過水壩 的英文怎麼說
中文拼音 [guòshuǐbà]
過水壩
英文
overflow dam-
Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.
基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期壩頂面過水等。The old charles river dam : committee on charles river dam, " report of the committee on charles river dam. . to consider the advisability and feasibility of building a dam across the charles river at or near craigie bridge, " 1903
舊查爾斯河水壩:查爾斯河水壩委員會, 《查爾斯河水壩委員會的報告. . .考慮在克雷基橋附近建造跨過查理斯河水壩的合理性和可能性》 , 1903年。Graziers are accused of over - stocking and siphoning off water for their own use without paying for it, while cotton growers are accused of coveting an over - allocation from the upstream burrenjong dam
放牧人被指責是牲畜飼養過量,從濕地中引水自用卻不支付任何費用;同時,棉花種植者也被指責一心只想從布瑞鐘水壩上游裝置分水引入裝置而導致的後果。I am sgn, silly, silly enough as a mule. gutty, gutty enough to dig into what i doubt. nice, nice enough to be your pal
這就是「符合中國國情的」 。 。 。不過?我是喜歡這個水壩的?以後能見到小河每天都有水?總比見到那些污泥的好。In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method
該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。They were beating bowls with chopsticks loudly, treading over mud and water, and scouring southward across the courtyard to the foot of one row cave - houses which served as the office of general services
他們把碗筷敲得震天價響,踏泥帶水、叫叫嚷嚷地跑過院壩,向南面總務處那一排窯洞的墻根下蜂湧而去。( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized
66m ,且為2000m 』兒的常年洪水,對庫區周邊環境的影響較大,因打壩築堤縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周邊灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。The main measures are : damming improving flow condition riverbed excavation etc. riverbed excavation is always used in reducing velocity of a channel with bad flow condition. in singularity channel, velocity can be reduced with the increase of crossing area by excavating riverbeds
整治採取的主要措施有:築壩壅水、改善流態、開挖河槽等等,對于流態惡劣的急流灘,常採用開挖河槽擴大過水斷面面積的方法來降低航道流速。The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq
除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。Since its establishment, the team has accomplished about 500 projects of lithologic reconnaissance, for example the high building of the second station of hainan military command, and many complicated projects of dam grouting and leakproof in hainan province and other countries
建隊以來,完成了海南軍區二所等18幢高層建築等巖土工程勘察項目500餘宗,參加過省內、國外(我國援建工程)的水壩灌漿補漏的維護修復工程多宗。Comparison of water level between measured and computation shows that the local head loss coefficient cannot give head loss by spur dike completely, and the effective area of passage is difficult to be ascertain. for this reason the two methods for water surface profile computation cannot predict the raise of water level upstream the spur dike accurately
計算結果表明,局部水頭損失系數並不能完全反映出由於丁壩阻擋所帶來的水頭損失,而丁壩附近的有效過水面積難以準確地確定,這些導致前兩種方法均不能很好地計算出丁壩上游水位的壅高值。The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said
報道稱,由於廣東韓江水位過高,當地政府開啟了一座水壩的泄洪閘,從而不可避免地淹沒了這些村落。In the bible, the book of revelations says, " i stand at the door and knock. if anyone will open the door, i will come in to him and i will eat with him. " revelations 3 : 20 we push the button and we allow the power and the force of jesus christ to come into our lives and go through our lives and empower us with his spirit and his goodness
1972年, gamal abdel nassar總統為水壩主持開幕禮,他走進去,按下按鈕,他一按按鈕,水就開始流過渦輪機,渦輪機開始轉動,電力開始輸出,埃及蘇丹和鄰近地區都被照亮了,那按鈕並不能製造電力,它只是把能量釋放出來,電力是由水塘里二千億立方碼的水製造的,水流過水壩,推到渦輪機造成電力,我們跟神的關系也一樣,我們邀請耶穌基督進入我們的人生,這就是按按鈕。In the light of the study result that the energy dissipation ratio is higher as the spillway slope is gentle, to applied stepped spillway to overflow earth - rock dams with a certain height is proposed
根據壩坡較緩時,階梯的消能率較高的研究成果,提出把階梯溢流應用於一定高度過水土石壩。Since dams can ‘ t be filled until the risk of flooding is past, the models predict they will trap just 70 to 85 per cent as much run - off as they do now
由於蓄水壩只有在洪水泛濫的危險過去后才能蓄滿水,模擬研究預計它們攔阻水量的能力只是目前水平的70至85 。Design of ecological overflow dam
生態過水壩設計The tai tam reservoir was situated higher than the tai tam intermediate reservoir. similarly, the latter was situated higher than the tai tam tuk reservoir. for these reasons, water stored in the tai tam tuk reservoir must be pumped upwards into the foothills of the tai tam valley in order to reach the tunnel portal of the tai tam reservoir, where water would gravitate to the supply system in central
無論是第一期或第二期的擴建工程,建造水壩都是工程的基礎,而建立抽水系統亦是重要一環,因大潭中水塘的水位比大潭上水塘低,大潭篤水塘更處于較大潭中水塘低的谷地,故大潭篤的存水必須依靠抽水機,才可運送至大潭水塘的輸水隧道,再經由大潭水塘輸送系統,調配至中區濾水系統經過濾后,才可供市民飲用。In april, premier wen jiabao halted plans to build 13 hydroelectric dams on the spectacular nu river in southwest china after protests from the chinese academy of social sciences and a coalition of 80 local environmental groups
四月,在中國社會科學學院80個地方環境的團體聯盟的抗議后,溫家寶停止了已經公告過的在中國西南部怒江上建立13個水力電氣的水壩的計劃。In combination with the construction practice of xinba lock, this paper introduces culvert construction of tile lock ' s upper lock head and preventive measures for cracks
摘要通過新壩船閘施工實踐,介紹了船閘上閘首輸水廊道施工及預防裂縫產生所採取的措施。Abstract : this paper gives an account of the service behavior of dam safety monitoring system of tianshengqiao hydorpower station during construction period, impounding period and operation period, with comparing the deformation conditions of the dam before and after impounding and the behavior of the dam since its operation
文摘:通過大壩安全監測,天生橋一級水電站大壩安全監測系統在施工期、蓄水期及運行期的工作性態,比較水庫蓄水前後大壩各項監測內容的變形情況以及大壩運行到目前的工況。分享友人