超級運載 的英文怎麼說

中文拼音 [chāoyùnzǎi]
超級運載 英文
super carry
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 超級 : super
  • 運載 : carry
  1. According to a study conducted by the marine department, hong kong is able to handle mega containerships 10, 000 to 12, 000 teus which are expected to be in operation within the next few years

    據海事處進行的一項研究,香港可容納1萬至1 . 2萬teu的貨櫃船,這些船舶預料在未來數年投入服務。
  2. Because traffic flow greatly increases in recent years and the rank of actual driving load enhances, causing this bridge to be at the excess load the service condition, so in order to guarantee the bridge ' s transport security, the main body structure of the bridge should be reinforced

    摘要長沙市八一路跨線橋由於近年來交通流量大增,實際行車荷提高,使得該橋處于負荷的營狀態,為了保證大橋營安全,需要對此橋的主體結構進行加固,在選擇加固方案時對比了三種加固方法:鋼混凝土組合結構加固方法、混凝土結構擴大截面加固方法、粘鋼加固方法。
  3. In the condition of non - axisymmetrical stage separation in hypersonic flight, the problems of dynamics and kinematics of the validating vechicle and the launch vechicle are primarily analysised. it includes the movement of the center of mass and the rigid body of the vechicles, the relative movement of the different vechicles, the relative movement of the special parts of the different vechicles, the load analysis and the probable collision in the process of stage separation

    研究了在高聲速狀態下非對稱間分離過程中,驗證飛行器與火箭分離時的相關動學和動力學問題。包括:飛行體質心動和剛體動;不同飛行體之間的相對動;不同飛行體上特殊部位之間的相對動;分離過程中各相關飛行體上的荷分析和分離過程中可能發生的碰撞問題。
  4. The construction of the hyper spatial propulsion drive for integration into a deltan spaceship begins. this propulsion system is hoped to provide hyper - spatial transit to its carrier craft

    用來嵌入德爾塔宇宙飛船的,空間推進器裝置的建設開始了。該推進器系統被盼望成為空間推進器提供它的飛行器。
  5. With the developing highway communications, the traffic is increasing and axle is becoming heavier and heavier, all of these demand the high quality of cement concrete pavement the experience of past ten years in highway construction shows that the practical life time of cement concrete pavement is far more shorter than anticipated. damages such as cracking are offen occurred in first serval years they caused direct and indirect economic losses and bad social influences. in addition to control overloaded vehicles by means of administration, the compressive strength, bending strength wear - ability should be improved to solve all these problems

    十幾年的高等公路建設實踐表明,水泥路面的使用壽命遠遠小於其設計壽命,往往在通車幾年後就出現一些病害,如坑槽、斷板等病害,帶來的直接、間接經濟損失和不良的社會影響。解決這些問題,除了用行政強制手段控制車輛外,必須提高水泥混凝土的彎拉強度、疲勞強度、耐磨強度、阻裂限縮能力,從而提高水泥混凝土路面的使用壽命。
  6. The standard in bridges " designing load in xuanhua - datong speedway is auto - super 20, trailer - 120. because of transiting carrying coal vehicle mostly, investigating and measuring all vehicles carrying coal in 109 and analyzing and checking strength and intension of new bridges. in this way, ensuring to advance loading measure of over load and assuring safely operation in bridges according to the standard in bridges " designing load

    宣大高速公路橋梁設計荷標準為汽車?20,掛? 120 ,公路建成後主要通行煤重車輛,為此對現有高速公路旁全部的109國道煤車輛進行調研、量測,並以此對新橋梁結構受力及強度進行了分析及驗算,以確定對重車輛提出發措施,保證按高速公路橋梁設計荷標準設計的橋梁能夠安全營。
分享友人