轉吊機 的英文怎麼說

中文拼音 [zhuǎndiào]
轉吊機 英文
slewing crane
  1. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構裝方案,樹狀結構械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  2. They were placed by a derrick mounted on rails on the bridge deck.

    它們由軌道上的放在橋面上。
  3. The pylon cell units were hoisted to the deck by the transfer derrick.

    塔室塊件由傳遞用的放在橋面上。
  4. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆車的水上移、承臺箱的起、鋼管樁的拔除等作業。
  5. Whoever without authorization, transfers exploration rights or mining rights without approval of the examining and approving agency, shall be ordered to make amends by the registration agency, have confiscated its illegal gains and be imposed a fine of not more than 100, 000 yuan ; if [ i ] the circumstances are serious, the original licensing agency shall revoke the exploration license or mining license

    例1未經審批管理關批準,擅自讓探礦權、采礦權的,由登記管理關責令改正,沒收違法所得,處10萬元以下的罰款;情節嚴重的,由原發證銷勘查許可證、采礦許可證。
  6. Whoever without authorization, transfers exploration rights or mining rights without approval of the examining and approving agency, shall be ordered to make amends by the registration agency, have confiscated its illegal gains and be imposed a fine of not more than 100, 000 yuan ; if the circumstances are serious, the original licensing agency shall revoke the exploration license or mining license

    例1未經審批管理關批準,擅自讓探礦權、采礦權的,由登記管理關責令改正,沒收違法所得,處10萬元以下的罰款;情節嚴重的,由原發證銷勘查許可證、采礦許可證。
  7. According to results of calculations and experiments, main causes that contribute to vibration are founded, then puts forward improving measures of adding deflexed supporting and suspending nogs and making pipelines shunt - wound, finally completes improvement tasks following is the main works completed in this thesis : ( 1 ) this thesis sets up a mathematic model of steam pipelines, using ansys5. 6 limited - unit analyzing software, calculates the ten phase inherent frequency and the foregoing eight phases vibration types of four steam pipelines of the unit before dealt with

    為了解決八零三電廠2號汽輪四根主蒸汽導汽管道振動的問題,本文建立了相應的計算模型,並根據計算和實測結果,找出了振動的主要原因,提出了加裝偏架和管道並聯的改進措施,完成了改造工作。本文主要工作是:建立導汽管計算模型,並應用ansys5 . 6有限元分析軟體,對組四根導汽管治理前的10階固有頻率和前8階振型進行計算。
  8. ( 3 ) by spot reconnaissances, according to the results of calculations and measures, the problem of vibration is solved by adding deflexed supporting and suspending nogs, making pipelines shunt - wound and without changing the previous design and collocation, which can also measure up nationally. to complete the improving program successfully, the improving project is demonstrated using ansys5. 6 limited - unit analyzing software, the results of it show that the project put forward can resolve the problem of transmitting steam pipelines

    通過現場勘察,根據計算和測量結果,決定在不改變導汽管原有設計和布置,同時又滿足國家標準的前提下,採用加裝偏架、導汽管並聯的措施,通過改善導汽管剛度和改變管道固有特性的方法,對該組四根導汽管振動問題進行了處理。
  9. The hoisting, derricking and slewing mechanism, the extension and contracting of booms, the setting down and back of outriggers, all are driven hydraulically

    的起升、變幅、回臂伸縮及支腿收放等構,全部採用液壓驅動。
  10. Other equipment : four 20 top ' s bridge cranes, two 10 ton ' s bridge cranes, six 5 top ' s bridge cranes, one 20 top ' s handjack, one 8 top ' s forklift, one wrap packaging machine, two steel coil reversal machines, two screw air compressor machine ( 5m3 )

    主要輔助設備配置: 20噸橋式車4臺, 10噸橋式車2臺, 5噸橋式車6臺, 20噸平板車1臺, 8噸叉車1臺,纏繞包裝1臺,鋼卷翻2臺,螺桿式空壓( 5立方) 2臺。
  11. Abstract : in view of, in the modification and maintenance of petro - chemical unit, the limited working space and inability of available hoisting equipment to meet hoisting installation requirements, a simple and reliable hoisting tool used is introduced taking account of the construction conditions

    文摘:在石油化工裝置大型設備的技術改造和檢修作業中,針對現場施工空間小、現有裝設備無法滿足施工要求的情況,介紹了因地制宜設置簡單可靠的具,完成裝作業的方法?門架旋作業法的成功應用。
  12. 63t full - hydraulic, full - revolving floating crane is primarily suitable for lifting of water constructional works and for lifting and transshipment of piece cargo as well

    63噸全液壓、全旋浮式起重,主要適用於水工建築裝作業,亦可用於單件貨物的裝卸與過駁作業。
  13. Swing performance and rating procedure, material handlers, knuckle boom log loaders and certain forestry equipment

    原料裝卸關節式桿原木裝車和特定林業設備的旋性能和評定程序
  14. Work platforms suspended from cranes or derricks - safety requirements

    起重臂起重的懸工作平臺.安全要求
  15. Q37 series single hook type abrator is one of the popular blasting equipment at present, its main characteristic : adopt non - withstanding structure, inner part all use wearable cast iron protection, as well as high efficient abrator, the lifting hook can rise, fall, rotate, pass in and out automatically with reasonable structure and high productivity which greatly lowers intensity of labor

    Q37系列單鉤式拋丸清理為目前最受歡迎拋丸設備之一,它的主要特點是:採用無地抗結構,室體內全部採用耐磨鑄鐵防護,配備高效拋丸器,鉤實現了升降自進出自動化,不僅結構合理生產效率高,而且大大降低了工人勞動強度。
  16. The heavy - duty slewing crane is suitable for the material swinging operation in metallurgy, railway, quay, machinery manufacture, etc. this hoist adopts the structure of rotary fulcrum bearing and variable cross - section. the overweight height is up to 2. 5 - 2. 6 meters, and rotary radius is up to 7 - 12 meters

    重型旋臂型起重適用於冶金鐵路碼頭械製造等行業的物料運作業,該採用了回支承與半截面壁結構,超重高度達2 .米,回半徑達米。
  17. After the machine stops, open its cover, loosen the lock blocks on lip ring, suspend the lip ring together with the filter bag containing cake to the place for discharging, then have the bottom of the filter bag splay, thus the cake being discharged automatically

    在離心力作用下,液相物穿過濾布和鼓壁濾孔排出鼓,經排液管排出外,固相物截留在鼓內,停后啟開蓋,松開攔液板鎖緊塊,將攔液板連同裝有濾渣的濾袋一併往卸料處,使濾袋底端落下張開,濾渣自動排出。
  18. Repairing technical requirement for special equipment of bucket dredgers part 6 : repair and asseemblage for rotary unit

    抓鬥挖泥船專用設備修理技術要求第6部分:旋構旋裝置修理裝配
  19. During the period, 5 - month - construction period delayed was saved because of the karst geological problems of dam ' s partial foundation. 3 units were put into operation in 2005, especially it only took 23 days from the runner of 4 # unit hoisted to put into operation

    2005年又實現了年內3臺組投產發電,尤其4號組從裝到組並網發電,僅用23天,創造了大型軸流組安裝奇跡。
  20. Repairing technical requirement for special equipment of bucket dredgers part 2 : cears of turning and hoisting onstallation

    抓鬥挖泥船專用設備修理技術要求第2部分:旋構齒輪
分享友人