轉槳 的英文怎麼說

中文拼音 [zhuǎnjiǎng]
轉槳 英文
feather turn
  • : 轉構詞成分。
  • : 名詞1. (劃船用具) oar; paddle 2. (螺旋槳) propeller
  1. Hard aport. rack the starboard oars

    左舷急!收回右舷長
  2. They are club - hauling ! hard aport ! raise the starboard oars. - hard aport

    -他們回了!固定左舷!收起右舷的船. -固定左舷
  3. In this dissertation, through computer simulation, the problems of modeling, control and guidance of auvs are presented. the first part of this dissertation addresses the problem of dynamically modeling of auvs, and derives thrusters " two - dimension nonlinear dynamic model, which has axial flow speed and propeller rotational velocity as two state variables, voltage or current of motor as inputs, and thruster force and torque as output. the second part focuses on the nonlinear adaptive sliding mode control of auvs in diving plane and steering plane

    本論文系統研究了自主式水下航行器的建模、非線性自適應滑模控制、以及深度調整和水平面導引方法等問題,具體成果和創新點如下1 、根據流體力學理論,建立了螺旋推進器的動態模型,它以螺旋來流速度v _ p和螺旋速n為狀態變量,以電機施加矩為輸入,螺旋推力t和矩q為輸出。
  4. The electric fan blades whirled in the hot room

    電扇的葉在悶熱的房內旋著。
  5. Building up the math - model of transient for the all hinge of riverbed power station with the kaplan turbine, building a simulation software for this kind of system and calculate the transient which take into account the effect of the ground swell on the riverbed. this program also can calculate the different kind of the kaplan turbine

    針對轉槳機組河床逕流式電站的樞紐系統,建立了全樞紐過渡過程的計算模型,並且編制了相應的計算程序,進行了計及河床涌浪的全樞紐系統的過渡過程模擬計算,該程序能對同一樞紐中含有不同型號機組的電站同時進行過渡過程計算。
  6. He would come up, close, co - altitude, within about three to five feet, was making gestures, pulled back a little bit, came back up again and made some more gestures, and then the third time his closure rate was too far. instead of under - running, he attempted to kind of turn and pitch up, and that was when his vertical stabilizer - - where it meets the fuselage of the aircraft - - impacted my number one propeller, basically pretty much tearing his aircraft apart

    他追上來、靠近、與我們同一高度,距我們約3英尺到5英尺以內,他做了幾個手勢,後退了一點,再次追過來並做出更多的手勢,然後他第3次靠近,這次他離得太近了。他不是在下方飛行,而是試圖做出某種身和提拉,此刻他的垂直穩定翼同機身相接的地方撞到了我的1號螺旋,他的飛機基本上就斷裂了。
  7. The experiment can obtain the driver and the torsion of the screw propeller of relative speed and is an important method to analyze the efficient part of push

    船模自航試驗可獲得對應航速螺旋推力和矩,是分析各種推進效率成分的重要手段。
  8. In addition, the second part of text adopts mmg segregative math model and correlative series test result and built ship manoeuvre movement equation of one propeller and one rudder ocean transport ship in still deep water. besides, the text used math model to workout calculated program that was modeled on ship ' s turning trajectory and zigzag manoeuvre

    另外,論文後半部基於mmg分離式數學模型及相關的系列化試驗結果,建立了單單舵海洋運輸船舶在靜水中的船舶操縱運動方程,利用數學模型,編制了計算程序,對船舶回運動、 z形操縱運動進行了數學模擬。
  9. Guide for assembly and test technology of runner of kaplan turbine

    轉槳輪組裝與試驗工藝導則
  10. A pcc based stepping motor driven dual control governor for kaplan turbine is presented in this paper. the governor adds the function of adaptive control of blades and radius basis function cam network based on the current pcc based stepping motor driven single control governor

    該調速器在當前pcc步進式水輪機單調整調速器的基礎上引入了葉自適應控制和基於rbf網路的協聯裝置,可定期對轉槳式水輪機協聯關系進行自校正,保證水輪機始終運行在較高效率區。
  11. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式水輪機適應于開發中低水頭水力資源。我公司生產的軸流式水輪機按輪結構分為定zd轉槳zz兩種,定式一般適用於中小容量及水頭負荷變化較小的的水電站轉槳式多用於大中型電站及水頭負荷變化較大的水電站。
  12. For getting the runner characteristics more correctly, researching the representation of runner characteristics of the kaplan turbine in this paper, and using this method of modifying runner characteristics to calculate the transient of hydraulic power station. improving the calculating model of the axial thrust in the kaplan turbine ' s transient. base on the theory of screw propeller without any boundary, using the theory of screw propeller with pipe, and the formula to calculate the dynamic axial thrust during transient is developed

    本文對轉槳機組在過渡過程中的葉劃水產生水推力的數學模型進行了改進,在原來使用無邊界螺旋進行等效的基礎上,使用了導管螺旋轉槳機組中的葉劃水進行等效,並且比較詳細的分析了影響轉槳機組軸向水推力的各個因素,以及給出了動態計算軸向水推力的公式,通過計算表明,使用改進后的動態水推力計算模型得到的結果能較好的反應實測的動態軸向水推力。
  13. The propeller may be overloaded which caused by some reasons when ship has been serviced for a period of time. as a result, the rated revolution of the engine cannot be achieved, or the engine may be on overloaded operation condition. it will not be in the optimum matching between the propeller and the engine

    船舶在使用過程中,常因各種因素使螺旋出現負荷過「重」的現象,主機達不到額定速或超負荷運機不能處于最佳匹配;另外當船舶人為地降速航行時,主機處在半負荷情況下工作,如果速下降太多,使得主機的工作條件變壞,容易引起主機部件的損壞。
  14. The computation results are satisfying and prove that adjustable - blade pump on - line autoregulation can be done with good accuracy and convergence in realtime

    計算結果表明,轉槳泵進行在線自動調節具有很好的實時性、精確性,收斂性也較好。
  15. The all hinge of riverbed power station of the kaplan turbine ' s transient is studied in this paper whose background is the water hinge of power station in sha potou on the yellow river

    本文以黃河沙坡頭水利樞紐電站系統為工程背景,對轉槳機組河床逕流式電站全樞紐系統進行了過渡過程的數值模擬研究。
  16. In this paper, some off - line manual methods for regulation of flow equation have been compared and analyzed. based on pid speed governor of turbines, two kinds of governors are designed for adjustable - blade pump, which can perform autoregulation on water height of the fore bay and on pump output by adjusting the blade angle of adjustable - blade pump. the computation models of the two kinds of governors are also offered and the transient simulation can be done on pc

    文中,比較分析了現有的多種離線手動調節流量平衡的方法,在水輪機pid調速器的基礎上,針對轉槳泵設計了兩種新型調節器,通過改變轉槳泵的葉片安放角,分別能對泵站前池水位和泵的輸出流量進行自動調節;提出了兩種新型調節器的計算模型,使轉槳泵在線自動調節動態模擬得以在微機上得以實現。
  17. The numerical simulation for adjustable - blade pump on - line autoregulation in diversion works has been studied in this paper whose background is modification works of dongjiang - shengzhen diversion works. the problems include autoregulation on water height of the fore bay in single pump station, autoregulation on output of adjustable - blade pump in single pump station, and autoregulation on flow equation of multilevel pump stations

    本論文以東江深圳供水改造工程為背景,對輸水工程中應用轉槳泵進行在線自動調節數字模擬進行了研究,其中包括單級泵站中對前池水位進行自動調節,單級泵站中對轉槳泵的輸出流量進行自動調節,以及多級泵站輸水系統流量平衡自動調節。
  18. Several transient simulation programs have been developed based on the models above, and were put into practice of the transient simulations of following : ( 1 ) autoregulation on water height of the fore bay in single pump station, and the influence of governor parameters ; ( 2 ) autoregulation on output of adjustable - blade pump in single pump station, and the influence of governor parameters ; ( 3 ) on - line autoregulation on flow equation of multilevel pump stations system

    本文應用上述方法編制了過渡過程模擬程序, ( 1 )進行了單級泵站中轉槳泵在線自動調節泵站前池水位的動態模擬計算,並對調節參數的影響做了比較研究; ( 2 )進行了單級泵站中轉槳泵在線自動調節泵輸出流量的動態模擬計算,並對調節參數的影響做了比較研究; ( 3 )進行了多級泵站中轉槳泵在線自動調節輸水系統流量平衡的動態模擬計算。
  19. The numerical simulation and experimental research made on the characteristics of the clearance cavitations in kaplan turbine are described herein ; in which the analysis mainly is concentrated on the characteristics of leakage - vortex caused by the flow of the clearance between blade tip and blade chamber, that occurs at the front - pressure side of the blade, and the intensity of the secondary - flow - vortex ; furthermore, the relationship in between the leakage - vortex, secondary flow vortex, cavitations and erosion are analyzed as well

    摘要對軸流轉槳式水輪機輪緣間隙流動及空化特性進行數值模擬和試驗研究,重點分析輪緣間隙流動在正面頭部泄漏流動所引起的泄漏渦帶、二次流動的漩渦強度和空化特性,以及泄漏渦帶旋、二次流動的漩渦與空蝕和磨損之間的關系。
  20. During the period, 5 - month - construction period delayed was saved because of the karst geological problems of dam ' s partial foundation. 3 units were put into operation in 2005, especially it only took 23 days from the runner of 4 # unit hoisted to put into operation

    2005年又實現了年內3臺機組投產發電,尤其4號機組從輪吊裝到機組並網發電,僅用23天,創造了大型軸流轉槳機組安裝奇跡。