進水建築物 的英文怎麼說

中文拼音 [jìnshuǐjiàn]
進水建築物 英文
intake construction
  • : 進構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 進水 : admission pipe
  1. It can also restrain the decomposition of organic substances in the soil and the bind of nitrogen, and wash away the nutritious elements, such as magnesium, calcium, and potassium. the acid rain deprives the soil. it acidifies the rivers and lakes, and dissolves the heavy metal in the soil into water, therefore poisons the fish

    它可以直接使大片森林死亡,農作枯萎;也會抑制土壤中有機的分解和氮的固定,淋洗與土壤粒子結合的鈣、鎂、鉀等營養元素,使土壤貧瘠化;還可使湖泊、河流酸化,並溶解土壤和體底泥中的重金屬中,毒害魚類;加速和文古跡的腐蝕和風化過程;可能危及人體健康。
  2. 1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained

    對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、在使用階段的沉降分析; 3 、在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖施工過程分析; 6 、同一個地方沖量大小不同對沉降影響分析; 7 、不同沉井沖沉降影響分析; 8 、深不同的土層沖沉降影響分析; 9 、不同埋深土體沖沉降影響分析。
  3. There was now visible a house or houses - for the building spread far - with many windows, and lights burning in some ; we went up a broad pebbly path, splashing wet, and were admitted at a door ; then the servant led me through a passage into a room with a fire, where she left me alone

    這時看得見一間,也許是幾間房子,因為那鋪展得很開,上面有很多窗子,其中幾扇里亮著燈。我們踏上一條沫飛濺的寬闊石子路,后來又了一扇門。接著僕人帶我穿過一條過道,了一個生著火的房間,撇下我走了。
  4. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律行了有限元數值分析計算,探索了地下空間圍巖與高層或多層地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層地下開挖硐室時的工程設計和工程施工提供參考依據。
  5. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已及籌的白山大泵口,選定墊塘的總體布置方案。
  6. Intake tower, as a sort of waterpower engineering, have complicated figure structure, boundary conditions and load situation

    塔是一種體型結構、邊界條件和受力情況比較復雜的
  7. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要行了富電廠發電口閘門啟閉機平臺安全檢測,依據現行規?對其行了設計與施工復核、結構的強度復核和的裂縫成因分析。
  8. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引渡槽、節制閘、閘、泄閘等組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過流能力也要經試驗確定,為碧流河庫增旁通管設計提供依據。
  9. So the topic for farther discussion will be developed on the ground of soil - foundation - structure interactions, and em phasizes particularly on the investigation for dynamic effects on interaction of pile - supported structures subjected to lateral seismic load at layered - soil media. it will provide engineering application with practical and concise computational method, but also provides the aseismatic design for pile - supported structures with proper theory foundations and schemes to some extent on condition that definite codes are absent at present. the full article is divided into six chapters, as follows : 1

    本論文工作將圍繞地基-基礎-上部結構共同作用這一課題作一步探討,側重於平地震作用下層狀地基土中的樁基-的動力相互作用的研究,為實踐應用提供了適合於工程目的的、比較簡捷的實用計算方法,亦擬為沒有明確規范指導的樁(土)基礎-結構抗震設計提供一定的理論依據和設計議。
  10. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了的整體性和耐久性。
  11. The recommendations assume that, in the aftermath of major hurricanes or floods, buildings wet for > 48 hours will generally support visible and extensive mold growth and should be remediated, and excessive exposure to mold - contaminated materials can cause adverse health effects in susceptible persons regardless of the type of mold or the extent of contamination

    議假設在颶風及災之後,浸泡於中超過48小時,將會滋生許多?菌,應行公共衛生介入,且大量暴露于?菌污染的質,不論?菌的類型或污染程度,對較敏感的人可能造成健康危害。
  12. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某閘工程在施工過程中擋墻及邊墩產生的裂縫,行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對的危害程度,提出了相應的控制措施,較好地保證閘正常運行的功能。
  13. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流的等級、工布置。通過力學計算、結構設計、導流方案投資比較、度分析和投資風險分析,說明了四湖溝利樞紐工程採用圍堰擋汛后時段洪導流方案的合理性和經濟性,為施工決策提供理論依據。
  14. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引隧洞運行的各種工況行了工模型試驗研究,指明要獲得良好的流流態,過各部位結構輪廓的造型應適應流流線的收縮、流速及壓強的變化;為使引隧洞在各級引流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  15. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    施工詳圖階段,設計單位根據創節約型社會的宗旨,積極開展一系列技術創新和優化設計工作,並首創了廠房尾管肘管段分離式底板新技術,優化設計后樞紐布置更加緊湊,結構形式更為合理,加快了施工度,節約工程投資約1 . 37億元,綜合效益顯著。
  16. Through a systematic research, the author enter to provide the theoretical basis for selecting reasonable index of normal frozen - heave forces and the technology for preventing and controlling frozen damage

    通過系統研究,渴望為季節凍土區涵閘類基礎板的設計部門提供法向凍脹力值的設計指標,以便做到基礎的合理淺埋和行抗凍脹設計。
  17. In the end, the standard partitions the grades of obstruction traits. the river hydrotechnic obstructions assessment program plans the assessment program for common hydrotechnic buildings roundly and establishes the strict review system

    內河工礙航礙航評價工作程序較全面地規劃了一般行礙航評價的工作流程,制定了較嚴密的礙航評審制度。
  18. This dissertation analyzes the characteristics of hydrotechnic obstructions. and it uses the achievement in scientific research there have been and the standards there have been issued, chooses the appropriate contents and the appropriate objects to study. form the analysis, the dissertation evaluates the water traffic safety degrees effected by hydrotechnic obstructions, makes the main indexes that effect obstructions degree quantificationally, finds out the optimal using state for navigation resources

    論文從分析內河工礙航礙航特性出發,借鑒國內已有的科研成果或已頒布的標準,擇其合適的內容,選擇合適的對象行研究,分析、評價、認定工礙航上通航安全的影響程度,將判斷工礙航礙航程度的主要指標量化,尋求通航資源的最佳利用狀態,使的規模在滿足航運發展的前提下得到合理控制。
  19. The comparative analysis is made firstly, which shows that the truss arch aqueduct can be built on the weak foundation and is also satisfied with the demand for large span length and the great discharge ability, so the type of aqueduct is a better for the project. then the finite element program ( super sap93 ) is applied to the structural analysis of the space structure

    首先通過對常用渡槽結構型式的對比分析,闡明該渡槽是一種可在軟弱地基上修的、能滿足大跨度、大流量要求、適用於南北調中線工程的排,然後運用有限元分析程序supersap93對桁架拱空間結構行了受力分析。
  20. All water conveyance and water discharge structures are designed to locate at right bank strip ridge, due to special topography and land form. large excavation area and steep slope raising from close plan locations of adjacent structure lead to slope stability. in general, slope stability analysis and treatment are concerns of zipingpu project

    由於其特殊的地形、地貌,工程的各輸、泄共7條隧洞均布置在右岸條形山脊內,各相鄰出口的平面位置距離較近,開挖范圍大、坡度高且陡,存在著大量因開挖而形成的高邊坡穩定問題。
分享友人