過度延遲 的英文怎麼說

中文拼音 [guòyánchí]
過度延遲 英文
excessive deferral
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ形容詞1. (緩慢) slow; tardy; dilatory 2. (晚) late; delayed 3. (遲鈍) slow; obtuseⅡ名詞(姓氏) a surname
  • 過度 : excessive; over; undue; ana-; hyper-
  1. In this thesis, the development of emulsion polymerization theory and related new technologies are comprehensively reviewed, and the synthetic technologies of acrylate latex modified by organosilicon both at home and abroad are also reviewed. based on the current development and research in this field, attentions of this study are focused on three ways for preparing novel acrylate latexes modified by organosilicons, that is, 1 ) the acrylate monomers are copolymerized with unsaturated silicons by emulsion copolymerization ; 2 ) a new latex with microphase separation morphology is synthesized, which shows a core - shell structure character ; 3 ) soap - free polymerization is explored for preparing a higher - performance latex using an unsaturated silicon monomer, different acrylates and a reactive emulsifier. by using techniques of delaying addition of organosilicon monomer and a hydrolysis inhibitor, the hydrolysis and condensation of 3 - ( trimethoxysilyl ) propyl methacrylate during polymerization can be effectively prevented, as a result, organosilicon content in the macromolecular chain is increased

    同時採用有機硅單體滴加及添加水解抑制劑等技術,有效防止了-甲基丙烯酰氧基丙基三甲氧基硅烷在乳液聚合程中的渡水解及縮合反應,提高了聚合物大分子鏈中有機硅鏈節的含量;利用紅外光譜與差示掃描量熱儀對產物分子結構進行了表徵,並通對共聚產物力學和吸水率的測試,證實了本研究所制備的有機硅改性丙烯酸酯共聚物具有比純丙烯酸酯聚合物更優良的力學及耐水性能;從分子設計角出發,利用醇解反應合成出水解、縮合反應速率較慢的兩種新型不飽和有機硅單體: ?甲基丙烯酰氧基丙基三乙氧基硅烷和?甲基丙烯酰氧基丙基三異丙氧基硅烷;利用核磁共振對新型硅烷單體結構進行了證實;研究表明利用新型硅烷單體可以制備出高硅烷含量的有機硅改性丙烯酸酯乳液,且其聚合產物具有較高的力學及耐水性能。
  2. A th - 1025 thoron source made in pylon company of canada was adopted. thoron gas is mixed with circulation gas before they are input into the thoron accumulation box. the thoron level in the thoron accumulation box can be adjusted by changing the gas flow rate through the thoron source, or adding different volume of delay boxes in source input circuit, and me

    簡易(氣土)室採用加拿大pylon公司生產的th - 1025型流氣式固體(氣土)源, (氣土)進入積累箱之前先與循環氣流混合,積累箱中的(氣土)濃可以通改變流經(氣土)源的氣流流率或在充源迴路加不同體積的瓶加以調節。
  3. In the second place, based on the asu of buggenum igcc plant in netherlands, both static and dynamical model for distillation tower of the asu are created and some valuable conclusions are gained as well. finally, a compartmental simplified model is created for distillation tower of the asu, in order to reduce the simulation time and increase the simulation efficiency. the new model will be helpful to the further simulation and on - line optimal control for the asu of the igcc plant

    其次,本文以荷蘭buggenum電站的空分系統為原型,基於matlab建立了空分系統精餾塔的半圖形化動、靜態數學模型,並通模擬,得出了一些有價值的結論:當空分系統的壓力變化時,氧氣產品濃的響應時間常數為兩小時左右,說明空分系統是igcc電站最大環節;而且雖然氧氣濃最後會穩定在igcc電站所要求的范圍之內,但在程中會超出限制,這些都為igcc電站的安全運行及控制系統設計提供了有價值的信息。
  4. The considerable delay in change of superheated steam temperature with respect to distrubance of desuperheating water flow, however, leads to the lagging in superheated steam temperature control and as a result the control effect is not satisfying

    由於熱蒸汽溫在減溫水量擾動下較大,這種特性使熱蒸汽溫的控制滯后,控制效果不理想。
  5. The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays

    安全庫存的存在能夠覆蓋在一個補貨提前期之內的的物料消耗,同時也能覆蓋可能出現的由於交貨導致的任何額外的需求。
  6. A time measurement for a given computer word to pass a given point as in serial storage delay - lines. all of the bits of a word must pass through the input control gate ; the beat is then the sum of all the bits times

    在串列存儲線中,計算機字通某指定點的一種時間量。該字的所有位必須通輸入控制門,拍則是所有位時間之和。
  7. Because of the depth and breadth of information being indexed, there is usually a delay, sometimes up to several weeks, between the time when a site has been " spidered " and the time when it appears in a search index

    由於已編索引的信息的深與廣(非常大) ,所以通常在「蜘蛛爬行」站點的時間與出現在搜索索引中的時間之間有一個,有時多達幾周。
  8. In general, delayed or distorted pulses, excessive plateau slope, raised working voltage, or failure to count at all are likely results of negative ion formation.

    一般說來,或畸變脈、的坪斜、工作電壓的升高和不能計數,都可能是負離子形成的結果。
  9. Based on these models, a main - road traffic flow model with two speeds on one dimension is designed. this model simulate the situation of one road in the city, traffic lights placed on the crossing, using the computer simulation, firstly, in the case of synchronized traffic lights, we investigated the velocity and flow of the model when the initial density, the turning probabilities, the number of the traffic lights, the green to signal ratio and the period of the signal are changed, then we have advanced some meliorate measure to traffic flow ; secondly, in the case of the traffic lights " signal update delay in turn, we found the optimal matching between the period of the signal and the delay time of the traffic lights so as to the perfect velocity and the flow of the model are attained

    在此基礎上,建立了一維二速主幹道模型,該模型模擬了城市交通中一條主幹道的交通情況,在交叉口處設置紅綠燈,通計算機模擬,首先,在交通燈信號同步更新的條件下,研究模型在改變車輛的初始密、轉向概率、交通燈個數、紅綠燈信號的綠信比、紅綠燈信號周期等各種情況下主幹道的速、流量的變化,根據模擬結果提出一些改善交通的有效措施;其次,在交通燈信號依次更新的條件下,研究模型在參數道路長、紅綠燈綠信比、交通燈個數、車輛的初始密給定的情況下找到紅綠燈信號周期和時間的最佳匹配使得主幹道的速、流量達到最理想的值。
  10. Despite recent pledges to cooperate to end the humanitarian crisis the u. n. has called the worst in the world, the u. n. said the sudanese government has hampered access to hungry darfuris by restricting relief flights and causing " major delays " in deployment of aid workers

    盡管近來的保證,要協力終結這項聯合國宣稱世界上最嚴重的人道危機,聯合國表示,蘇丹政府透限制空投飛機,導致救援人員的調受到很大的,來阻礙世界各國的關注。
  11. Here a delaying - allocation optimizing strategy is proposed, it adopts a coarse - grained adjustment of the stack frame. at the call site allocations, the caller ’ s stack frame is reduced according to the actual usage while the callee only be allocated a limited stack frame, consequently, the potential spill is reduced to the best advantage

    本文提出一種基於分配的棧寄存器分配策略,為了減少額外代價,採用粗粒的棧幀調整策略,在調用點處使用alloc指令調整調用者的棧幀大小,並為被調用程分配部分棧幀,在調用點處從調用者和被調用者兩個角盡量縮減各自的棧幀,從而減少棧幀的溢出。
  12. Firstly two characteristic points of the open - loop frequency are identified based on relay feedback experiments : the ultimate point and the bandwidth point

    繼電反饋辨識系統開環帶寬點和臨界點,利用帶寬點的信息建立一階加純模型。
  13. To delay a task with an overallocated resource

    如果要含有分配資源的任務:
  14. When the silicon technology comes to deep sub - micron level, the interconnect delay exceeds the gate delay ; and because of the increase of 1c work frequency, the allowable errors become smaller, and the influence of the transmission delay gets bigger, which increase the difficulty of the circuit design

    在深亞微米製造技術中,晶元互連線,而且隨著集成電路工作頻率的提高,允許的時序容差變小,傳輸的影響加大,設計工作難增加。
  15. Secondly, ground on the duct noise control, the delayed - lms algorithm, which is actulized easily, is brought forward, then the simulation on pc is achieved. it is shown from the computer simulation that for the single frequency noise, there will be a good effect when choosing the suitable parameters ; but for the narrowband noise, the effect will become worse with increasement of the bandwidth. this result is helpful to analyze the parameters influencing anc

    結果表明: ( 1 )隨著濾波器長的增大,系統收斂速變快; ( 2 )隨著值的增大,系統的收斂速增大,但是當值超某一范圍時會引起系統的發散; ( 3 )次級通路的數與初級噪聲頻率有關; ( 4 )對于窄帶信號, dlms演算法可以取得一定的降噪量,但是隨著窄帶信號帶寬的增大,降噪效果明顯變差。
  16. Result : burn complicated by hyperglycemia was related to delayed resuscitation and overdose of glucose during shock stage, large area deep burn and severe infection

    結果:燒傷並發高血糖癥與休克復甦,休剋期量補充葡萄糖,大面積深燒傷,嚴重感染等因素有關。
  17. The result of macro - quality experiments show : mineral admixtures markedly slow the hydrating velocity of cement slurry, decrease and delay the hydrating max - temperature, in which steel slag is more effective ; expansive agents compensate concrete shrinkage, enhance the concrete dense degree, strengthen the interfacial layer between fiber and cement matrix and improve the physical mechanics qualities of acic ; minimal admixtures markedly improve the concrete workability property, increase the concrete later intensity & density and the capability of anti - chemical attack and anti - permeability ; hybrid fiber reinforces the toughness of obviously acic by the means of anti - cracking effect of fiber with different sizes and different properties in the corresponding construction levels

    實驗結果顯示:鋼渣摻合料能顯著減緩水泥漿體水化速率,降低砂漿的水化溫升並最高溫升時間;補償混凝土收縮,提高混凝土密實,加強纖維與水泥石的界面粘結,增強混凝土力學性能,但不能明顯改善混凝土韌性。混雜纖維通纖維的不同尺與不同性質在相應的結構層次上產生阻裂效應,增韌鋼渣防滲抗裂混凝土;增加混凝土的破壞極限能,極大提高混凝土抗彎曲能力和韌性指數,改善混凝土脆性。
  18. Using the model dividing technique, the virtual scene is divided into small - scale sub - scenes. meanwhile, by combining the different transferring sequence of sub - scenes, this could not only reduce the network delay, but allow the combination of sub scenes in any sequences so that users can choose their own path to follow

    結合模型分割技術,將虛擬場景分割成小規模的子場景,這樣即有利於降低網路,同時通組合子場景的不同傳輸順序,打破流式傳輸的固定路線傳輸,在一定程上滿足用戶挑選路徑瀏覽的需求。
  19. Thirdly, through assaying the error generated during measuring data, the result manifests : 1 ) the location installed of the transducer and the point thumped affects the experiment result to some extent. if surface - opening cracks is deeper, the location of the transducers installed and the point thumped should be further away from the location of surface - opening cracks. 2 ) when the depth of surface - opening cracks is near to 50mm, it is very difficult to measure the depth of surface - opening cracks because the depth of r _ wave conveying in concrete plates from the different small ball bringing forth exceeds 50mm. 3 ) it is clear from the experiment result, the influence is n ' t big for the diameters of small balls to measure the data while the time interval between two transducers touched firstly has very big influence on the result

    其次,對測量數據進行了誤差分析,結果表明: ( 1 )傳感器及敲擊點的位置對實驗結果有一定的影響,當開口裂紋的深較深時,傳感器和敲擊點的位置應該離裂紋較遠; ( 2 )當開口裂紋深接近50毫米時,由於實驗中所使用的小球產生的r波傳播深均超50毫米,故很難測量出其開口裂紋的深; ( 3 )實驗發現,小鋼球直徑的大小對裂紋深的測量結果影響並不是很大,但是,波的開始上升和下降點的測量精(即兩信號的時間) ,對測量的結果有很大的影響。
  20. One way, linux kernel can be modified directly to reduce the schedule latency and this is so - called soft real - time. the other way, the so called sub - kernel idea can be adopted, which adds an extra real - time kernel besides linux kernel. the real - time kernel is in charge of managing and scheduling all the real - time tasks and linux kernel is treated as a real - time kernel ’ s task with the lowest priority

    一種是對標準linux內核進行直接修改,通減小操作系統的調,優化linux的實時性能,達到軟實時的標準;另一種是採用雙內核方案,增加一個實時內核,所有有實時要求的任務都在這個實時內核上運行,標準linux內核作為這個實時內核優先級最低的一個進程,這種方式可以實現硬實時。
分享友人