路基臨界高度 的英文怎麼說

中文拼音 [līnjiègāo]
路基臨界高度 英文
critical height of subgrade
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ動1 (靠近; 對著) be close to; face; overlook 2 (來到; 到達) be present; arrive 3 (將要; 快...
  • : 名詞1 (相交的地方; 劃分的界限) boundary 2 (一定的范圍) scope; extent 3 (按職業、工作或性別等...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 路基 : bed; roadbed; subgrade; substructure
  • 高度 : altitudeheightelevation
  1. And the deficiencies are pointed out in present researches, such as highway capacity, level - of - service, influence factor of road alignments, etc. from these, it has confirmed that the thesis should be studied from rational analysis, quantitative analysis of level - of - service, impact on capacity of road alignments, setting - up simulation model, etc. the high - accuracy gps dynamic data acquisition appearance is proposed to be used for the first time to carry on the experiment of overtaking on two - lane highways, and experiment scheme is designed according to the driver ' s perceive to judge each overtaking course. based on the experiment data, it can get two important parameters of acceptant gap ? the critical gap of overtakable time headway and returnable time headway through data processing, which can offer the strong support to the research of two - lane highway capacity with qualitative and quantitative analysis. besides, the experiment methods is provided to observe overtaking ratio and to measure the

    研究中首次提出了運用gps動態數據採集儀對雙車道公上的超車行為進行觀測,設計了根據駕駛員感受來衡量超車過程的實驗方案,並通過後期數據處理得到了超車過程中兩個重要的可接受間隙參數-可超車車頭時距和可回車車頭時距的間隙值,為定性和定量分析雙車道公通行能力提供有力的數據支持;同時,還提出了觀測超車率的實驗方法以及測量加速干擾的實驗方案,統一了計算加速干擾的時間統計間隔,為雙車道公的服務水平量化研究奠定礎;最後還簡單介紹了駕駛員問卷調查法和模擬程序中模型參數標定和驗證的數據採集方法。
  2. Compared with bst materials, especially in thin films, ps t has smaller ferroelectric critical size, lower crystallization temperature, and compatible fabrication with si micro - electronics, so it can meet the need of the high quality si - based integrate circuit ( ic ). moreover, it is important to promote the development of the miniaturization and integration for the modern devices

    與bst相比,特別作為薄膜材料, pst的鐵電尺寸較小,晶化溫較低,制備工藝與si微電子工藝兼容,更能夠滿足性能的si集成電的需要,對推動現代器件發展的小型化和集成化具有十分重要的意義。
  3. ( 2 ) study on the mechanics mechanism of the calamity caused by the cave of the highway : based on the investigation in detail along the line of the highway in shan - gan loess plateau, the distribution law, the classification and characteristic of hazard of highway cave are presented ; the calamity mechanism of highway cave opposite side slope and road bed is discussed, especially the mechanism of collapsing of the hidden cave in road bed. propose " the effect of hidden corrosion ", etc. 10 kinds send to mechanism of collapsing. based on the principle of limit balance, the formula of the critical treating thickness of hidden cave is put forward as follows : according to different stratum, different size and depth, the calculation of the critical thickness of the hidden cave of roadbed has been carried on

    ( 2 )公洞穴的致災力學機理研究:在對陜甘黃土原區公沿線黃土洞穴詳細調查礎上,研究了公洞穴分佈規律、危害分類及致災特點;公洞穴對邊坡及的致災機理,重點是暗穴致塌機理,並提出了「潛蝕效應」等十種致塌機制;利用極限平衡原理導出暗穴處理厚計算公式如下:針對不同地區不同地層,對不同尺寸和埋深的暗穴,進行了暗穴處理厚的計算。
分享友人