軌道鋼 的英文怎麼說
中文拼音 [guǐdàogāng]
軌道鋼
英文
rail steel-
The above - analyzed results indicate that the composite steel - concrete structure is a better style for the magnetic levitation guideway girder
由分析結果表明,鋼?混凝土組合結構不失為一個好的軌道梁結構型式選擇方案。Widely applied for mold with multi - angle mirror polishing, electrical discharge, ball - bearing guideway surface, needle shape or roller shape bearing
廣泛用於多角度之模具鏡面拋光加工放電加工軸承鋼珠軌道面針狀或滾筒狀軸承。Long rails in jointless track are usually made on welded rail site or in railway welded rail factory
摘要無縫線路長鋼軌道常由鐵路焊軌廠或現場焊軌基地焊接。Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients
本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、橋梁、防浪堤、水庫堤壩、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。The detailed contents are as follows. through comparatively analyzing design demands in the specifications of countries in the world for the high - speed railway bridges, studying all sorts of structure types of the guideway girder adopted in some country, and summarizing the design outlines of the magnetic levitation guideway girder, the author bring forward a new - style structure of guideway girder : composite steel - concrete structure
具體研究內容有:通過分析對比世界各國高速鐵路橋梁的設計規范對高速鐵路橋梁的設計要求,研究各國各種磁懸浮試驗線路所採用的軌道梁結構型式,總結磁懸浮鐵路軌道梁的設計要點,提出了一種新型的軌道梁結構型式:鋼?混凝土組合結構軌道梁。And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency
針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。Specification for railway turnouts for private users - turnouts over which british railways locomotives operate - turnouts using bull head rails
私營鐵路道岔規范.第1部分:英國鐵路機車運行道岔.第1節:工字鋼軌道岔Specification for railway turnouts for private users - medium grade turnouts over which british railways locomotives do not operate, for axle loads not exceeding 25 tons - turnouts using bull head rail
私營鐵路道岔規范.第3部分:英國鐵路機車不運行的軸負荷不超過25噸的中型道岔.第1節:工字鋼軌道岔Stainless steel watch case with clear crystal pav polar bear tracks ; mother - of - pearl dial ; strap in off - white fur and silver - coloured leather trimming
不銹鋼表殼與清楚水晶鋪北極熊軌道;珍珠母撥號盤;皮帶在米色毛皮和銀被上色的皮革飾物。The shenzhen rainbow bridge is near to the northern railway station, which has big cut bag to span over twenty - nine tracks. arch bridge structure, which has a widely application these years, is taken considering of the bridge height limitation and the site used in downtown. the girder of the bridge is constructed with composite structure of steel and folding concrete slab
深圳市彩虹大橋地處深圳火車北站,需跨越29股火車軌道,跨徑大,又處於市中心,對橋梁的梁高有所限制,經研究分析,採用近年來廣泛應用的鋼管混凝土拱橋橋型,梁體採用鋼- -混凝土疊合板組合梁組合結構。This paper discusses aluminium heat welding principle, the application of aluminium heat welding technology in welding crane rails and infect of long rail temperature stress on buildings
摘要介紹了鋁熱焊原理及其焊長鋼軌技術在焊接起重機軌道中的應用,並對長鋼軌溫度應力對建築物的影響進行了深入分析。Recently, train is running faster and faster, and considering the stability and security, seamless welded rails ( swr ) are used as the train orbits gradually. the temperature of the rails will vary with weather. so that the rails may release the energy due to the metal characteristic of expanding or contracting with temperature, there is some badly distortion in the swr, worsly occurring accidents on expanding orbits. the portrait thermal stress ( pts ) of the swr should be monitored in some parts regularly, as to avoid such accident
近年來,隨著火車的提速造成的穩定和安全問題,軌道逐步轉為採用無縫焊接鋼軌,隨著鋼軌溫度的變化,無縫鋼軌可能會因為熱脹或冷縮的金屬特性並且在扣件阻力小而且路基較差的路段釋放能量,可能會發生鋼軌嚴重變形,更甚者會發生脹軌跑道等嚴重鐵道事故,為了避免發生如此事故,有必要定期對鋼軌的溫度應力進行檢測。Specification for railway turnouts for private users - turnouts over which british railways locomotives operate - turnouts using flat bottom rail
私營鐵路道岔規范.第1部分:英國鐵路機車運行道岔.第2節:平底鋼軌道岔Through theoretical calculation it gets the sizes required to make this device effective, proves this device can trig the cable car at any place of the railway when the tow steel wire ruptures suddenly provided that the desirable sizes are meted. it also calculates the trigging displacement, acceleration and time
通過理論計算,得出了該套安全保護裝置合理的尺寸要求,證明了在牽引鋼絲繩發生突然斷裂時,該套安全保護裝置確實能將纜車系統制動在運行軌道的任何位置,並計算出了制動位移,制動加速度和時間。Using vogel ' s wear index as the rail side wear index, the paper analyzes the side wear variations of rail head when the parameters in the wheel / rail system vary, analyzes the influences of track irregularity on rail uneven wear on gauge corner emphatically. this paper analyzes the rail side wear dates measured by track division of shan hai guan since 1990, then gains the relationship between side wear and traffic volume and sums up the characteristics and regularities in the formation and development of side wear. in the end, some measures for regarding the side wear on curves are put forward
從輪軌摩擦、輪軌接觸幾何關系、輪軌接觸應力和輪軌蠕滑等方面對鋼軌側面磨耗機理進行了探討,從軌道幾何參數、機車車輛運營條件等方面對鋼軌側面磨耗的影響因素進行了重點分析和總結;應用輪軌系統動力學,建立了輪軌空間耦合振動時變模型,採用vogel側磨指數作為鋼軌側磨指標,系統分析了輪軌參數變化的情況下,軌頭側面磨耗的變化規律,重點分析了軌道不平順對鋼軌不均勻側磨的影響;對山海關工務段1990年以後現場測得的曲線鋼軌側磨數據進行了分析,通過擬合得到了鋼軌側磨量與運量的關系曲線,並總結了曲線上股鋼軌側面磨耗的特徵和發生、發展規律;最後提出了一些減緩曲線鋼軌側面磨耗的措施。Bushes for rail vehicles ; press - fit bushes of steel
軌道車輛用軸套.鋼制壓配合軸套Standard specification for steel track spikes
鋼軌道釘標準規范According to the engineering experiences obtained from the laying of a jointless track of high - speed communication line - line 3 in dalian city, this paper introduces in general the laying technology, particularly the long rail welding, the construction site welding, seamless track spreading and trak controller laying, and discusses problems often occuring in long rail wedling and seamless track laying
摘要根據大連市快速軌道交通3號線一次性鋪設碎石道床無縫線路的工程實踐,介紹了長鋼軌基地焊接、單元軌節的工地焊接;無縫線路鎖定和鋼軌伸縮調節器的鋪設等技術,並對長鋼軌焊接和無縫線路鋪設中應注意的問題進行了探討。Thirdly, in term of the results of testing and calculation, the displacement and libration, the difference of altitude, the flexibility and strain of crane - beams are all generally analysed, especially the reason why the crane - beams are attaint is lucubrated, and the reasons why the trigging pole is ruptured, the upper wingspan is damaged, the orbital movement, the exceptional incline of colums are open out, which has instructional significances that improve the design of the steel frame of the coke made by dry flameout
第三,根據檢測和計算結果,對鋼框架的位移和振動、框架高差、吊車梁撓度和應變等進行了全面的分析,特別對吊車梁系統的損傷原因進行了深入分析,揭示了制動桿件斷裂、上翼緣磨損、軌道竄動、柱異常傾斜等一系列損傷現象的原因,對于改進干熄焦鋼框架的設計有著直接的指導意義。Railway applications - track - rail - check rails
鐵路設施.軌道.鋼軌.護輪分享友人