車道線 的英文怎麼說

中文拼音 [dàoxiàn]
車道線 英文
lane line
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 車道 : (traffic) lane
  1. Widening of the grf to dual 2 - lane carriageway

    擴闊加士居天橋為雙程雙分隔
  2. The cavalcade, following the sweep of the drive, quickly turned the angle of the house, and i lost sight of it

    這隊人馬順著的彎勢很快轉過屋角,在我視中消失了。這時阿黛勒要求下樓。
  3. It had a landscaped garden and a long curved driveway in which a shiny mercedes was parked.

    它有一個草坪花園和一條很長的曲,上面停著一輛亮晶晶的默賽迪斯轎
  4. The frequency curve of transverse distribution of the wheel track on divided ways reveals that the frazzled damage of highly channelizing expressway cement concrete pavement largely occurs in the peak range of distribution curve of the wheel track

    摘要分行駛輪跡橫向分佈頻率曲顯示,渠化程度較高的高速公路水泥混凝土路面磨損破壞主要集中在行輪跡峰值范圍。
  5. Rules for installation of cabling for railway passenger car

    規則
  6. Yuhuan yunxing automobile accessories factory. locates in the south - east golden coastline of zhjiang, about 30 sea miles to wenzhou airport, 60 kilomentrs to luqiao airport and close to the national highway 104. it is quit convenient for the traffic

    玉環干江雲星汽配件廠位干浙東南沿海黃金海岸中段,離溫州機場30海里,路橋機場60公里,緊靠104國,交通十分便利。
  7. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營時間分,有:日間公交、 「 2 」字頭的早晚高峰和「 3 」字頭的夜宵;按地域范圍分,有浦西的、浦東的、過江的(含大橋、隧)和郊區;按票務方式分,有單一票價1元(全程13公里以下的路)或1 . 5元(全程超13公里的路)的無人售票(市內公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的路絕大多數是無人售票,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調和多級票價的專(有「 5 」字頭的大巴專、 「 6 」字頭的浦東專、 「 8 」字頭的中巴專和「 9 」字頭的雙層或空調大巴,還有十條空調旅遊專) 。
  8. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排水的單路橋,以連接沿該主要排水東面近輛輪候區的現有未命名路與淳裕路
  9. The design requirements were for three lanes of vehicular traffic and a single rail line in each direction.

    這個設計要求在每個方向有三條交通和一條單鐵路
  10. Aisles must be separated from production areas by yellow painted lines, and there should be evacuation arrowheads marked on the aisles

    生產間應以黃色通把生產區域與通劃分出來,通上還應標示疏散方向箭頭。
  11. As the road passes the southbound vehicle holding area, the southbound 3 - lane carriageway splits into two 2 - lane carriageways. both cars and hgvs use the at - grade road in the first stage. this opens out into a large flat apron area in front of the immigration department kiosks

    路越過南行輛停候處時,南行的三便分為兩條雙,其他輛及重型貨可使用第一階段的低層,直通入境事務處關卡前廣闊平坦的停候處。
  12. Re - alignment of existing carriageways and construction of new at - grade carriageways for the road junction ; and associated drainage, retaining wall and slope works

    為有關路口的現有行重新定,並興建新的地面行及進行相關的渠務斜坡及護土墻工程。
  13. Connections for high voltage on - board road vehicle electrical wiring harnesses - test methods and general performance requirements

    路電氣路用高壓連接.試驗方法和一般性能要求
  14. And then resume its normal routeing to improve the efficiency of bus operation

    更會改經觀塘下行然後恢復原有路,以提高巴士的運作效率。
  15. A 0. 5 - km dual three - lane carriageway within butterfly valley ; eagle s nest tunnel - a 2. 1 - km dual three - lane tunnel under the eagle s nest

    在蝴蝶谷築建一條長0 . 5公里的雙程三分隔
  16. Lai chi kok viaduct - a 1. 4 - kilometre dual three lane elevated carriageway from lai wan interchange to butterfly valley

    築建荔枝角高架路築建一條長1 . 4公里由荔灣交匯處至蝴蝶谷的雙程三分隔高架
  17. Mr lo said : the route 8 project under construction is to provide a 15km long dual three carriageway between tsing yi and sha tin. it comprises the nam wan, eagle nest and sha tin height tunnels, the stonecutters bridge and a number of viaducts and interchanges

    盧耀楨說:興建中的八號干工程,是一條連接青衣及沙田的雙程三路,全長十五公里,當中包括南灣隧尖山隧及沙田嶺隧昂船洲大橋高架和交匯處。
  18. Dc electric railcar - wire code symbol

    直流電動軌.接代碼和符號
  19. Road vehicles. ignition coils and disributors. high - voltage connections

    輛.圈和點火分配器.高壓接頭
  20. Every year on high - way, there are a large number of traffic accidents that due to driver ’ s inattention or bad - handle. lane departure is the mainly cause. the definition of lane departure is that regard the automobile as a rectangle, any one of angle contact or excess the lane that the automobile is running, we regard the automobile is in lane departure

    該方法解決了偏離預警系統啟動時因輛前方不存在車道線信息而不能很好的初始化的問題,在搜索輛前方可行區域的過程中,由於確立可行區域擺脫了對車道線的依賴,因此能夠很好地解決了變換過程中繼續跟蹤車道線的問題。
分享友人