輸水率 的英文怎麼說
中文拼音 [shūshuǐlǜ]
輸水率
英文
volume-
Gilbert speculates that the reason for this increase of transport rate is the reduction of friction losses by the presence of fine suspended material in the flow.
吉爾勃特認為輸沙率增加的理由,是水流中存在的細懸移泥沙將減少阻力損失。The theory of minimum entropy production or minimum rate of energy dissipation shows that a river is stable when it is in a relative equilibrium condition. ( 3 ) the river facies formulas of alluvial river have been developed using the theory of minimum rate of energy dissipation together with flow continuity and motion equations, suspended load transport or bed load transport equation. ( 4 ) the causes of the river patterns are explained using the theory of minimum rate of energy dissipation
( 3 )基於最小能耗率原理,以水流能耗率作為目標函數,以水流連續方程、水流運動方程及懸移質挾沙力公式或推移質輸沙率公式作為約束條件,通過對目標函數求條件極值,分別推導出以懸移質造床為主的顯式河相關系式和以推移質造床為主的顯式河相關系式。However, according to ann ' s theory, making use of visual basic development tool, friendly - interface single output three layers " artificial neural network generator base on improved bp algorithm has been developed by the author, and after constructing the model, the value of d _ ( cmax ), finally the gross bed - load transport rate of non - uniform sediment with a wide distribution in flume experiment of stead sediment transportation have been forecasted
筆者採用的途徑則是根據人工神經網路理論,利用vb開發出界面友好、基於改進bp演算法的多輸入單輸出三層神經網路生成器軟體,並採用該生成器建模,對平衡輸沙狀態下的水槽輸沙試驗的d _ ( cmax )和總輸沙率進行預測計算。This paper analyses the factors that influence efficiency of pipeline system for sprinkler irri - gation, under condition of changing existing low pressture pipeline irrigation system into sprinkler irri - gation system
就井灌區低壓管道輸水灌溉工程改造成噴灌工程后,對影響噴灌管路系統效率的因素進行了分析,給出了其管路系統效率的計算公式。Abstract : this paper analyses the factors that influence efficiency of pipeline system for sprinkler irri - gation, under condition of changing existing low pressture pipeline irrigation system into sprinkler irri - gation system
文摘:就井灌區低壓管道輸水灌溉工程改造成噴灌工程后,對影響噴灌管路系統效率的因素進行了分析,給出了其管路系統效率的計算公式。In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel
本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。In the process of threshing, the significance of factors, which influence threshing performance, not only include some certain factors such as feed quantity, cylinder rotary speed, distance between cylinder and concave, thresher concave radian but also include some uncertain factors such as the crop ' s variety, water content and the proportion of cereal straw. for this reason, the seed - husking plant is system with a character of uncertain, multi - input - output and complex nonlinear
脫粒裝置的工作過程極為復雜,影響脫粒性能的因素很多,除了喂入量、滾筒轉速、凹板長度與入口間隙等確定性因素外,還有作物品種、作物含水率以及穀草比等一些不確定性因素,因此脫粒裝置是一個具有不確定性、多輸入多輸出的復雜非線性系統。Reducing of water loss in the process of transporting, field allotting and absorbing by plants plays key role in water - saving technologies
減少輸水、田間配水及作物利用過程中的水分無效損失,最大限度地提高水分利用率和水分生產效率,是節水技術的核心。The application study of improved bp algorithm in sediment science - using two set of experiment data mentioned above, the value of d _ ( cmax ) and gross bed - load transport rate in non - uniform sediment with a wide distribution in flume experiment of stead sediment transportation have been forecasted by ann generator
改進bp演算法在泥沙科學中的應用研究?將收集整理后的兩次水槽試驗實測資料作為數據來源,利用生成器生成網路對水槽平衡輸沙試驗中的最大起動粒徑和總輸沙率進行預測。The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction
黃石?水電站輸水渠道地處地質結構比較復雜的地方,由於渠道建成投運的時間較早,且原設計的標準較低,糙率較大.在電站機組已更新改造的情況下,若不進行輸水渠道挖潛改造,已難于滿足電站機組的設計流量要求.經反復比較,決定採取減小渠道糙率的方案,對輸水渠道進行三面光護面加固防滲,增加過流,效果很好Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed
文摘:採用正交曲線坐標系下的河道平面二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流位置、水面高程及比降的變化規律,預測了采砂方案完成後卵石推移質輸沙率變化及其對航道的影響,並對格形開挖和平整開挖方案進行了比較分析Aiming at the present low efficiency of well irrigation works and through pumping tests and theoretical analysis, the paper derives a method for calculating the optimum water yield, the best lifting distance and economic pipe diameter of low pressure pipe delivery system of irrigated area by wells, increasing the efficiency of motor - pumped wells
針對目前井灌工程效率低下的問題,通過抽水試驗,經過理論分析,推導出了井灌低壓管道輸水灌溉系統的最優出水量、最佳揚程和經濟管徑計算方法,從而可提高機井灌溉效率。Finally the formula of unit sediment rate of density flow in xiaolangdi reservoir has been pointed out and the data of other reservoirs has been verified
最後,給出了小浪底水庫異重流單寬輸沙率公式,並得到其它水庫資料驗證。This article takes hanging off and wide fluctuation of transmition velocity of adsl as example, then analysis centers on the discerte multiple tone and the principle of channel load assignation. from analysis above article points out the root of adsl being sensible of noise signal. at last, reserches effects that window function and barrier effect on frequency and adopts fft to work out the noise power of adsl
本文以電信現在推出的adsl傳輸中鏈路經常掉線和傳輸速率經常大范圍波動為例,重點分析了adsl所使用的dmt調制方式和注水演算法分配通道載荷方式原理,由此指出adsl對噪聲信號敏感的根源,在得到問題的根源之後,分析了窗函數和柵欄效應對頻譜的影響,採用fft方法計算adsl線路的噪聲功率譜,為adsl線路測試提供了可靠的理論依據。Ann is a adaptive and non - linear dynamic system made from superposition of many simple components which we call neuron. the question for computation of d _ ( cmax ) belongs to incipient motion of sediment in essence, which is the same question with two different sides, because computation of critical condition ( including critical velocity critical shear stress critical power ) for a grain size under a bed - load condition is equal to computation of a grain size during incipient motion under the bed - load condition and the water flow condition given before. and computation of gross bed - load transport rate has great relationship with standard of incipient motion
對于d _ ( cmax )的推求,在本質上還是泥沙的起動問題,因為尋求某種床沙條件下某級泥沙的起動條件(如起動流速、起動切應力、起動功率)和尋求某種水流和床沙條件下的起動粒徑是同一問題的兩個方面而已;而對于推移質總輸沙率推求也和泥沙起動問題中的起動標準選擇緊密相關。Suspended sediment has three transport modes, and the relationship between tidal discharge and sediment discharge is also studied
懸沙運動模式與水流基本一致,也存在三種不同形式的懸沙環流輸移模式,並分析了潮流量與輸沙率之間的關系。Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value
經過三十年的輸水運行,目前乾渠工程存在嚴重的輸水能力低問題,其中東一乾渠輸水能力只能達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到水而旱死莊稼的情況,造成上下游用水矛盾突出,而且灌溉期乾渠過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。The measured data show that the bedload sediment transport rate is related more closely to the effective stream power within the bed - surface layer than to the river stream power
實測資料表明,推移質輸沙率與床面層內有效水流功率有良好的相關性,且高於推移質輸沙率與水流功率的相關性。Based on the relationship between energy and flow within the bed - surface layer, a relationship between the bedload sediment transport rate and effective stream power within the bed - surface layer is derived
摘要基於床面層內的水流能量關系,推導了推移質輸沙率與床面層內有效水流功率的關系式。Based on 9 years ' field data of bed - load transport and the corresponding hydraulic parameters at the erwangmiao hydrology station on dujiangyan river, 6 formulae for the prediction of the sediment transport are analyzed
摘要以都江堰二王廟水文站9年實測的卵石推移質輸沙率資料和對應的水力參數為基礎,選用6個有代表性的公式進行了分析計算和對比。分享友人