  1. Material and methods normal rats of male sd were divided into young, adult, and aging groups. preparation of samples for light microscopy : animals were anesthetized by peritoneal injection of 6 % chloral hydrate ( 0. 5ml / 100g body weight ). perfusion and fixation of animals were carried out by a common procedure : 37 normal saline 50 - 100 ml and then 4 % paraformaldehyde pbs 100 - 400ml were perfused through the left ventricle of the heart, the whole procedure was lasted for about somin. the entire brain was dissected out and dipped in the fixative solution for 12h at 4. brain pieces targeted were choosen and then passed the graded alcohols for dehydration, dipping into paraffin for embeding, and reshaping the pieces

    2 )磷酸緩沖液100400m , 30分鐘完畢,取出整腦,在上述固定劑oc )內后固定12小時。切取觀察部位腦塊,然後,進行梯酒精脫水,浸蠟,包埋,修塊,石蠟連續切片(德國leica石蠟切片機人切片厚still , zlllll ,蛋自甘油載片撈片, 60c烤箱夜,二甲苯脫蠟,梯酒精置換,浸水, h六染色,梯酒精脫水,二甲苯透明,中性樹脂封片。室溫風干后,顯微鏡觀片, olympus萬能顯微鏡照相。
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程;地下水對樁承載力的影響程;各種外部因素影響下,樁的施工工藝對樁承載力的影響程;通在樁體周圍土中漿對樁承載力的影響程
  3. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔樁樁端下的巖體強和結構穩定性方面進行模擬計算和定量研究。
  4. Rhl - 2000b is a circulatory exosomatic heating system used for intra - peritoneal hyperthermic perfusion iphp of chemotherapy. the system has a peristaltic pump and a microwave heater, which could provid continual circulatory heating for chemotherapeutic drug and saline water. several pipe with electronic thermometry at entrance or outlet convey the heated

    運用熱化療機的體外加熱裝置,將熱效應好的化療藥物和鹽水加熱到45 ,運用體外循環泵將其導入體腔內,並且持續循環通測溫系統監測出水口,入水口和體腔內的溫,確保體腔內的溫維持在42 - 43的治療溫,並且維持一定的時間,以達到使腫瘤細胞凋亡並沖出體外的方法。
  5. The effect of pouring arch circle to support ' s deformation is studied. the pour sequence of main arch circle is laid down by the principle that support ' s deformation is minimal in the process of pouring concrete

    研究了拱圈澆對支架變形的影響關系,遵循分段順序應使支架在混凝土程中變形幅最小的原則,制定了主拱圈順序。
  6. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水溉工程質量控制的重點包括:設計階段控制好方案對比、設計優化,特別是水工建築、機電安裝、區規劃等多專業多目標的確定和協調,提高設計質量和深重控制設計成果的長期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要提高承包商的質量自控能力,堅持施工質量的全程、多方法、多體系控制。
  7. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通分析樁底沉渣、樁側泥皮厚、孔壁形狀、成樁時間及施工工藝等對大口徑樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  8. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區鉆孔樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通現場施工試驗及力學、有限元分析,對巖溶地區鉆孔樁的施工工藝、荷載傳遞機理、持力層厚及嵌巖深等方面做一些探討性研究。
  9. Carcinoma in situ in the prostatic urethra should be treated with intraesical bacillus calmette - gu rin and a transurethral resection of the prostate prior to that treatment might increase the contact of bacillus calmette - gu rin with the prostatic urethra, improe staging and in itself treat the prostatic inolement

    前列腺尿道原位癌應可通經尿道前列腺切除術后膀胱內卡介苗桿狀菌,其可增加卡介苗與前列腺尿道部的接觸程,改善治療后的分期以及治療本身療效。
  10. Luxury perfusion syndrome

    過度灌注綜合征
  11. A low detonation velocity explosive with medium density ( lg / cm3 ) and proper power ( > 320ml ). which made from obsolete propellant by controlling the granularity and adding the inhibitor, is studied in this thesis ; the distribution of water in the powdery propellant is described, the effect of detonation velocity from different granularity of powdery propellant is studied and the simulated mathematical model on leakage of water in low detonation velocity explosive is also showed furthermore, the method involved in controlling the leak of water in explosive is provided. meanwhile the effect of inhibitor is experimented some of formulations and processes of low detonation velocity explosive are given in details

    廢棄發射藥可直接用來製造凝膠炸藥,在發射藥顆粒的空隙中加入氧化劑和高分子的混合溶液,經一段時間后氧化劑溶液變成凝膠狀態即可制得炸藥,該炸藥具有密較高( 1 . 4g / cm ~ 3 ) 、抗水、爆速較高的特點;文中對液所涉及的材料、工藝流程進行了研究;分析了炸藥的力學性能;利用炸藥的高爆速及發射藥的低爆速組成一定形狀可用來形成特殊的爆轟波,利用matlab程序設計出了平面波發生器並對影響因素進行了討論。
  12. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深修正系數,使理論計算值與現場實測值具有良好的一致性,進而通變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通剪切波速和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中鉆孔樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  13. Five factors of effecting specify the bearing capacity of drilled grouting pile ( engineering properties of soil, structural dimension of pile, stiffness of pile, time ) have been concluded through introducing the transmission of load mechanism of drilled grouting pile. at the same time, the effecting parameter has been collected. the paper build the ann model in predicting ultimate bearing capacity of drilled grouting pile and discuss in detail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn

    本文簡要介紹了樁基承載力的研究現狀並指出將神經網路引入樁基工程的意義,從介紹單樁荷載傳遞機理出發總結了影響單樁極限承載力的五種因素(樁周土的工程性質、樁身結構尺寸、樁的剛、時間以及施工工藝)並提取了相應的參數;引用神經網路基本原理,詳細介紹了改進bp神經網路的研究程,從而建立了預測鉆孔樁極限承載力的神經網路模型;並詳細討論了本模型的神經網路輸入結點信息的提取,在工程實例的基礎上進行了數值計算。
  14. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通現場試驗、理論計算和有限單元分析,對巖溶地區鉆孔樁的施工工藝、荷載傳遞機理、持力層頂板厚及嵌巖深等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  15. The peculiar mechanical character about pumping liquid concrete is discussed. based on the supposition that the ability of transferring hydraulic pressure of liquid concrete is orthotropic and the friction forces exists between concrete and steel tube, the pressure formulas of liquid concrete and the allotting formulas of deadweight are reasoned out. a new method is brought forward for allotting deadweight of liquid concrete during simulation analysis in pumping - core - concrete construction phase, which improves the calculation precision

    在探討泵送液態混凝土的特殊的力學性質基礎上,在假定液態混凝土傳遞壓強能力為正交各向異性、混凝土與鋼管壁之間的存在有摩擦力的前提下,推導出液態混凝土壓強公式和自重荷載的分配公式,提出了在進行鋼管內混凝土程的施工模擬分析時處理液態混凝土自重荷載分配的合理方法,從而提高施工模擬分析的計算精