超過工作深度 的英文怎麼說

中文拼音 [chāoguògōngzuòshēn]
超過工作深度 英文
exceeding operational depth
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 超過 : exceed; outnumber; outstrip pass forereach; outclass; override; overrun; overtake; surpass
  • 深度 : 1. (深淺程度) degree of depth; depth 2. (觸及事物本質的程度) profundity; depth
  1. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚、地基沉降與固結、地基穩定性、降水、地震用下砂土液化的可能性等方面的計算分析; ( 2 )施監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程、各分級充水加載階段地基靜孔壓與層水平位移、油罐底板壓力分佈及地基土強增長等方面的實測與數據分析。
  2. While facing the challenge of the 21st century, the group will expand its annual capacity to 6, 000 tons during the 9th five - year - plan, through technical revamp and expansion ; further deepening of reform will lead to the establishment of modern enterprise system ; the enterprise will further expand through merging and acquisition ; it will issue stocks to strengthen its economic might ; promotion of economic efficiency will be the focus of the work to facilitate the basic transition of the economic system and growth mode ; to persist in technical progress to revitalise the enterprise, and set up a scientific management system fo further promote what has been achieved so as to facilitate the management standardization, adapt to market system and internationalization and make the company into a large and powerful enterprisegroup

    面對二十一世紀的挑戰, 「九五」期間,公司將通技術改造和擴建,形成6000噸年的生產規模,將進一步化改革,完成建立現代企業制的大業,通兼并擴大企業規模通發行股票增強企業經濟實力把提高經濟效益為企業的中心,實現經濟體制和經濟增長方式的根本轉變堅持科技興廠,建立科學管理體系,鞏固管理成果,使管理標準化市場化國際化把公司建設成為具有雄厚實力的大型企業集團。
  3. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    試驗研究主要得出如下認識:沖擊壓實技術處理濕陷性黃土地基時,其有效處理一般不80cm ,沖壓遍數以30遍左右為宜;對路基分層沖壓,在要求土體中各點壓實均達到規范要求時,路基沖壓最佳組合為虛鋪厚80cm 、沖壓40遍;在只要求土體平均壓實達到規范要求時,路基沖壓最佳組合為虛鋪厚80cm 、沖壓30遍;大面積施時,質量控制方法可按照在以沖壓遍數為主要控制指標的同時,要求最後10遍分計沉降量小於累計沉降量10 ;在施單位自己購置沖擊壓實機情況下,與傳統施相比較,沖擊壓實技術是一種既能節約資金又能大量縮短期的施方法。
  4. When the silicon technology comes to deep sub - micron level, the interconnect delay exceeds the gate delay ; and because of the increase of 1c work frequency, the allowable errors become smaller, and the influence of the transmission delay gets bigger, which increase the difficulty of the circuit design

    亞微米製造技術中,晶元互連線延遲門延遲,而且隨著集成電路頻率的提高,允許的時序容差變小,傳輸延遲的影響加大,設計增加。
  5. In the process of building and using the mass concrete structures, because of the effect of out - side condition and themselves, some faults will form in the structure, these faults will effect the bearing capability and endurance using nondestructive testing method to test the concrete ' s quality and diagnose its healthy, which has the significant sense in assessing the safety stability and research of the administering diseases this dissertation mostly researched the testing methods in the mass concrete structure, discussed the principles, methods, features, sphere of application of the ultrasonic testing in the mass concrete structure with faults, used dynamic fem to simulate the testing process, discussed when the concrete structure with cracks is under the effect of the pulse, how the elastic waves propagate and what are their changing feature, researched the principles of the first - arriving waves " phase when the cracks " depths are not same, obtained the relation between the inversion point and the cracks " depth, which has the direction sense in the application of projects, the second part of this dissertation is ct, which used the ultrasonic wave running through the tested - substance to get arriving - time of the ultrasonic wave, then inverse the image this dissertation drawed one ct program which can well present the different little cells " ultrasonic wave velocity profiles of the substance, thereby to diagnose the quality of the part of the tested - substance, ct has the better using foreground.

    在混凝土結構的施及使用程中,由於受其自身及外界各種因素的影響,常常會產生一些缺陷,對結構物的承載能力和耐久性造成嚴重影響,採用無損檢測技術進行質量檢測和健康診斷,這對混凝土結構開展安全、穩定性評估以及病害隱患治理研究具有重要意義。本論文主要針對大體積混凝土結構缺陷的檢測方法展開研究,重點討論了聲波法檢測混凝土結構裂縫的基本原理和方法及其特點、適用范圍,運用動力有限元數值模擬其檢測程,探討了有裂縫缺陷的混凝土結構在脈沖荷載用下彈性波的傳播及其變化特徵,研究了不同裂縫下首波相位變化規律,得出了反轉臨界點與裂縫之間的關系,這對實際程應用具有指導意義。聲波ct是一種新的無損檢測技術,它是利用聲波穿透被檢測體獲取聲波接收時間,來進行計算機反演成像的技術。
  6. Since the inception of this project in 1998, three pre - pilot holes have been completed and the main hole has reached a depth of over 3500 m

    從98年開始,已經完成3個預先導孔的鉆探,主孔鉆進已經3500米。
分享友人