  1. Anchorage, grip and coupler for prestressing tendons

    預應力用錨具夾具和
  2. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重構件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處設鋼混凝土構造()柱,墻板和樓板相交處設系(圈)梁,系梁和柱主要起和傳遞荷載作用,也承擔少部分荷載。
  3. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配大小以及墻板內肋梁肋柱配等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  4. Supervising the quality of thread rolling bar connection

    滾軋直螺紋質量監理控制
  5. New technique for steel wire joint - rolling press straight thread conjunction

    等強度剝肋滾壓直螺紋技術的應用
  6. Now, for the last number in our act, we did these 20 acrobatic, one, two, three four, five. . splits, spread eagles, back flips, flip flops, one right after the other

    我們的節目最後,有一段20個動作的雜技,一,二,三,四,五… …劈叉,雄鷹展翅,反轉斗、斗,一個一個。
  7. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals

    混凝土暴雨排水溝設施管道和橫向排水溝間的排水溝回彈性件的標準規范
  8. Standard specification for storm drain resilient connectors between reinforced concrete storm sewer structures, pipes, and laterals metric

    混凝土排暴雨污水結構管道和橫向排水溝間的暴雨排水溝彈性件標準規范
  9. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性、機座與底板整體澆注、採用先進計算理論指導配
  10. Quality control of steel bar rolling amp; amp; linear whorl connection

    剝肋滾壓直螺紋的質量控制
  11. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼改進傳統的電焊方式,採用大量採用鋼頭機械技術,有效提高了頭強度和鋼速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  12. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「鋼板箍法」做地基梁鋼點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼砼護壁確保挖孔樁的安全成型,使用柔性鉤進行鋼籠吊裝簡化施工工序;承臺梁施工採用梁主橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  13. This paper is focused on a series of experiments including two kinds of large - scale composite walls with different joint fashion under low cyclic loadings. the experiments are carried out in order to know the seismic of composite walls out - of - plane and research the impact of deformation out - of - plane on carrying ability in - plane, experimental design reference is expected to achieve and tech support provide

    為了彌補這方面的研究不足,本文對兩種方式足尺復合墻片進行了低周反復荷載作用下的恢復力試驗,以了解配砌塊復合墻的平面外抗震性能,同時研究平面外變形對墻體平面內抗震性能的影響,為配砌塊復合墻的設計提供依據。
  14. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與鋼梁的組合作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程中節點設計應當考慮這種組合作用;樓板內縱向鋼率與柱腹板加勁肋對節點性能影響顯著,而端板厚度及剪力程度的影響則不是太顯著。
  15. The programme can solve two - dimensional stresses, strains and axial symmetry problems with different yield criteria. a satisfying solution has been put forward to the contact boundary between reinforcements and soil. the special problem of two contact plane elements at the joint between plate and strip has been solved

    該程序能同時考慮平面應力、平面應變和軸對稱問題,並能運用不同的屈服準則,使其更具有通用性和適用性,成功地解決了材與土介質界面的觸問題,較好地解決了墻面板與處出現兩個觸面單元的特殊問題。
  16. The main research is below : ( 1 ) the influence to intensity and rigid with corner angle ( 60, 75 and 90 degree ) of crack and the board axes ( 2 ) do a fem stress / strain and crack growth simulation analysis when the corner angle of crack and the board axes is 60 degree ( 3 ) do a intensity resume analysis for the structure which is repaired with a titanium patch in a mechanical way when the corner angle of crack and the board axes is 60 degree through simulation analysis for three failure criterion, we have : ( 1 ) in 60, damage extend quickly with damage analysis in hashin criterion ; it is slower for analysis in maximum stress or hashin - rotem criterion. ( 2 ) in special term ( physical condition incision, shape or maximum load ) the compression strength of the stiffened plate will decline 45 % ~ 50 % under compression loads

    通過採用三個不同損傷判據的數值模擬模擬,得到如下結論: ( 1 )在60時,用hashin判據進行的損傷分析,損傷擴展較快;最大應力及hashin - rotem判據進行的損傷分析,損傷擴展基本相當,且較慢; ( 2 )在所給加板的物理條件、切口大小及形狀、最大載荷等一定的條件下,該加板在壓縮載荷作用下,其壓縮強度下降了45 50 ; ( 3 )在本文提及到的機械修理方法以及載荷條件下,修理后的結構強度恢復能夠滿足戰時要求。
  17. The application of cold squeeze faucet joint technology for ribbed reinforcement in hangzhou bay cross - sea bridge

    帶肋鋼套筒冷擠壓技術在杭州灣跨海大橋中的應用
  18. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿拱支承結構的縱槽向地震效應較小;吊桿式拱架結構動力特性取決于槽墩和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件和變截面處增設梗脅,按照約束混凝土的要求來加強箍的配置,增加砼的延性,以克服地震時構件和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  19. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、鋼模板聯體施工、鋼滾壓直螺紋套筒、混凝土施工縫栽石法等可靠的施工技術和施工工藝,取得了較好的效果。
  20. The company ' s main products include : ordinary - type, forward - and - backforward - thread typeandcalibre - changed type, three series and 50 - odd varieties of steel straight thread connecting sleeve piece and steel straight thread screw rolling machine, screw rolling wheel, cutting tool, reinforced thread head special gauge, moment spanner ect., auxiliary tools which are used in construction

    公司主要產品有標準型、正反絲型、變徑型三大系列五十多個品種的建築用鋼直螺紋套筒和鋼直螺紋(剝肋)滾絲機及滾絲輪、切削刀具、鋼絲頭專用量規、力矩扳手等輔具。