進水進程線 的英文怎麼說

中文拼音 [jìnshuǐjìnchéngxiàn]
進水進程線 英文
inflow hydrograph
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 進水 : admission pipe
  • 進程 : course; proceeding; process; progress
  1. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國資源狀況和旱災害、說明庫汛期限制位動態控制研究的必要性;介紹了傳統汛限位設計、汛限位靜態控制、模糊汛限位過存在的問題及其初步改方法;分析汛期限制位動態控制的方法及關鍵問題;一步闡述了庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制位下起調,庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄流量的汛限位動態控制的極限風險率」 。
  2. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下資源可持續開發問題行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀行了述評,並對「可持續發展」概念的科學內涵行了深入探討;對涉及地下資源的一些最基本的概念和命題行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下資源變值系統理論的內容和意義,並與傳統的地下資源計算評價方法行了對比分析,結合實例具體說明了方法的應用;深入分析了地下資源預測預報工作的極端重要性和復雜性,對傳統的地下資源動態預測方法行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱行了介紹,並應用於地下動態過的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下資源變值系統理論相結合,探討了地下動態資料分析和地下資源預測預報的新思路;綜合分析了現今各類地下管理模型的特點及缺陷,將數學規劃、數理統計、隨機過等與地下變值系統理論相結合行地表地下或多源的聯合優化調度,使模型更準確、更實用;對保證地下資源可持續開發的內部條件和外部條件行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節意識的增強及具體節措施、人口增長的控制、體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下資源的可持續開發;指出了地下資源可持續開發的一步研究方向。
  3. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工情況,採用2d - 3d -有限元結構分析序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖和4個垂直剖等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖的應力_ 1 、 _ 2和_ ( xy )對比分佈曲; ( 3 )不同狀態下相同平或垂直剖的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工設計和工施工提供參考依據。
  4. Observed tidal harmonic constants in many stations are used to verify the astronomical tides in the compound fluid model. the wave model is tested by a set of wave flume data at first. then the results are compared by the actual processes of significant wave height in gauging stations

    其中復合流場模型中的天文潮利用眾多測站的實測調和常數行驗證;波浪模型首先行了槽實驗的檢驗,然後在臺風過中,行了測站有效波高過的比較。
  5. Nowadays, our company applied many international advanced technology in production equipments, from aluminum pole casting, mould design, profile extrusion, even spraying, anode oxidation, mono - bino alkali dyeing, electrophoresis coating, color powder spraying, fake wooden texture to exact test, which automation level is high

    目前,我公司從鋁棒熔鑄,模具開發,型材擠壓均勻噴沙陽極氧化,單雙鹽著色電泳塗裝多彩粉末噴塗模擬木紋,以至精密檢測等生產和設備均採用了國際先技術,自動化度極高,使產品質量達到了世界一流的先平。
  6. Universal type that guangzhou dongchen electric vehicle co., ltd develop the latest electric car mix with the motive to become soon the green environmental protection motor car, it broke the traditional consciousness, the way that whole car lines that tradition of limitless become soon, that car have the zero row to put, free from pollution, have no the noise, mentally retarded consume, start steady, long drive route, excellent climbing ability, the special advantage of low etc., function index sign of movement cost is already the advanced level, it broke the tool of traditional transportation means of transportation flowing freely of world, now a humanities culture for be in the leading, a nature consciousness for be in the leading

    廣州東辰電動車有限公司最新款的普及型混合動力變速綠色環保電動車,它打破了傳統的無極變速方式,該車具有零排放、無污染、無噪音、低能耗、起動穩、行長、爬坡力強、運行成本低等獨特優點,性能指標已達世界先平,它打破了傳統交通代步工具的局限意識,整車條流暢,體現一種領先的人文文化,一種領先的自然意識。
  7. This project focus on r & d of remote information transfer between some device, especially in the water - quality monitoring system. after learning the architecture of the popular pstn dial - up network. vpn broadband network and gsm wireless network, a new solution for remote communication was proposed. under this idea frame a communication hardware platform and software was developed

    本課題主要針對環境質在監控系統中的信息傳輸問題,對遠距離設備之間的信息傳輸方式及發展行了研究,結合目前流行的pstn撥號上網方式、 vpn組網技術和gsm無數字通訊技術,提出了一種新型的遠設備之間信息傳輸與互聯的方案,並按照這個思路搭建出系統所需的硬體平臺,設計出實現這個方案的應用序。
  8. With the numerical solution, an internal condensation critical curve can be calculated out by condensation theory and depositing theory, on the curve, the enter water ability equal to the out water ability, which can be used as the basis to determine the occurrence of internal condensation. but the result doesn ’ t coincide with the real completely. in this dissertation, we plan to get the critical curve by practical experiment results, because that the enter water ability only relates to the condensation density and the out water ability only relate to the volume ratio of the pneumatics system

    然而由凝結理論和沉積理論得到的計算結果往往與實際有一定偏差,本課題希望通過實驗的方法獲得內部結露臨界,即系統能力和排能力相等的曲,由於系統的能力和充放氣過中凝結滴密度有關,排能力和系統容積比有關,可以通過大量實驗總結出以凝結滴密度和容積比表示的內部結露臨界曲,作為判別內部結露是否發生的依據。
  9. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工中的發電引隧洞運行的各種工況行了工模型試驗研究,指明要獲得良好的流流態,過建築物各部位結構輪廓的造型應適應流流的收縮、流速及壓強的變化;為使引隧洞在各級引流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  10. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工的發展與國內外圍海的開發現狀,重點介紹了我國目前圍海工的特點及在圍海工實踐中積累的經驗和理論;利用fortran語言完善堵口工龍口力計算序,使序可以滿足圍海工復雜工況下(如考慮內港洪、計算時段的變化、多口門、多庫容、多閘)的龍口力計算,並行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編語言vb行界面開發,使計算過有良好的人機界面,更直觀地對計算結果行分析和處理;計算結果的后處理採用vb編實現龍口力要素最大值等值圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工行龍口力計算,為堵口合龍提供科學依據。
  11. In order to solve this contradiction, reservoir engineering methods are used to estimate the exploitation process about the block, which including water drive curve method, the correlation experience method, the method of the flow pipe budgetary estimate and the method of well net density. on the basis of these method, the author studied the macrocospical distributing of remaining oil in each layer

    針對單元開發過中存在的突出矛盾,運用驅曲法、相關經驗公式法、流管概演算法、合理井網密度法等油藏工方法對斷塊的開發歷行評價,在此基礎上行各小層剩餘油的宏觀研究。
  12. In this paper, some characteristics of flow movement and sediment transport are analyzed by using the flume experiment data. the cross section of compound channel can be divided into four regions : the undisturbed region in main channel, the interactive region between channel and plain, the undisturbed region in flood plain and the boundary region. in the undisturbed regions, the distribution of longitudinal velocity along the depth has the feature of lograithmic. whereas, in the interactive region, the longitudinal velocity does not obey the logarithmic distribution law, but it can expressed as a revised logarithmic function by using a wake function. on the basis of the kinematic equation the velocity distribution of transverse velocity is obtained. in the boundary region, the longitudinal velocity obeys the law of parabolic distribution. furthermore, according to the simplified diffusion equation, the transverse distribution of sediment concentration in the interactive region is deduced. the analysis is in good agreement with the measured data

    本文根據漫灘流的運動特點,將漫灘流的復式斷面分為主槽平衡區、灘槽交互區、灘地平衡區及邊壁區等4個區,並給出了各區寬度的經驗公式.根據灘槽交互區垂流速分佈的變化特點,提出了附加尾流函數的對數流速分佈公式.在簡化流運動方和泥沙擴散方的基礎上,對灘槽交互區內垂平均流速及含沙量沿橫向分佈行了理論分析,提出了反映灘槽流動量交換強度的橫向渦量粘性系數及橫向擴散系數的表達式,得到了漫灘流垂平均流速及含沙量沿橫向分佈的解析解,並與實測資料吻合較好
  13. High - qualified designers and engineers of chaowei are able to provide various high - qualified design services such as ic software program, circuit board, product appearance, products structure, and product package, etc. the factories directly under chaowei have advanced production abilities including mould making, inection moulding, surface spray - painting, silk - screening, shift - screening, smt, welding and assembling, quartz clock core production, and quality check and assurance. chaowei held many design patents and utility model patents, at the same time, national clock and watch quality certification, national technical supervision bureau certification, usa fcc and astm security authentication, canada ic, and euro ce are achieved, the rich experience in oem and odm can ensure high quality products and professional service

    超維公司擁有一批高素質的專業設計師和工師,有能力為國內外客戶提供包括ic軟體編路板設計產品外觀設計產品結構設計產品包裝設計等多方面高準的設計服務超維的直屬工廠則擁有模具製造注塑成型表面噴漆絲印移印smt焊接裝配石英鐘機芯製造品質檢驗測試等先的生產能力超維公司的產品擁有大量的外觀設計專利和實用新型專利,同時獲得了國家鐘表質量檢驗中心的合格證書國家技術監督局檢驗合格證書美國fcc認證和astm安全認證加拿大ic認證歐盟ce認證。
  14. Equation of water surface curve along uniform distributing water trough of peripheral feed sedimentation basin

    周邊沉澱池的沿均勻配面曲
  15. Numerical models are frequently used to simulate water flow in hydraulic engineering. shallow water equations are basic governing equations with assumption of the velocity distribution uniformly in vertical, so they have some limitations on the simulation of some plane flows, such as wind - induced flow, curve river flow and flow nearby the submerged dikes. for above - mentioned reasons, extended shallow water equations are developed by introduction of momentum coefficient, correction of convection and bed resistance in equations of motion

    利工中經常需要採用數學模型模擬流的流態,淺行平面流態模擬計算的基本控制方,但因其忽略了流速垂分佈的不均勻性,在模擬某些平面流態(如風生流動、河灣流、潛壩等工附近的流動)時存在一定的局限性。
  16. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法行了有關時間變態率的系列試驗,通過模型位、比降、流速、出口流量過和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種力參數偏離的主要物理原因:模型的槽蓄響應和洪時間變化率的響應滯后。
  17. Based on advanced technology, this thesis bring forward the optimal scheme and set down general system - drawings and flow charts. using step7 - micro software, we achieve the auto - control aim in drinking water treatment. in practice, the complexity and non - linaerity exit in the system of water treatment, so we apply fuzzy control in water treatment and design a kind of controller which structure can be altered according to the using - rate of ozone and the variety of water quality

    實際飲用處理系統由於存在復雜性、非性、時變性,本文根據臭氧生物活性炭處理工藝存在復雜性、非性、時變性等特點,將模糊控制應用在處理這一不確定的非性時變系統,針對不同溫下臭氧利用率及質的變化,設計一種基於系統過狀態的變結構的模糊控制器,以單片機作為主要控制硬體,按查表方式設計軟體,對閥門開度行在控制,調節臭氧氣體與的比例(臭氧流量及濃度不變) ,達到氣比最優化。
  18. By use of many years ' hydrologic data, the max, water quantity dated from every day may be counted in every year ' s flood season, and the designed water quantity corresponds to the definite frequency

    滑動汛期位在多年資料基礎上,通過統計汛期中每日為起點的最大來量,求出固定頻率的設計來量,選擇合適的典型洪行調洪計算后得到每天的汛限位。
  19. The first part is about the computing of crop water requirements ( or crop evapotranspiration ) and net irrigation requirements ( nir ) of ten crops in bojili irrigated district. then the traditional irrigation schedules of winter wheat and summer maize, which are the main crops in bojili, were evaluated with simulating model isareg. third, the field application efficiency in the experimental areas was evaluated from three methods

    本文即是由灌區實測資料計算各種作物需量,推求其凈灌溉需量;然後通過模型檢驗現行作物灌溉制度是否具有合理性,並對田間灌溉系統行評價,求其實際田間灌溉效率;最後由兩種不同灌溉制度方案的對比,確定試區合理的作物灌溉制度,在此基礎上求出各代表年的田間灌溉需量和用
  20. Taking practical situation of this project and much engineering experience into account, the scheme with axle golden section elliptical arc surface is proposed through comparing nine optimization schemes with model test

    結合工實際和以往經驗,比較了9種口曲型式的試驗結果,確定了長短軸黃金分割比的橢圓弧面的方案。
分享友人