連接板 的英文怎麼說

中文拼音 [liánjiēbǎn]
連接板 英文
jointbar; gusset plate; connection board; connector panel; joint fastening; junction panel; junction plate; knee plate; rail splice; splice plate; web plate
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. Here air corridor built by pavement of european wood board becomes function transition joining up two spaces of upper and lower floors

    這里由歐木鋪裝而成的空中走廊,是上下層空間的功能過渡。
  2. This paper discusses the designing and making of the dynamic testing systems of engine electronic control system. base on the construction and operation principle of santana 2000gsi m3. 8. 2 engine electronic control systems, design and manufacture led circuit of dynamic testing and fault imitating electronic control unit. on the inspect board, design and equip with motronic 3. 8. 2 ecu i / o measuring joints, design and set up obd - ii diagnostic communication link, design and install fuel pressure inspecting meter. depend on the obd - ii diagnostic communication link and ecu i / o measuring joints, this dynamic testing system can inspect engine electronic fuel injection system, distributorless ignition system, idle speed control system and evaporative emission control system, and can inspect m3. 8. 2 sensors, ecu and actuators, and can interrogate fault memory and erase fault memory ; and can analyse data stream ; and can carry out fault imitating. besides, this paper analyses sensors and actuators typical fault w aves

    2電控單元電路器設計製成輸入輸出電子控制檢測端子,並在檢測面上布置了obd -診斷插座和燃油壓力表。使該動態測試系統能實現對電噴發動機的燃油系統、直點火系統、怠速控制系統和燃油蒸氣排放控制系統的動態檢測;並通過obd -診斷座、 ecu輸入輸出檢測端子和故障模擬處理單元實現對電噴發動機電控系統各傳感器、電控單元、執行器進行故障碼讀取與清除;動態數據讀取和波形測試和故障模擬等。此外,本論文還分析了傳感器和執行器典型故障波形。
  3. From the analysis, some suggestion about joint rigidity design is put forward : 1. joint initial rigidity can be enhanced within the limited range when to increase end - plate thickness ; 2. the rigidity and ultimate moment can be enhanced obviously when to adopt the beam with inclined section or to add axilla at the connections between beam and column ; 3. withm the permissive construction condition, exteriorly extended end - plate inclinedly placed is suggested to be applied firstly ; 4. when the rate of joint rigidity to beam rigidity, that is called, is less than 0. 1, the joints can be regarded as zero - rigidity joints ; on the other hand, if is more than 26, it is rigid connection joints

    採用斜截面梁並在樑柱交處局部加腋能明顯提高節點剛度和梁的抗彎能力; 3在允許的施工條件下,應優先採用外伸式端斜放節點,有利於提高節點剛度,進而提高節點的抗彎能力; 4節點剛度與其構件的剛度比值0 . 1時,可按鉸節點設計; 26時,可按剛節點設計。
  4. 3 use the doweling plus the glue to fix the baluster and straight step together

    3用木削加乳白膠把小柱和踏牢固。
  5. The forces that developed from the deformation in the cross-frame were primarily transmitted from the connection plate into the web by the upper pair of intermittent fillet welds.

    因橫向框架中的變形所發生的力最初由連接板通過較上面的一對間斷貼角縫傳入腹中。
  6. Rope attachments ; thimble connection plates for round ropes

    繩索裝置.圓鋼絲索的套環連接板
  7. This is a major shortcut since the plugboard settings form a huge portion of the key space

    這是一條重要的捷徑,通過設置線路連接板的步線來生成大量的密鑰空間。
  8. According to the calculation results, the influences of the construction operation program, the length of the toe slab ( connecting slab ) and the rigidity of the diaphragm wall are compared

    據此,對整個壩體的施工程序、趾(包括連接板)的長度和防滲墻的剛度進行了分析比較。
  9. Cracks that have developed in the web at lateral connection plates have generally occurred because of intersecting welds.

    在水平連接板處出現裂紋,通常是由於有交叉焊縫。
  10. Rope attachments ; outer plates, inner plates

    繩索裝置.外連接板.內連接板
  11. General timeslot cross - connection gtc

    通用時隙交叉連接板
  12. Hydraulic valves ; mounting surfaces and connecting plates for directional control valves

    液壓閥.換向閥用安裝面和連接板
  13. Treatment on welding crack on connecting plate of turbine at ertan hydropower project

    二灘水電站水輪機連接板裂紋處理
  14. Besides, the length of linking slab must be optimized to improve the stress of the diaphragm wall

    另外,連接板的長度也需進行合理的優化設計。
  15. Auxiliaries of band conveyers used in fishery docks. essential parameters, dimensions of connecting plate

    漁業碼頭用皮帶輸送機.輔助裝置連接板基本參數尺寸
  16. Here the changes lie in constantly trying out new wirings of the enigma plugboard

    梯度演算法逐步對對象(在此情況下為線路連接板設置)進行改變,以此來優化對象。
  17. This paper take the junction panel of the front reinforced beam in the back automobile floor for the example, introduces the drawing die design process, which proves this method simplified the design process, enhanced the rated capacity

    本文以汽車后地前加強梁左右連接板為例介紹了汽車覆蓋件拉延模具設計,經過實踐應用,證明該方法簡化了設計過程,提高了設計效率。
  18. After comparing between the finite - element analysis and experimental results, the author verified the fem. then according to the chinese code, the nonlinear finite model of the beam - to - column is established which are made of different size components. the responses of beam - to - column web moment connections which are made of different size components are compared and analyzed from three facets, and the conclusions about the joints behavior are drawn : thicken the connection plate, lengthen the connection plate or use a back - up stiffer can improve the connection behavior, consist of improving the behavior of load - supported and reducing the stress convergence in the flange moment plates

    本文根據我國規范的有關規定,自行建立了12個不同構件尺寸的樑柱腹的三維有限元模型,對不同構件尺寸的樑柱腹剛性節點在單向荷載作用下的反應進行了研究,從結構的mises應力等值線示意圖、梁端加載處的荷載? ?位移曲線、翼緣連接板兩端的mises等效應力以及翼緣連接板與柱相的三邊的mises應力等值線示意圖四方面進行了比較與分析,從而得出了不同構件尺寸的樑柱腹剛性的在受力行為上的結論:增加翼緣連接板的厚度、增加翼緣連接板的長度以及採用柱的橫向加勁肋均可以改善節點的受力性能:提高節點的承載能力;減小翼緣連接板內部與柱翼緣邊的的應力不均勻現象,從而避免試件過早地發生破壞。
  19. In the case of africa, already sliding eastward, the force is further movement eastward, as subduction of the indio - australian plate has already begun, the weaker link already established and momentum in process

    在非洲大陸已經向東方滑動了的情況下, (原先存在的)壓力被進一步轉移到東方,因為印澳塊的縮減已經發生,塊之間已經建立了不牢固的塊移動的動力也被轉化了。
  20. Hill climbing algorithms try to optimize an object, in this case the plugboard settings, by changing the object step by step

    梯度演算法逐步對對象(在此情況下為線路連接板設置)進行改變,以此來優化對象。
分享友人