載重量曲線 的英文怎麼說

中文拼音 [zǎizhòngliángxiàn]
載重量曲線 英文
deadweight plan
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 曲名詞1 (一種韻文形式) qu a type of verse for singing which emerged in the southern song and ji...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 載重量 : bearing value
  • 載重 : load; carrying capacity
  • 曲線 : [數學] curve; bight; bought; profile; net曲線板 french curve; irregular curve; curve board; splin...
  1. Recently, with the development of railage, passenger transport, freight and the density of train have increased mostly. it results in rail - wear day after day, especially the side rail - wear. so the ministry of railway has been taking the situation of rail into account greatly to insure train and rail safely

    近年來隨著鐵路運輸的大力發展,客貨運和行車密度大幅度增長,從而導致鋼軌磨耗日益嚴,尤其是鋼軌的側面磨耗急劇上升,因此鐵路工務部門十分視對鋼軌傷損情況的檢測,以確保行車的平穩性和安全性。
  2. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加裝置、測儀器安放、測點的布置等;給出加方式及測出的m -;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  3. Quantum capture is a complicated process and capture time computation and experiment test are provided. it is difficult to ascertain carrier ' s transportation and distribution in multiply quantum wels and tunneling time and heating emitting time computations are also provided. optical gain whose formula is complicated is a critical parameter and it is useful for structuring model to obtain a concise formula by means of experiment curve

    詳細說明了確定半導體激光器速率方程的一些要參的方法,如:流子在三維sch區的輸運行為對激光器的調制特性有較大影響;子阱對流子的捕獲是一個復雜的過程,文中給出了子捕獲時間的計算方法以及實驗證明;多子阱中流子輸運與分佈也是相當復雜的問題,文中給出了隧穿時間與熱發射時間的計算方法;光增益是關鍵的參,它的解析式相當繁瑣,由實驗擬合其較為簡明的經驗式,對定模工作是有利的。
  4. This paper researches basic principle of microwave digital phase shifter deeply, reviews different theories of all kinds of microwave digital phase shifter circuit, analyzes loaded - line phase shifter in detail and draws design curves according to formulas. and this paper presents a novel method, which makes use of modeling simulation that software - ansoft serenade 8. 7 provides to evaluate parameter values of pin diodes through s parameter measurement. then, a kind of 6 - bit digital phase shifter circuit is designed and simulated through software - ansoft serenade 8. 7

    本文對微波數字式移相器的基本理論進行了較深入的研究;綜述了各種微波數字式移相器電路的工作原理,著對加式移相器電路進行了理論分析,並根據計算公式作出一系列相應設計;提出利用軟體ansoftserenade8 . 7所提供的測數據擬合功能,通過測s參數來確定pin二極體等效電路參數的新穎實驗方法;利用微波電路設計軟體ansoftserenade8 . 7對6位數字式移相器電路進行模擬、優化設計,做出樣品,並對其性能測試分析,對研製微波數字式移相器具有要的參考意義。
  5. First super - low specific - speed centrifugal pump has a long and narrow flow passage for its high head and low capacity, and the power absorbed by disc friction is too high, so the efficiency is very low ; secondly the diffusion of flow passage is so high, that the reserved flow often emerges at the inlet and outlet of impeller. therefore the h ~ q characteristic curve is often hump - shaped, and at the low - capacity operating condition the instability often occurs ; thirdly the centrifugal pump at high - capacity operating condition is easy to overload because the n ~ q curve appears a rising trend

    首先由於它的揚程較高、流較小,所以它的流道狹長,圓盤摩擦損失較大,效率相對較低;其次由於它的流道擴散較嚴,易在葉片進口產生迴流和在出口產生脫流,揚程流特性易出現駝峰,在小流工況下易產生不穩定現象;第三,由於其功率流呈現上升趨勢,在大流區運行時電機易過
  6. In the paper, the load incremental method is adopted. by the way of reducing the elastic model of the destructive blocks in the elements, the finite element analysis model is revised and the repeated computing process does n ' t finish until the results are converged. the proposed method can simulate the entire process of concrete structures from crack to complete damage

    分析中採用荷增法,對各級荷下單元中破壞的材料分塊進行彈模折減處理,並新生成單元剛度矩陣,經過多次迭代直至計算收斂,從而可以給出各類cfrp加固混凝土結構的荷?變形全過程,並預測其極限承力。
  7. In view of load transferring capability of rock - socketed piles, this paper compares rock - socketed piles with non - rock - socketed piles, analyzes influencing factors ( pilelengtru pile diameter pilemodulusx character of bearing stratuiru mud hull sediment of pile bottom and roughness ) on force character. with different load transferring functions, a set of analytical equation for single pile settlement calculation of rock - socketed piles are established : three stages of p - s curve from analytical equation are gained which are straight linex curve x straight line ; and relationship curves in different pile modulus and in different rock - socketed length

    根據所選用的不同的荷傳遞函數,導出了嵌巖樁單樁沉降計算的一種解析演算法,分析得出嵌巖樁p ? s按荷變化分為直??直段三個階段,不同樁身模下承力的變化,樁身模、樁端巖石強度是影響單樁承力的要因素,不同嵌巖深度下端阻比的變化
  8. Finally, the paper provides the theoretic method suitable for calculating the tensioning elongation of the tendons, and checks the method as well by measurement data from several engineering projects

    同時,分析了預應力束的束效應引起的鋼絞新排列,以及彎段等效徑向荷產生的徑向位移,最後得出了適合小率半徑預應力束張拉延伸計算的理論方法,並通過多個工程實測數據進行校驗。
分享友人