路軌交叉 的英文怎麼說

中文拼音 [guǐjiāochā]
路軌交叉 英文
track cross over
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1. (路軌;軌道) rail; track 2. (比喻辦法、規矩、秩序等) rut; path; course Ⅱ動詞[書面語] (遵循; 依循) follow
  • : Ⅰ動詞1 (把事物轉移給有關方面) hand over; give up; deliver 2 (到某一時辰或季節) reach (a cert...
  • : 叉動詞[方言] (擋住, 卡住) block up; jam
  1. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕系統為標準距,架空線供電之大部分低底板輕車輛,每列車以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型權,口以通號志管制,給予優先通行權。二線合計之建設成本,以89年幣值估算,約需新臺幣131億元。
  2. Points and crossovers for rail haulage roads in mines ; standard types, terminology

    礦山道運輸道的站點和點.標準類型,術語
  3. Railway applications - track - performance requirements for fastening systems - part 7 : special fastening systems for switches and crossing and check rails

    設施.道.緊固系統的性能要求.第7部分:轉轍器和護用特殊緊固系統
  4. How can the traffic control facilities at intersections be designed for an at - grade lrt in such a way that it can cope with local environmental characteristics, ensure traffic safety, and maintain smooth road traffic

    平面輕通管制設施如何設計,以配合本地通環境特性,確保行車安全,維持道行車順暢?
  5. Railway applications - track - concrete sleepers and bearers - part 4 : prestressed bearers for switches and crossings

    設施.道.混凝土枕和支座.第4部分:轉轍器和用預應力支座
  6. Railway fixed equipment. locking of points and crossing. locking dependent of driving of points crossing with sliding switch diamond

    固定設備.尖與轍的鎖定.依靠驅動帶滑動轉轍器菱形的尖與轍的鎖定
分享友人