輸水系統 的英文怎麼說

中文拼音 [shūshuǐtǒng]
輸水系統 英文
conduit system
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. Water samples are taken regularly throughout the entire supply and distribution system. the sampling points include water treatment works, service reservoirs, trunk mains, connection points and domestic taps. the data from these samples are checked against the world health organization s guidelines for drinking - water quality, which were developed by experts from around the world

    在整個供輸水系統中,有關人員經常從濾廠、配庫、干管、供接駁位置和用戶頭抽取樣本進行化驗,鑒定化驗數據所顯示的質是否符合世界?生組織所訂定的飲用食質準則。
  2. The proposed 1200 mm diameter cross - harbour main is to provide a new cross - harbour pipeline on the western part of the harbour to enhance supplies and maintain the reliability of cross - harbour water transfer to hong kong island

    建議的直徑1200毫米跨海管,為海港西部提供一條新的跨海管道,以增加供量,以及為供予香港島維持一個可靠的跨海輸水系統
  3. Later, the high island reservoir was also connected with the plover cove reservoir

    船灣淡湖的存,亦可透過輸水系統,引至萬宜庫。
  4. The transient simulation of power system uses usually simplified models of conduit system and hydro turbine. similarly the simplified models of synchronous generator and power system are used in transient simulation of hydraulic system

    電力模擬往往採用粗略的輸水系統?輪機模型,而模擬則往往採用粗略的同步電機?電力模型。
  5. Second, this paper expounded the analysis of the universal model by means of the opengl 3d graphics standard. the whole model of a real hydropower station was also provided by this system

    其次,本文重點闡述了應用opengl三維圖形標準進行通用模型構建模塊的分析設計,並給出了由本繪制的真實電站輸水系統的整體工模型圖。
  6. Water requirement forecast for rice from well irrigation on the basis of time series analysis method

    基於井灌區管道輸水系統的波涌灌技術
  7. In addition, 2 inter - connected storage tanks - one in bonham road and one in robinson road - were to be built. this water supply scheme also included the building of 30 small sized fountains and 125 fire hydrants

    草擬計劃包括一個塘(容量達3 , 000萬加侖) 、一條引管、儲池,以及連接儲池的輸水系統,並設立30個供點和125個滅火龍頭。
  8. Application research of gis were done in data display, flow analysis at inlet and outlet and information search about filling and emptying system and so on. first, edit, browse or search can be completed at the same time when the related figure is displayed. second, database which involves attribute data and space data about filling and emptying system can be created so as to do some search between figure and its attribute data

    在船閘引航道信息顯示與流分析和輸水系統信息查詢分析等方面進行了gis技術應用研究: ( 1 )使圖形與信息結合,在圖形顯示的同時,對船閘基本信息及引航道信息或輸水系統信息進行編輯、瀏覽與查詢; ( 2 )建立輸水系統屬性數據庫,便於圖形?數據互動式查詢; ( 3 )在數學模型計算分析的基礎上,將研究成果可視化。
  9. Design code for filling and emptying system of shiplocks

    船閘輸水系統設計規范
  10. Since 1996, a total of hk 467 million has been approved by the government for slope stabilization, and investigation and repair of buried water - carrying services at the university. dr. hung remarked, the committee was very efficient and effective

    過去十年,政府劃撥了四億六千七百萬元專款予中大,用以修葺斜坡和調查並維修藏於地下的輸水系統
  11. In order to resolve the question, in the thesis a simulation arithmetic of hydro - electrical system is put up. the equations of hydro - electrical system are divided to two parts, one of which consists of the differential equations of conduit system, hydro turbine and generator ' s rotator and is solved by characteristic equation arithmetic, the other of which consists of the differential equations of generator, magnetic system and grid and is solved by longge - kuta arithmetic or covert integrated arithmetic. through the alternative solving of the two parts, the simulation results of the large - disturbance transient could be abstained eventually

    為解決這一問題,本文提出了一種將和電力方程交替求解的聯合模擬演算法,即將包括輸水系統輪機以及機組轉子等部分的差分方程作為一部分,將包括同步發電機、勵磁以及電網等部分的電力微分方程或差分方程作為另一鄭州大學工學碩士論文部分,對前一部分採用特徵線法求解,對后一部分根據模型形式採用龍格一庫塔法或隱式積分法等演算法求解,這兩部分的求解過程交替進行,最終即可得到大擾動過程的模擬結果。
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  14. The numerical simulation for adjustable - blade pump on - line autoregulation in diversion works has been studied in this paper whose background is modification works of dongjiang - shengzhen diversion works. the problems include autoregulation on water height of the fore bay in single pump station, autoregulation on output of adjustable - blade pump in single pump station, and autoregulation on flow equation of multilevel pump stations

    本論文以東江深圳供改造工程為背景,對工程中應用轉槳泵進行在線自動調節數字模擬進行了研究,其中包括單級泵站中對前池位進行自動調節,單級泵站中對轉槳泵的出流量進行自動調節,以及多級泵站輸水系統流量平衡自動調節。
  15. Part of water diverting works design for mianhuatan hydroelectric power station

    棉花灘電站輸水系統部分建築物設計
  16. Open channel supply system

    露天輸水系統
  17. Study on the filling amp; amp; emptying system of three - branched culvert in shiplock bottom

    船閘閘底三支廊道頂縫出輸水系統研究
  18. Visualized simulation system for transient process of water conveyance system of hydropower stations

    電站輸水系統力過渡過程的可視化模擬研究
  19. Research on action of slow closure back pressure valve in water delivery system with air cushion surge tank

    設置氣壓式調壓室的輸水系統中緩閉止回閥作用的研究
  20. On the base of the whole model structure, it realized the dynamic display of the transient fluid parameters in the conduit according to data available

    在整體模型構建的基礎上,根據試驗數據和計算數據,實現了輸水系統中流體瞬變物理量的動態的演示。
分享友人