輸水渠 的英文怎麼說

中文拼音 [shūshuǐ]
輸水渠 英文
carrier drain
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  1. As their name implies, dry weather flow interceptors function to intercept polluted effluent flow and divert it to sewers and thence to treatment plants

    顧名思義,該設備可阻截染污河使其流至污,繼而往污處理廠。
  2. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的段為陸渾灌區東一乾最為嚴重的段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析流特徵,建立東一乾狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。
  3. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引道,可連接塘隧道的亞賓尼濾池及配庫,該引道用石及磚砌成,每天可700萬加侖; (三)位於亞賓尼東部的六個過濾池,該濾系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖,原過濾后,經一條直徑18寸鐵管,流入花園道與寶雲道交界的配庫。
  4. Fung kong tsuen road water - main drainage works underway

    鳳降村路-管及務工程進行中
  5. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    黃石?電站輸水渠道地處地質結構比較復雜的地方,由於道建成投運的時間較早,且原設計的標準較低,糙率較大.在電站機組已更新改造的情況下,若不進行輸水渠道挖潛改造,已難于滿足電站機組的設計流量要求.經反復比較,決定採取減小道糙率的方案,對輸水渠道進行三面光護面加固防滲,增加過流,效果很好
  6. The synthetic experimentation of testing and calculating design depth in conveyance canal combine the knowledge of irrigation and drainage engineering and hydraulics. during the experimentation, through experiment data testing, analysis, calculating and watching canal model, making students understand further the principle of design, which has mutual promoting effect on theory teaching in class

    輸水渠道橫斷面設計深測試及計算實驗結合「灌溉排工程學」及「力學」等學科的知識,在實驗過程中,通過對實驗數據的測試、分析及計算和道模型實物的觀摩,加深了對道設計原理的理解,與課堂上的理論教學起到了良好的互動作用。
  7. Based on optimization theories of genetic algorithms and the linear programming, a series of optimal design mathematics models and methods of water transmission conduits and water distribution networks have been presented, in the light of their characteristics. the results are as follows : 1 the linear programming models and calculations of the pressure gravity conduit, the gravity pressure conduit and channel, the pressure conduit with pump station and the pressure conduit in considering pump station flow variations are presented respectively

    本文針對不同類型的管線和配管網系統的特點,應用遺傳演算法和線性規劃等優化設計理論和方法,對其優化設計問題進行了較為系統的研究,成果如下: 1分別建立了重力管道系統、重力系統、泵站加壓管道系統以及考慮流量變化的泵站加壓管道系統優化設計的線性規劃數學模型,並提出了計算方法。
  8. In the canal with sand moving balance and stable bed, may keep the current status ; for the sediment canal which seriously reduced discharge, may properly clean sediment ; for the seriously scoured canal, such as curved canal, should lining the canal

    對于沙達到平衡、河床比較穩定又達到能力的段,可保持現狀;對淤積比較嚴重又影響能力的局部道,可進行適當疏浚清淤;對淘刷比較嚴重的彎道凹岸進行工程護砌。
  9. E associated works including at - grade roads, drainage, sewers, watermains, slope stabilization and protection works, traffic aids, street lighting, electrical and mechanical works, traffic control and surveillance system works, fire services main, irrigation system, hard and soft landscaping, fire hydrants and emergency crossing

    進行相關的地面道路排及污管斜坡鞏固護坡電氣及機械園景建築及種植花木緊急過路處工程設置輔助交通設備交通管制及監察系統裝設街道照明設備安裝消防管街井頭灌溉系統。
  10. Optimization of water head allocation for large - scale water diversion project

    大型調工程乾力優化分配
  11. Conveyance loss of water in channel

    損失
  12. The water seepage from canal systems was one of the major factors in the analysis of water supply - demand balance. through the analysis of the monitoring data on water delivery in the canal systems, a generalized model of water loss at a unit length of canal and a mathematic model of canal percolation replenishment to the moving table of underground water were recommended

    系滲漏是供需平衡分析過程中的一個主要因素,通過對測試資料的分析研究,本文提出了單位長度損失量的概化模型和變動位條件下系滲漏補給量的數學計算模型。
  13. The seepage prevention technology in complex channels is a new form of anti - leakage technology for channels through many years ' practice, which has played a tremendous role in agricultural irrigation

    摘要復合式道防滲技術是近年來在其它防滲道技術的基礎上,經過多年工程實現及研究和開發,形成的一種新型道防滲技術,並在農業灌溉中發揮了巨大作用。
  14. Uplift reduction by drainage is an important technology for ensuring large - sized channel lining works, especially in preventing damage of uplift in high groundwater level to lining body during the non - conveyance period

    摘要大型道襯砌中的排減揚壓技術是確保道襯砌施工的一項重要技術,對于防止非期特別是汛期高地下位對襯砌體的揚壓破壞具有重要作用。
  15. When the pump machines pass the short distance pipeline, the water in trail pipeline goes to exoteric dyke. the variety of pressure is little and sometimes forms non - pressure status

    在通過泵機組出口壓送后,僅經過短距離管道后,在管道尾部敞開奔向開放式明
  16. Although the canal conduit capacity does not change very much than design discharge, the canal erosion due to many years scour already damaged the canal stability. therefore, taking efficient measures should protect the canal

    然而對于北部引嫩道來說,盡管大部分道在設計流量下能力並沒有什麼明顯的損失,但道的橫向坍塌拓寬已危及堤岸的安全,應及時採取防治措施加以治理。
  17. Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value

    經過三十年的運行,目前乾工程存在嚴重的能力低問題,其中東一乾能力只能達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到而旱死莊稼的情況,造成上下游用矛盾突出,而且灌溉期乾過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。
  18. We analyze the main cause of the backwater of the canal, and put up rectifying and reforming measures, so as to raise the discharge benefit

    然後分析道壅的主要原因,並提出整改措施,以提高灌區的效益為目標。
  19. This paper based on the goal of establish properly water saving model, taking economic benefits, environmental benefits and technical feasibility indexes as norm, using analytic hierarchy process to compare the canal seepage control, water conveyance pipe, sprinkler irrigation and microspray irrigation the 4 project technologies of water saving, in order to choose the suitable water saving model

    以建立適宜節灌溉工程體系為目標,以經濟效益、環境效益、技術可行性3項指標為準則,採用層次分析法對道防滲、管道、噴灌、微灌4項工程節技術進行比選,最後選出適合河北省實際情況的節灌溉技術。
  20. Water - supply resource of the middle route project is the dan jiang kou reservoir. arterial channel is used as water conveyance structure through the provinces of hubei, henan and hebei to beijing and tianjing cities

    中線工程是指:近期以丹江口庫作為源,以總乾自流引,經湖北、河南、河北,並最終至北京、天津。
分享友人