輸配電線路 的英文怎麼說

中文拼音 [shūpèidiànxiàn]
輸配電線路 英文
electric line
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 配電 : distributing; power distribution配電板 distribution panel; distributing board; power board; switc...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. In oilfield, feeder line of 6kv often has many branches. the pole high voltage automotive capacitor compensation system controlled by single chip computer is designed for this situation. in the system, we separate the measure position and compensation position and realize the supervision of reactive load in local area

    文章以油田6kv輸配電線路為例,針對多分支樹狀結構的特點,研製出由單片機系統控制的戶外術上型高壓容器自動補償系統。
  2. Exchange non - clearane metal oxidate matter arrester is suitabe for the voltage protection of transformer switch cupboard, vacuum switch etc

    交流無間隙金屬氧化物避雷器,適用於變壓器、屏、開關櫃、真空開關、力計量箱、並聯補償容器、旋轉機等壓保護。
  3. Summarize : multi - input, can be used cooperate with various sensors / transducers, measure 、 display and alarm control the physical quantities such as temperature 、 humidity 、 liquid level and flux # 118alues and transform them to export, can read and write all parameters via the computer through serial communication, besides it can offer 24vdc power supply for 2 - wire transducers, four - bit led displaying, the multi - segment curve correcting function is selectable, one meter can equip four alarm relay outputs 、 one transform ( or communication ) output and one equipped power supply outputs

    萬能入,可與各類傳感器、變送器合使用,實現溫度、濕度、壓力、液位、流量等物理量的測量、顯示、報警控制和變送出;通過串列通信口,可在上位計算機中實現全部儀表參數的讀寫;還可為兩制變送器提供24vdc源; 4位高亮度led數字顯示;對入信號有多段折修正功能可選;一臺儀表最多可4個報警繼出、一變送(或通信)出和一出。
  4. Guide for automatic reclosing of line circuit breakers for ac distribution and transmission lines

    交流用戶器自動重閉指南
  5. In the transporting and assigning process of the electric power, the active power loss and electric power lose of the electric power net are known as the line loss

    送和分過程中,力網的有功功率損失和能損失統稱為損失,簡稱損。
  6. All the transmission lines of west - east electricity transmitting project are inevitable to crossing the high altitude and icing areas. for the reducing of the air pressure and the absolute humidity, the electricity strength of insulators will drop obviously. therefore, it must be considered the effect on the insulators " flashover voltage caused by the change of altitude and ice when the insulation cooperation of transmission lines are being designed

    「西東送」工程的所有都不可避免的要經過高海拔和覆冰地區,由於大氣壓力和絕對濕度的降低會使絕緣子的氣強度顯著下降,因此在進行的絕緣合設計時必須考慮到海拔高度和覆冰的變化對絕緣子的閃絡壓影響。
  7. Discussion on increasing transmission capacity of distribution line

    增大送容量的探討
  8. The cable is designed for aerial electricity transmission and distribution line

    本產品適用於架空輸配電線路
  9. On the condinary, much reactive capacity loaded would be bad, and net ' s voltage would be higher and its security would be influenced. with the needs of reducing line loss, to study the method of compensating reactive capacity has been an important task in power department

    同理,如果就地投入補償過大,多餘的無功就要通過輸配電線路向其他設備或區域送,也會造成無功和有功損耗,使得用戶的壓偏高,影響到力網的安全經濟運行。
  10. Lead the team to do the research on electro - magnetic transient overvoltage calculation and insulation coordination of power system, lightning overvoltage calculation of substations and transmission lines, protection, operation and test of arresters, overvoltage limiter and other lightning protection equipment

    帶領團隊從事力系統磁暫態過壓計算及系統絕緣合研究,變站和壓計算及防護技術研究,避雷器及過壓限制器等防雷保護設備的運行技術和試驗技術研究等。
  11. Due to flashovers often happen on hv transmission lines in that area

    青藏鐵套的110kv位於青藏高原海拔4000m 5000m的世界屋脊。
  12. It put out the system requirements from the whole structure, function structure, developing mode, user management, the design of software and database, safety design, system running efficiency, developing plan, etc. it put out the basic graphics operation, the module building and editing of the electrical network, the devices records and function management the devices operating management, the function producing the electrical subject chart, the outside interface function, the in - out function and webgis, etc. it discusses some advanced functions including the theory loss and practical loss computing of the distribution line, the reliability basic data producing and conversing tools, power cut management, the load supplying from other ways, the repairing management on user fault reports, th e new load installing assistant function, the management of hanging the cards and simulating operation, the monitonng and analyzing management of the running information, load monitoring and load density analyzing function and so on

    從系統總體結構,功能結構,開發模式,用戶管理,軟體和數據庫設計,安全性設計,系統運行效率,開發計劃等方面滿足了系統的總體要求;系統實現了基本圖形操作,網建模與編輯,設備臺帳及運行管理,設備操作運行管理,力專題圖生成,外部介面,出, web - gis等基本功能;系統還具有理論損計算及實際損計算,可靠性基礎數據生成和數據轉換工具,停管理,負荷轉供功能,用戶報修管理,用戶報裝輔助,掛牌管理和模擬操作,運行信息分析監控管理,負荷監控及負荷密度分析等高級功能:並能從運行方式,用戶權限,運行日誌三個方面闡述本系統的管理方式。系統總體結構合理,功能及介面齊全,置擴展方便,可操作性強。
  13. This product use in specified voltage ( uou ) 0. 61kv have fire - resistant require fail distribution line

    本產品用於額定壓( uou ) 0 . 61kv有耐火要求的輸配電線路中。
  14. 1 usage it is applicable to power circuit with rated voltage 3. 6 6 - 26 35kv for usage of delivering and distributing electric energy

    1產品用途:本產品適用於額定壓u0 u為3 . 6 6至26 35kv,供能之用。
  15. Distribution automation using distribution line carrier systems - general considerations - guide to identification of data transmission parameters concerning medium and low - voltage distribution mains

    使用載波系統的自動.一般考慮.關于中壓和低壓數據傳參數的識別指南
  16. High voltage shunt capacitor installation is applied to ac power system with 50hz for raising power factor, adjusting voltage of power grid, reducing transmission loss and raising the efficiency of transmission trans - formation facilities, so as to improve the quality of po - wer supply

    高壓並聯容器成套裝置適用於工頻系統中,用以提高功率因數,調整壓,降低損耗,充分發揮設備效率,改善供質量。
  17. It ' s also one important task in the information construction of electrical network. with the geographic information ' s visualization, gis takes one effective way to the power lines " and facilities " maintenance and management

    藉助地理信息可視化技術,將輸配電線路、供用設備及地理環境以圖文並茂的形式準確、直觀的展現出來為力企業的輸配電線路、設備維護管理提供了高效手段。
  18. This thesis presents a single - terminal fault location technique that is used together with recloser. the technique takes advantage of reclosing of single - terminal recloser to eliminate the influence of the remote source impedance. a distributed parameter line model is used for the proposed algorithm, thus the technique can be used in hv transmission line

    為了克服這一缺點,本文提出了與自動重合閘合使用的單端故障測距方法,根據力系統的運行特點,利用故障在試送時自動重合閘的單端重合狀態來消除對端系統的影響,測距演算法建立在分佈參數模型基礎上,使其可應用於高壓
  19. 220kv or above voltage transmission lines usual adopt double protective disposition ; each has its own independent ac and dc system to control different breaker

    220kv及以上壓等級的的保護置一般採用雙重置;由兩套交、直流出迴相互獨立,並分別控制不同斷器的保護裝置進行保護。
  20. Second, pwm - fcls are separately installed in the transmission line and the feeders where a short circuit fault may occur. matlab is used to simulate this process

    其次,將pwm - fcl分別安裝在發生短故障的以及系統的饋上,使用matlab對這兩種情況進行數字模擬。
分享友人