超靜定方向 的英文怎麼說

中文拼音 [chāojìngdìngfāngxiàng]
超靜定方向 英文
redundant direction
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • 方向 : direction; orientation
  1. The method of wing shape optimization of space shutlle has been developed with penalty function approach in which the objective function is the mass of the wing and the constraints are the hypersonic re - entry flight cross range, lift / drag ratio, and subsonic flight lift / drag ratio, the margin of the longitudial static stability and the magnitude of the horizontal landing speed etc

    摘要介紹了在滿足高音速再入橫機動航程,高音速再入飛行時的升阻比,亞音速進場飛行時的升阻比,縱性裕度和水平著陸速度等飛行性能設計要求下,用罰函數法尋求使航天飛機機翼質量為最小的外形優化法並給出了算例。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站大型地下洞室群圍巖穩的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )家壩地下洞室群圍巖穩的安全可靠性分析:被中南勘測設計研究院應用於初步設計案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩的三維動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的動力安全穩性及溫控案提供依據。
  3. The simplified method, one time statically indeterminate plane truss, for the solution of sunflower - patterned cable dome and sunflower - patterned cantilever roof is introduced. this method is clear and convenient and the results are reliable

    提出了採用一次平面徑桁架結構,求解荷載態下葵花型索穹頂和葵花型環形挑篷內力和位移的簡捷計算法,該法力學概念明確,思路清晰,計算簡便,結果可靠。
  4. The relation between deformation of bar under normal force and node displacement is analyzed and applied to setting up compatibility equations of deformation for statically indeterminate problems

    摘要分析了軸拉壓桿件的變形與桿端結點位移之間的關系,並將其應用於拉壓問題變形協調程的建立。
  5. According to different transverse difference in temperature and lengthways difference in temperature, the paper gave the method of computing temperature effect including : 1 ) the stress ot1 caused by nonlinear difference in temperature. 2 ) the constrain stress o t2 in undetermined structures by equivalent difference in temperature. 3 ) the constrain stress ot3 caused in undetermined structures by even difference in temperature tm

    針對具有不同性質的橫溫差和縱溫差,本文分別提出了預應力結構的溫度效應的計算法,包括: 1 )非線性溫差引起的自約束應力_ ( t1 ) ; 2 )等效線性溫差引起的結構的約束太原理工大學碩士學位論文應力民3 )均勻溫差tw引起結構中的約束應力4 4 )均勻溫差tm引起梁的軸變形受到柱的側約束,與預應力筋的溫度變形之間的差異引起的預應力的變化。
分享友人