。
  8. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期容量3000千瓦的火力發電廠,總供電能力過7500萬千瓦,日負荷達1 . 5萬千瓦。區內代電網齊全,供民覆蓋城鄉。
  9. In order to avoid the ehv system disaster caused by reclosing on the permanent fault of transmission line, adaptive autoreclosure based on microprocessor - based protection arises at the historic moment, but is still in the stage of theory study

    為了避免高壓輸電採用自動重合閘重合於永久性故障所造成系統穩定破壞等重大系統災難,在微機保護的基礎上,自適應重合閘應運而生,但尚處于理論探索階段。
  10. We studied many methods to improve the tcp / ip in wireless environment, such as tcp / ip initial slow start algorithm, initial window and retransmission time out ( rto ) estimate. finally, we consider the round - trip time ( rtt ) with the physical layer and the transfer layer combined together. physical layer using rtt related to the channel state and transfer layer using the constant rtt, the interference between the two layers can be eliminated, and so the effectiveness of the wireless data link can be enhanced

    研究了tcp ip的慢速啟動演算法、初始窗口、重傳估計以及改善無tcp ip性能的各種方法,提出了一種把物理層鏈和傳輸層相結合處理往返間( rtt )的方法:物理層鏈採用與通道相關的動態rtt ,傳輸層採用常數rtt ,消除了兩層rtt之間的相互干擾,從而提高了無的利用率。
  11. Ng, now a principal investigator and was involved in the investigation then, explained : " some drivers liked to work on routes closer to their residences so that their families could bring them meals during breaks. some wished to drive on routes around upmarket residential areas or commercial districts because of the refined passenger pools. the most sought - after routes were the cross - harbour - tunnel routes

    曾經參與當年調查工作的首席調查主任吳炳國解釋:有些司機希望駕駛的鄰近自己的家,上下班方便,家人又可送飯送湯有些則喜歡行走高級住宅或商業區,因為乘客較為斯文有禮不過,最受歡迎是隧道巴士,因為全部都是新車,行車間短,還有半小吃飯間,較諸其他的司機只能在停站才吃一口飯舒服得多而且更可賺補水。
  12. The selection, installation, operation and calibration of diagonal path transit time ultrasonic flowmeters for industrial gas applications

    工業氣體用對角徑通過聲波流量計的選擇裝配操作和校準
  13. Supergrid connections to these new power plants would provide both a source of hydrogen and a way to distribute it widely, through pipes that surround and cool the superconducting wires

    連接這類新發電廠的級電力網還可以供應氫能源,同透過圍繞在導體周圍的冷卻管,將氫輸送到各地。
  14. The results of simulation show that every dynamics performance of trailer meet the need of what references and design required to the new train. the ride index of trailer is compared when running on the railway whose grade is higher and on the railway whose grade is low. it shows that the ride index of trailer can meet the need of design when running on the railway whose grade is high and the ride index is worse and the numerical value exceed what reference required to new train when running on the railway whose grade is lower

    比較了拖車在等級較高的上和在等級較低的上運行的平穩性能,指出研製的擺式電動車組拖車在等級較高的上運行,平穩性滿足有關標準對于新造車的要求,在等級較低的上運行,平穩性能惡化,出有關標準對于新造車的要求。
  15. Long distance vhp wireless communication transmission requires only moderate transmission power and reasonable equipment cost, also the channel is very difficult to be destroyed

    利用短波進行無遠距離移動通信傳輸,僅需要不大的發射功率和適中的設備費用。且其通信不易被摧毀。
  16. Kingboard chemical holdings limited sehk : 148 is one of the world s largest manufacturers of laminates and printed circuit boards, operating more than 40 plants in china, vertically integrated with in - house capability for the production of copper foil, bleached kraft paper, glass yarn, glass fabric, formalin, hydrogen peroxide, epoxy resin and tbba

    建滔化工集團香港交易所: 148為全球最大覆銅面板及印刷板生產商之一,在中國各地設有過40家廠房。集團成功實行垂直生產整合,現已具備自行生產銅箔漂白木槳紙玻璃絲玻璃纖維布甲醛雙氧水環氧樹脂及四溴雙酚a等覆銅面板所需原料的生產設施。
  17. The achievements achieved in the study are presented as follows : ( l ) to the distribution of construction duration of the pert network, even though every activity duration obeys normal distribution, it is failed to be proved to be in the obedience with normal distribution strictly. however, if there - are a lot of activities in a path of the pert network, for instance, more than 20 activities, without reference to the normal distributions - distribution or triangle distribution which activities duration obeys, the construction duration approximately obeys the normal distribution when the form of distribution is not partiality seriously

    通過本文的研究取得的新成果有: ( 1 )對pert網施工工期的分佈,即使每一活動持續間服從正態分佈,也不能證明其嚴格服從正態分佈,但當pert網上的活動較多,如過20項,不論活動持續間服從正態分佈、分佈,還是三角分佈,當偏態不十分明顯,則工期近似服從正態分佈。
  18. With the input of a vibration acceleration history of subway train, a full dynamic analysis of soil - pile - structure is carried out. the propagation of vibration wave on the ground and vibration responses of the huge platform and the storied buildings are analyzed. some conclusions are drawn as follows : ( 1 ) with the increase of the distance to the vibration source, vibration intensity of the ground decreases ; ( 2 ) the vibration intensity of the ground in vertical direction is slightly larger than that in horizontal direction ; ( 3 ) with the increase of the distance to the vibration source, the situation that the vibration intensity of each building in horizontal direction is maximum at highest and lowest story whereas minimum at the middle story changes gradually to that decreasing with the height of building ; ( 4 ) in vertical direction, the vibration velocities and accelerations at the end points of each story of a building are the nominal identical, which indicates that the vertical vibration of them is unanimous ; ( 5 ) the vibration intensity in vertical direction of a building is larger than that in horizontal direction ; ( 6 ) increasing of the elasticity of track is an effective way to abate vibration of ground and buildings

    本文以北京地鐵八王墳車輛段地上大結構(車輛段大平臺及其上的小區樓房)及其地基基礎為研究對象,在研究和分析有關資料的基礎上,用快速拉格朗日有限差分法軟體flac建立了二維數值分析模型,並以列車振動加速度程作為模型輸入,進行了地基?樁基礎?地上結構的整體動力學分析,分析了地鐵列車運行產生的振動在地面的傳播規律及其對地上結構的影響,得到了如下結論: ( 1 )隨著與地鐵距離的增大,地面的振動強度有減小的趨勢; ( 2 )地面豎直方向的振動強度較之水平方向的略大; ( 3 )隨著與振源距離的增大,在水平方向上,地上各幢樓房的振動強度由底層和頂層的最大、中間層的最小逐漸過渡到沿樓層增高而減小; ( 4 )在豎直方向上,每幢樓各層端點的振動速度、加速度完全相同,表明樓房各層在豎直方向上的運動狀態一致; ( 5 )各幢樓房豎直方向的振動強度比水平方向的大; ( 6 )增加軌道彈性是減輕地面和地上建築振動的有效途徑。
  19. The patch adopts the roll needle set and adapt to all kinds of thick film

    薄帶感應,能自動切斷電源,使用間長,夾片裝置採用滾針式裝置,適用於各種厚度膠片。
  20. Ac lines become inefficient at distances around 1, 200 kilometers, because they begin to radiate the 60 - hertz power they carry like a giant antenna

    傳輸距離在1200公里左右,交流的效率會降低,因為會開始輻射出自己所輸送的60赫茲電力,就像支大型天
分享友人