載荷壓頭 的英文怎麼說

中文拼音 [zǎitóu]
載荷壓頭 英文
load head
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • : 壓構詞成分。
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承力問題進行了實用化的探討,提出了考慮地基變形的地基承力上程計算方法;對基於彈塑性理論分析的地基承力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承力界限p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截錐模型模擬地基,對地基(巖基)承力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承力的確定問題,從巖石室內單軸抗強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤試驗四方面進行了深入討論;本文作者根據多年現場試驗的工程實踐,對深井試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加系統,該加系統具有實用、簡便、穩定及安個等優點。
  2. The hydrodynamic propulsor takes drill fluid as power source, with the aid of the axial load produced by the pressure drop of the bit nozzle, makes the axial force act on the bit to produce wob, making up for the insufficient wob, ensuring the bit feeding smoothly and improving the penetration rate

    這種推進器以鉆井液為動力源,藉助鉆噴嘴降產生的軸向,使軸向力直接作用於鉆產生鉆,彌補有效鉆不足,保證鉆平穩鉆進,提高機械鉆速。
  3. ( 8 ) as for the runnel which is located at a karst zone with a high water level, external water load is the main one, and rock pressure is secondary

    門)在巖溶富水區隧道地下水水較大時,外水是襯砌結構的主要,圍巖力相對來說是次要
  4. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構變化的規律; (二)通過單柱承力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承力、極限變形等參量; (三)通過柱架低周反復試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承力和極限變形、及榫卯減振參數; (四)通過斗?低周反復試驗和受試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗極限承力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  5. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震分佈均勻一些。
  6. The fastened end of bar was machined to multi cone - shaped heads. through the cone heads compress the inorganic anchoring material, the load was transmitted from bars to base material. it changes the transfer path of loads and takes advantage of high compress strength of inorganic material, thus enhanced the anchor intensity of inorganically post - installed bars

    本文提出一種新型的植筋技術? ?帶錐無機植筋,它把鋼筋錨固端加工成多個錐,通過錐對無機錨固材料的擠,將傳遞給基材,使基材與無機錨固材料的界面上產生剪復合應力狀態,改變傳統植筋的受力機理,利用了無機錨固材料抗強度高的特點,從而提高了無機植筋的錨固強度。
  7. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的下筒體一封連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封連接結構不可能發生韌窩型斷裂; ( 2 )在工作力下進行次數不多的反復加、卸,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮力容器製造過程中水試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的為92石3mpa ,封完全屈服時為86
  8. Abstract : the paper describes the application of vacuum preloading in combination with surcharge preloading to improve soft soils for la rge working load in the storage area of phase of nanjiang coal terminal of ti anjin port. analysis is made on the result of the improvement and it is concluded that the technique of vacuum proloading in combination with surcharge preloadin g can be used to improve soft soils for large working load and the result can be remarkable

    文摘:本文介紹了大使用條件下真空聯合堆技術在天津港南疆煤碼堆場(二期)軟基加固工程中的應用情況,並對加固效果進行了詳細分析,得出了大使用條件下可採用真空聯合堆加固軟基且加固效果明顯的結論。
  9. The transient cfd simulation including the spiral case, stay vane, guide vane, runner vane and draft tube at different operation points is studied fitly, then the result of the pressure distribution on runner blade is provided for the runner transient structural simulation by fluid - structure interaction ( fsi ) method

    文中首先對高水小負的渦帶工況下混流式水輪機內流場進行非定常cfd計算,得到渦帶工況下葉片表面不同時刻的水,並利用流固耦合方法對轉輪進行結構場瞬態特性計算,分析轉輪葉片的動應力特性。
  10. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空損耗負損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負較大的地區,適用於高層建築機場車站碼地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  11. Aerospace ; rivet design values static load, for countersunk rivet joints, single shear, dimpled ; rivet material 2. 4360

    航空航天.單剪切花沉鉚釘連接用靜鉚釘設計值
  12. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水力問題,進一步分析和研究了襯砌水及外水力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水分佈進行了數值模擬,並對其外水力進行了分析和研究,提出了滲流控制的具體措施。
  13. Abstract : according to the deep analysis of the typical punching process, the loading charts and the amplitude - frequency curves of straight side cnc turret press frame are obtained. in the end the dynamic response of a typical process is calculated using modal superposition method by fem software marc and the static and dynamic stress of some nodes is compared as well

    文摘:根據板料沖裁時的工作負圖確定了數控回轉力機的動譜,並通過傅立葉展開,獲得了力機的幅頻譜,最後通過marc軟體採用模態疊加法計算了典型沖裁時機身的動態響應,分析了其動態特性,並對特徵點的動靜態應力進行了比較。
  14. The result of nanoscratching modeling showed that the load on the sample and friction force increased linearly at the initial stage. the load on the sample and the friction force increased suddenly when the film hardened

    納米劃痕實驗的數值模擬表明, ti - dlc膜在劃痕初始階段,縱向和摩擦力都呈線性緩慢增加,在某一點發生突變,這時膜發生了硬化。
  15. Tools for pressing - ball - lock punch retainers - part 3 : type e, reduced for heavy duty

    工具.球鎖緊沖固定板.第3部分:用於重的減徑e型固定板
  16. Tools for pressing - ball - lock punch retainers - part 3 : type e, reduced for heavy duty iso 11900 - 3 : 2004

    工具.球鎖緊沖固定板.第3部分:用於重的減
  17. Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased

    由於預先預測出無功負,提前了解了無功功率變化的趨勢,可以有助於判定低母線電變化是由無功負變化引起還是由高側電變化引起,從而適時決定是調有調器分接還是投切電容器,以此避免了盲目和不充分的調節,實現在保證無功基本平衡和電合格率的前提下,減少有調器分接的調節和並聯電容器組的投切次數。
  18. This paper mainly discusses a control method of substation voltage and reactive power. in order to get suitable decision for one day 24 hours tap - transformer ' s step switch and shunt capacitor switch, an approach of substation voltage and reactive power control on the basis of the combination of artificial neural network ( ann ) reactive power forecasting and evolutionary programming optimal decision - making is put forward

    論文主要研究變電站的電/無功控制決策問題,為了確定一天24小時內合適的有調器分接位置和並聯電容器投切狀態,提出一種基於人工神經網路的無功負預測和進化規劃優化決策相結合的變電站電和無功的綜合控制決策。
  19. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種負條件下確保電合格和無功基本平衡,且能滿足變電站對有調器分接日調節次數和並聯補償電容器組的日投切次數的限制。通過考慮不同負時段對無功功率的需求和負突變情況下的控制要求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同負時段對電和無功的要求、抑制電或無功突變情況下的誤動作,且有效地減少了有調器分接和並聯補償電容器組的調節次數。最後基於變電站scada系統設計了一后臺電無功綜合控制軟體模塊。
  20. Thereby, this paper has carried through an in - depth study on wear mechanism between tool joint of drill pipe and casing, problems caused by wear and measures to deal with wear based on researches at home and abroad. the research contents include : in order to reveal mechanism of wear occurred between tool joint and casing, distribution of the contact pressure between the tool joint and casing for different loads was obtained with finite element method. furthermore, the mathematical model of maximum contact pressure and the wear depth on casing was established

    所以,本文在國內外研究的基礎上,對鉆桿與套管摩擦磨損的機理、引發的系列問題及其預防措施進行了深入研究,研究內容主要包括:為探討鉆桿接與套管摩擦磨損的機理,採用有限元法研究了不同下接與套管之間接觸力的分佈規律,並建立了最大接觸力與磨損量的數學模型。
分享友人