進度尺 的英文怎麼說

中文拼音 [jìnchǐ]
進度尺 英文
progress bar
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : 尺名詞[音樂] (中國民族音樂音階上的一級 樂譜上用做記音符號 參看「工尺」) a note of the scale in ...
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. Binary scale or numbering system

    或編號系統
  2. This paper deriving the theory work inflection point in the static stage characteristics curve of small measurement range linear dimension measurement. by the way of high pressure and back pressure pneumatic measure and designed the parameter of the mainly and measure spray head, which are the key component in the spray head - baffle pneumatic sensor. the different groups for the main - spray head and the measure spray head, will effect the dynamic and static stage characteristic parameter. the author have done contrast experiment and optimization design to test and verify the theory derivation whereby made the rang of show valve of pneumatic measure system measure range up to 40 u m, the sensitivity up to 100mv / u m, resolution up to 0. 05 p m, the uncertainly of measure is less than 0. o2 u m, satisfaction of requirement of groups the carboy hatch thickness size precise measure of soft shims

    對高壓背壓式氣動測量用於小量程線性寸測量的靜態特性曲線的理論工作拐點行了推導,對氣動測量系統中的噴嘴-擋板型氣動傳感器中的關鍵部件? ?主噴嘴和測量噴嘴的參數行了理論設計,對主噴嘴和測量噴嘴的不同組合,將影響測量系統靜、動態特性指標的噴嘴參數行了對比實驗和優化設計,並通過實驗驗證了理論推導,從而使氣動測量系統量程的示值范圍達到40 m ,靈敏達到100mv m ,解析達到0 . 05 m ,測量不確定小於0 . 2 m ,滿足了壓縮機缸蓋軟體墊片厚寸精密測量分組的要求。
  3. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密、爆破等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道施工中的運用取得的成效,提高了施工,同時也保證了施工質量。
  4. In this paper, the drive theory of the large ratio friction transmission is studied ; a new type elliptical cam wave generator is designed ; the large ratio friction transmission prototype is designed and manufactured ; based on the ansys finite element method software, structure of the elliptical cam is analyzed ; precision index of the manufactured large ratio friction transmission prototype, such as transmission accuracy, least step, stability of the least step, load capacity is measured by the absolute rotary encoder. by analyzing the measurement data and research content, it is think that the new elliptical cam wave generator could overcome a good many problems brought by processing errors, facilitate size precision adjustments, input moment can be achieved in the form of a pure force couple importing ; through this study, " the large ratio friction transmission prototype " could apply in practical engineering basically

    本文研究了大速比摩擦傳動的傳動理論;設計了新型橢圓凸輪波發生器,設計製作了大速比摩擦傳動樣機;用軟體ansys對所設計的橢圓凸輪結構行了有限元分析;用19位絕對式編碼器測試了大速比摩擦傳動機構的傳動精、最小步距、最小步距的穩定性以及帶負載能力等各項精指標;對測量數據和研究內容行了歸納和整理,認為新型橢圓凸輪波發生器克服了加工誤差帶來的諸多問題,新型橢圓凸輪波發生器可以寸精調整,能夠達到輸入力矩以純力偶的形式輸入;通過本項研究,基本可以使「大速比摩擦傳動機構」在工程中得以應用。
  5. To the large - scale atmosphere, we separate the terms of the horizontal vorticity converting into the vertical vorticity, which considered as the baroclinic terms, from the terms that not including horizontal vorticity by the rules of the p coordinate transforming to the z coordinate in the traditional vorticity equation, and carry out the scale analysis, and then conclude that the baroclinic terms are able to reach the same magnitude grade as the partial derivative of the vertical vorticity to time when it takes place the large scale precipitation in the summer monsoon period in china. by analyzing the game reanalysis data from april to august in 1998 in the region of chinese continent, we found that the baroclinic terms is important to the large - scale cyclone developing above the 600hpa, and the magnitude changing of the baroclinic terms is nearly in - phase as the monsoon movement, so which imply exactly that the magnitude changing of the baroclinic terms is the one of the natural characters of the summer monsoon evolution and equivalent to the movement rule of the subtropical high of the western pacific

    在p坐標垂直渦方程中,利用p坐標向z坐標轉換的公式將水平渦向垂直渦轉化的所有項分離出來,這些項具有明顯的斜壓特徵,對其分析后,得出在可以忽略潛熱釋放對渦影響的對流層中、高層,此轉化項是大斜壓渦發展的重要項。通過對1998年48月的game再分析資料行實際計算也發現,轉化項在東亞夏季風上升支的600hpa及以上層次對垂直渦的局地變化貢獻很大,不能忽略。同時發現水平渦向垂直渦的轉化在南海季風爆發時和江淮梅雨入梅及發展過程中均有指示性意義,在南海季風爆發以後,在中國東南部地區,轉化項的大小與夏季風的活躍和中斷等活動有著幾乎一致的變化規律,這從側面也指出了,此轉化項的變化是夏季風演變所具有的本質特徵,並且它反映出了西太平洋副高在中國大陸的活動情況。
  6. The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4

    3 .通過溫控研究,簡化了溫控措施,加大了澆築寸,加快了施工,閘壩竣工比原計劃提前了6個月。
  7. D. the material - radian size and injection plastic machine nozzles radian match

    D .主料口弧寸與注塑機噴嘴弧相配。
  8. By a chip microprocessor, with the foil - feeding rubber roller of electrochemical aluminum driven by the separately set length and leapfrog parameters to make the most effective using of electrochemical aluminum. the purpose of this model is to ensure that the system runs stably and reliably so that the machine can be maintained by anybody

    本機由單片微程序控制,電化鋁的走箔膠輥由步電機驅動,用戶可同時使用兩組或三組步電機,並可根據印箔的不同寸設定電化鋁走箔的長寸和跳步參數,實現電化鋁最有效的利用。
  9. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題行了分析和總結,結合青居水電站閘壩工程,開展溫應力及溫控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築寸,簡化施工程序,加快施工,節約工程費用。
  10. When you put all the good attributes on the scale and you try to balance all the irritating traits such as the radio which was always too loud, the haircut that wasn ‘ t to our liking, the dirty socks under the bed, etc., the irritations don ‘ t amount to much

    當你將他所有的優秀品質和所有的氣人的方面,比如收音機總是開得太大聲、發型不是我們喜歡的、和床下的臟襪子等等,都放在刻行衡量時,就會發現令人生氣的並不很多。
  11. 423 persons answered the questionnaires and 139 out of them were identified as ecotourists. the result of classification is proved to be effective by prediction validity test, content validity test, theory validity test and convergence validity test. in addition, the ecotourists were classified as hard ecotourists, frequent ecotourists and occasional ecotourists farther according to the times they traveled to nature - based destinations every year and their new ecological paradigm grade which is used to evaluate the visitors attitude to environment. frequent ecotourists and occasional ecotourists both fall category of soft ecotourists, so the " hard - soft " classification system is founded, which will help propel ecotourist studies in china to develop towards the current international mainstream of the field

    以北京市百花山自然保護區為例,在總結國外相關研究經驗的基礎上,採用k階最近鄰knn和反向傳播bp前饋型多層神經網路所構成的綜合分類器對百花山遊客中的生態旅遊者行識別,又根據「每年去相對原始的自然區域的旅遊次數」和環境態nep得分兩項指標將生態旅遊者一步細分為嚴格的生態旅遊者經常的生態旅遊者和偶爾的生態旅遊者,其中經常的生態旅遊者和偶爾的生態旅遊者歸為一般的生態旅遊者,從而構建起嚴格的一般的生態旅遊者分類體系。
  12. With checking and optimization, some rational suggestions on bridge location, shape and overall arrangement is put forward. after construction checking, the author also puts forward some requests for construction pre - cove and safety pier setting, at the same time gives optimum design on joint balance pier. construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent, but also the section size

    通過驗算及優化,對該橋推薦方案的橋址、武漢理工大學碩士學位論文橋型及橋梁總體布置提出了合理化的建議;通過施工驗算,對施工預拱及保險墩的設置提出了要求,對交界平衡墩行了優化設計;施工結構驗算表明,轉體勁性骨架強、穩定性富餘系數較大,截面幾何寸過大,結構設計過于安全保守,並提出了結構優化的方法,從而大大節省了工程投資,加快了工程,增強了橋梁的美觀。
  13. The main function of the oil monitoring system to ship power system & device is : analyzing the change of the parameters of oil quality, monitoring the inferior change of the oil quality. analyzing the debris in the oil sample, search after the affiliation between the character ( component, concentration, size and distribution, shape and distribution, color etc ) and the wear condition and the failure of the part of the device. study the affection of the contamination in the oil to the performance and condition of the device

    船舶動力裝置與設備油液監控系統的主要功能是:通過分析油液的性能指標變化監控其劣化狀況;通過對油樣中的磨粒等污染物行檢測和分析,根據磨粒特徵(成分、濃寸及寸分佈、形狀及形狀分佈、顏色等) ,推斷設備磨損狀態、磨損部位和嚴重程,以及污染物對設備性能、技術狀態的影響;為油液的管理和使用,以及船舶動力裝置與設備的修造、檢驗等提供科學的建議。
  14. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍堰后消力池的寸;驗證泄洪初期壩面高程是否能夠滿足消能防沖需要;計算下游圍堰堰頂高程,使其滿足泄洪期圍堰和壩體過流的消能防沖和工程的需要;計算部分斷面平均流速,包括:上游圍堰后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長
  15. This paper, based on collecting many empirical determinations of strength parameter for jointed rock masses all over the world, puts forward the improved empirical determination of strength parameters, that is to say, " size effect reduction factor " and " jointed rock reduction factor " of the intact rock specimen for the study on jointed rock mass strength parameter, and applies to the a typical location of the dam, which proves that this methodology is feasible and rational, and a new way for study of strength parameter in jointed rock masses is established

    在大量收集國內外節理巖體強參數經驗確定方法的基礎之上,提出了改的節理巖體強參數經驗的確定方法,即對完整巖石行「寸效應折減」與「節理化折減」的二次折減法,並應用於某壩址區工程實例中,所得的計算值與現場實測抗壓強值接近,較以往的經驗確定方法更加準確,證明了節理巖體強的降低是寸效應與節理化綜合作用的結果,為節理巖體強參數的研究提供了一條新的思路。
  16. The other is the local cosine bases developed as a kind of orthogonal basis based on the fourier analysis and wavelet - packet theory. in this thesis, theoretical analysis and numerical applications are mainly focused on the beamlet - domain wave field extrapolation using g - d frame propagators. the whole thesis consists of six chapters

    通過對具體信號的分析,對不同變換方法的信號表示效率行了對比,並總結了g - d框架及對其擴展組成的gabor函數族在應用於波場相關的研究中時,優于其它正交分解方法的特性。
  17. The focus of the second episode will be a reflection of the threats to personal privacy posed by internet and technological developments. the third episode turns to the employer - employee relationship and explores the extent to which personal privacy is to be respected with regard to work locations. with a macro - perspective, the fourth episode will examine hong kong s progress in the protection of privacy and explore the existing contradiction and balance to be struck between personal privacy and public interests

    一連四集的私隱事件簿透過戲劇與個案演繹,分別反映私隱被侵犯或非法盜取個人資料的各種情況:第一集重點在於消費與商業活動中的私隱問題;第二集將集中反映網上及科技的發展對私隱造成的威脅;第三集討論僱主與雇員之間,在工作地點方面私隱應受尊重的;第四集則從宏觀角,探索本港在保護私隱方面的,及研究私隱與公眾利益之間的矛盾及平衡。
  18. Fitness scaling was proposed to fight the premature convergence of ga. in fact, the existent fitness scaling does not fulfill the desire. the paper let it be more reasonable

    對適應變換的研究,人們為了避免早熟收斂,提出了適應變換的調整方法,但實際上已知的調整方法並不能滿足要求,本文對此行了更一步的分析,提出了合理的適應變換法。
  19. In this paper, a method for evaluating the order of coriolis force term is suggested by nondimensionalizing the governing equations of tidal current, the scale analyses are made for several typical chinese bays, the errors due to the neglect of geostrophic action in making the physical simulations are calculated, and the practicability of physical model experiment for these sea areas is then discussed

    從潮流基本控制方程出發,通過對方程的無因次化,給出評價柯氏力作用大小的方法,並就中國典型的海灣分析,量化物理模擬時因地轉缺失引起的偏差程,討論在這些海域是否可以付諸物理模型試驗。
  20. New layout elements, including a calendar control, an address card, a flexible datagrid, gauges and progress meters, drag and drop, and menus

    新的布局元素,包括日歷控制項、地址卡、靈活的數據網格、標條、拖放、菜單
分享友人