連續多跨 的英文怎麼說

中文拼音 [liánduōkuà]
連續多跨 英文
multi spans continuous
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • 連續 : continuation; succession; series; continuity; continuing; running; continuous; successive; contin...
  1. Those of multi - span, middle - length ( about 25 - 40 metres ) are of large percentage among advanced bridges. simply - supported girder bridges with continuous decks are inferior to those of continuous girders because their decks crack easily. owing to the complex construction of continuous girder bridges, which is laboursome and time - consuming, people have been thinking about an approach to combining the advantages of the two so as to speed up the building and reduce the work procedures

    在高等級公路橋梁中,孔中等徑(徑在25 40米左右)的橋梁占很大的比重,橋面的簡支梁結構體系由於存在橋面容易開裂等缺點而在與梁結構體系的競爭中常常處于下風。
  2. This paper demonstrates ultimate stress increment of unbonded tendons can be composed of approximate elastic deformation along the elements and local plastic deformation by nonlinear analysis on the unbonded partially prestressed concrete continuous structures. referring to the rule of ultimate stress increment of unbonded tendons at every load case, a regression formula of ultimate stress increment of unbonded tendons based on elastic - perfectly plastic model has been presented for engineers to calculate ultimate stresses of unbonded tendons in prestressed concrete multi - span continuous structures

    考慮在各種荷載工況作用下無粘結筋極限應力增量的變化規律,並與理想的彈塑性模型相比較,最終得出以理想彈塑性模型計算各種荷載工況作用下無粘結筋極限應力增量的回歸公式,從而為預應力混凝土結構的無粘結筋應力設計計算提供有益的參考。
  3. Ultimate stress increment is a hotspot problem in theory of unbonded partially prestressed concrete structure, however, according to design critera and the art of the state on this issue around the world, it is still not considered in reason that ultimate stress of unbonded tendons in prestressed concrete multi - span continuous structures varies with load cases

    無粘結筋的極限應力增量一直是無粘結預應力混凝土結構理論中熱點問題,而從目前各國的設計依據及研究現狀來看,還沒有合理考慮結構的無粘結筋極限應力隨荷載工況變化的情況。
  4. The third part : according to the verified structural damage identification method and supposing the to - be identified parameters to be independent and have normal distribution, the scheme of identifying bridge structure damage is proposed by using the probability damage identification method. assume the zero - order, the first - order and the second - order perturbation statistics of the frequencies and the mode shapes of the bridge structures are known, and substitute them into the statistics property formulas of the frequencies and the mode shapes, as a result an objective function including the mean values and the variance of all the identified parameters is established. set

    對于梁橋,當損傷位置位於中附近時,大數無損傷單元的損傷概率均在10 %左右,可作為小概率事件,不發生損傷,但與損傷單元相鄰的無損傷單元,其損傷概率達到20 %以上,很難被排除,只有對這些單元進行二次識別,才能得到比較可靠的計算結果;如果損傷位於支點附近時,則不會出現上述情況,對于無損傷單元,損傷概率都小於10 % ,不發生損傷,損傷識別結果
  5. Visual analysis of human motion has been receiving increasing attention from researchers in the fields of image processing and computer vision during the past few years. it has a lot of applications in virtual reality, smart surveillance system, advanced user interface, motion analysis and video compressing, etc. this paper focuses on the technology of human motion tracking based on video, first, we make a summarization of the domestic and overseas status of the research in this field. on the basis of this, we analyse the technical difficulties of human motion tracking. as most of the existing model - based methods of human motion tracking perform not so good in some situation as they need mannual intervention, and also the precision of tracking is not so satisfying during the research of tracking of walking people because of the self - occlusion of legs, this paper proposes an algorithm of automatic detection and tracking of legs of the walking people based on monocular image sequences, in which we analyse the features of walking people, track the five joints of lower limbs, get various parameters, and then re - construct the walking process. the main research achievement is as follows : 1 ) we propose an algorithm of markerless automatic extraction of leg skeleton. first we divide the video into continuous image sequences, after background subtraction, the satisfying human region could be extracted, then we get a single - connected region by converting the rgb image to binary image and median filtering. afterwards, the contour of lower limbs in the frame with a widest boundingbox is detected, using sobel operator, to find the ankle joint of leg behind according to the features and rules of walking, then, the joint of knee of leg behind, hip, ankle of leg in front, knee of leg in front could be got in turn. so, model of leg skeleton is constructed

    首先將視頻分解成許的靜態圖像幀,經過背景去除,把感興趣的人體區域提取出來,通過二值化,中值濾波等預處理方法得到只有人體的一個單通區域,然後用sobel運算元檢測出boundingbox最寬幀中人體下半身的輪廓,根據運動規律及特徵找到後腿踝關節點,結合從boundingbox最窄幀中所獲取的腿長依次得到後腿膝關節,部關節,前腿踝關節,前腿膝關節四點,從而構建出腿部骨架模型。 2 )實現了人體步行腿部骨架的跟蹤演算法。在完成對腿部骨架模型的自動初始化之後,本文對關節、膝關節及踝關節分別採用運動建模、圓周相交定點演算法、運動預測及預測點周圍搜索rgb相似矩形塊三種方法確定每一幀中其實際坐標,從而重構出腿部骨架的運動過程。
  6. With the rapid transit development of china ' s highway and railway, more long span bridges were needed to span great rivers and bays, pc continuous rigid frame bridge emerged as the times require and was developed fleetly in recent years

    隨著我國公路和鐵路高速交通事業的發展,急需修建更的大度橋梁以越大江、大河和海灣,預應力混凝土剛構橋應運而生,近年來得到較快的發展。
  7. At present, crack phenomenon always appears in long span prestressed concrete continuous beam bridges used, the reason of which is that the structure prestressed loss is estimated lower

    目前,在部分已建成運營的大度預應力混凝土梁橋的不同部位出現了不同程度的開裂現象,數是由於施工時對結構預應力損失估計不足所造成的。
  8. Thirdly, the discontinuous knowledge innovation, which breaks the path of continuous innovation process and rebuild a new path to support many kinds of unknowing technical innovation so as to form a new core basic knowledge of enterprise. with this innovation firms can exceed their traditional knowledge for evolution and grow up to fulfill their spanning development

    再次是不型企業知識創新過程,它是對型創新過程和己有創新路徑的打破,重新確定新的路徑和企業的基礎知識平臺,來支持可能出現的種類型的技術創新活動,從而形成新的企業核心知識,並由此帶來企業的越式發展。
  9. Multi - spans continuous

    連續多跨
  10. ( 6 ) pathological morphology : the vascular permeability, and tissue swell of cim group was slighter than the other groups in 6h after irrigation. the necrosis tissue was mixed by normal tissue ; 3d after irrigation, the speed of repair of cim was faster than the other groups. in cim, blood capillary began to form from the edge of wound

    ( 6 )病理形態學變化:沖洗后6h , cim組的血管通透性、組織腫脹程度較另外兩組輕,壞死組織中夾雜有較正常組織;沖洗后3d ,組織修復加快,表現為毛細血管從傷口邊緣長入形成血液循環,與血管新生的同時,鄰近的成纖維母細胞越切口,將傷口接,而後膠原繼增加。
  11. Look a perfect pair, it is china and foreign countries of chinese head home at the same time joint - stock bank, root xiamen is native land, through 20 years feel climb boil dozen, already grew to cross the mainland and hongkong and macow to manage for a ground at present, successive and old selected england " banker " magazine " 1000 big bank of world " and " 200 big bank of asian " ; across is the local commercial bank of mainland of xiamen of base oneself upon, add endowment improve a company to administer structural cry long - standing, cut very to what capital and advanced administrative system long for how to hold foreign currency of start rising billow to trade to begin

    看起來珠聯璧合,一邊是中國首家中外合資銀行,植根廈門本土,經過20年的摸爬滾打,目前已成長為一家地大陸和港澳經營、年入選英國《銀行家》雜志「世界1000大銀行」和「亞洲200大銀行」 ;另一邊則是立足廈門本土的地方性商業銀行,增資改善公司治理結構呼聲由來已久,對于資金和先進的治理制度盼之甚切把握升浪起點外匯交易怎樣開始?
  12. The company area amounts to 188, 000 square meters, the total property 380million yuan, the existing staff more than 600people, have the domestic first class production and the checkout facility, the management rigorous science, the quality guarantee system perfect are reliable, the product has the honor to receive the chinese name brand the product title and the guangdong province famous brand goods the title, bid in the province to has been come out in front in the mark rate, continuous many years is choose for " heavy contract, keep promise " business enterprise

    公司佔地面積達18 . 8萬平方米,總資產4 . 5億元,現有員工700人,年生產能力逾15億元, 2005年年產值達12 . 3億元,公司發展越了一個新的里程碑。公司擁有國內一流的生產和檢測設備,管理嚴謹科學,質量保證體系健全可靠,產品榮獲「中國名牌」產品稱號及「國家免檢產品」稱號,在省內投標中標率一直名列前茅,年被評為「重合同守信用」企業。
  13. The development of children ' s aggressive behaviors has been one of the most important research areas in developmental psychology. meanwhile, aggression is a complex developmental construct with high continuity. some children behavior more aggressively than the others and the interindividual difference will keep strongly stable across ages

    攻擊性行為同時是一種非常復雜的性的發展結構,個體很早就表現攻擊性的個體差異,一些兒童相對其他兒童更具攻擊性,表現出更的攻擊行為,而且這種差異具有高度的時間的穩定性。
  14. Under the circumstance of general stagnancy of the state - owned enterprise, not associating with foreign company, nor coming into market, triangle group has developed itself from little to big, week to strong by accumulating by itself and rolling development. now it has become an area - crossing, multi - industry large scale state - owned company which engages in tyre manufacturing, refined chemical, electrical device and machinery manufacturing, project installation, third - industry service from previous little enterprise which annual output is less than 10 million rmb. especially in the last decade, its profit has been growing by 30 % each year

    三角集團能夠在國企大面積不景氣,自身未合資,也未上市的情況下,從小到大,從弱到強,依靠自我積累,滾動發展,由一家產值不足千萬的小企業,迅速發展成為以輪胎生產經營為主導,兼營精細化工、機電製造、工程安裝、三產服務的地區、行業的功能大型國有企業,特別是近十年來經濟效益以每年30的效益遞增,企業綜合實力及經濟效益三年排國內同行業首位,工業總產值達到36億元,世界同行業排名第12位。
  15. Static and dynamic testing - based evaluation of load - carrying capacity for a prestressed concrete continuous bridge with nine - spans

    基於靜動力測試的預應力梁橋承載力評估
  16. We will actively open up new markets, bringing in more foreign capital, attracting foreign talent, and encouraging more multinational corporations to set up their regional headquarters in hong kong

    我們會繼努力向海外推介香港同整個珠三角的潛力,積極開拓世界市場,引進外來資金,吸引國際人才,爭取更國公司來港設立地區總部。
分享友人