過頂水位 的英文怎麼說

中文拼音 [guòdǐngshuǐwèi]
過頂水位 英文
flood elevation
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. And when the good fathers had reached the appointed place, the house of bernard kiernan and co, limited, 8, 9 and 10 little britain street, wholesale grocers, wine and brandy shippers, licensed for the sale of beer, wine and spirits for consumption on the premises, the celebrant blessed the house and censed the mullioned windows and the groynes and the vaults and the arrises and the capitals and the pediments and the cornices and the engrailed arches and the spires and the cupolas and sprinkled the lintels thereof with blessed water and prayed that god might bless that house as he had blessed the house of abraham and isaac and jacob and make the angels of his light to inhabit therein

    這幾好神父抵達了指定地點,小布列顛街八九十號的伯納德基爾南股份有限公司的店堂這是食品雜貨批發商,葡萄酒和白蘭地裝運商特準在店內零售啤酒葡萄酒和烈酒。司儀神父祝福了店堂,焚香熏了那裝有直欞的窗戶交叉拱拱稜柱頭山墻上楣鋸狀拱門尖和圓閣,把聖撒在樑上,祈求天主祝福這座房舍,一如曾經祝福亞伯拉罕以撒和雅各的房舍那樣,並且讓天主的光明天使們住在裏面。
  2. Heat installation continues rising, condenser water drops to the temperature of drainage, temperature - sensing component in top material will minify with cold, leave port a, drawoff the condense water quickly

    溫度繼續升高,閥內溫度超該閥感溫元件所排溫度時,桿的移使a口關閉。
  3. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入平橫槽向地震作用的工況為設計控制工況。
  4. The fundamental ideas and methods of this paper are also illuminated in this chapter. in chapter two, a one - dimensional and semi - closed shallow sea mode is studied. the approximate analytical expressions of the water level at the top of the bay induced by the nonlinear interaction between the storm surges and the astronomical tides are obtained by using the perturbation method

    在第二章里,研究了一維半封閉域中的非定常風暴潮與天文潮非線性相互作用的問題,用攝動方法求出了具有實際意義的海灣部增的一階近似解析表達式,並給出了增程曲線。
  5. Rising the temperature continuously, when it in the valves runs over the temperature of drainage, the detrusion of top material causes the port a close

    溫度繼續升高,閥內溫度超該閥感溫元件所排溫度時,桿的移使a口關閉。
  6. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐托、口門逐漸加寬、河口門分汊、鹽造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  7. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下對豎向移場及涵洞部土壓力的影響情況; 3通離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞部土壓力簡化計算方法。
  8. Meanwhile, arched roof is generally set on beam at the top of pillar. since column adaptor may has displacement ( specially horizontal displacement ), load - carrying capability of the structure will step down, and bending rigidity of the column also has emphatic influence on it

    同時,拱型屋蓋一般是通邊梁支承在柱子上,由於柱產生移(尤其是移) ,支承在柱子上的拱型屋蓋的承載力較固定支座的拱型屋蓋有所降低。
  9. In this process, the moisture of the initial field between the lifting condensation level and the cloud top at the point where rain is observed is adjusted to allow precipitation process to be switched on

    在這個程中,初始場中降雨區域上空,於抬升凝結高度與雲之間的濕度會予以調整,作用是要啟動降程。
  10. ( 2 ) the water level ascending value effected by enclose tideland for cultivation dyke is reverse proportion to flows below 2000m ' / s, water level has surpassed the top of dam when flow is above 2000m3 / s, water level ascending value is declassing in the same flow level caused by enclose tideland for cultivation dyke

    ( 2 ) 2000m ~ 3 s以時,圍墾堤影響的抬高值隨流量增大而增大差逐漸減少,在2000m ~ 3 s以上時,已經超圍墾堤堤,圍墾堤所引起的同級流量下抬高值逐漸減少。
  11. Roll mat - - - can be cut and fit into different types of cavity wall, can be installed into any position of the construction, especially the long and nonblocked area, such as the roofing of metal building ; the slot of power lines, water pipes

    卷氈- - -經切割可以用於任意尺寸的墻體空腔,安裝于建築的任意部,特別是長而無阻塞的區域,如鋼結構屋;電線管、管通的槽隙等。
  12. When an option is in a weak position at low levels and slowly working lower, making lower tops and lower bottoms, it is important to watch the last top or the point where an option breaks away from and makes new lows and never decide that the main trend has turned until the option begins to cross some of these levels from which it broke away

    當行情於低平弱勢區並且以較低的價格緩慢變動,不斷創出一個較低的部和底部時,這時觀察行情最後創出新低的價格或置的變化顯得極其重要,在行情未突破並開始穿一些平線前絕不認為主趨勢已經反轉。
  13. Fluid absorption and secretion across the reproductive tract epithelia largely depends on electrolyte transport through the apically and basolaterally located ion channels, working together with an array of other transporters

    於生殖道上皮細胞膜或基底膜的一系列離子通道和轉運體,通、電解質的跨膜轉運,從而調節雌性生殖道內液體的分泌與吸收。
  14. The test study change of the soil pressure, the touch pressure between pipe and soil, pore pressure, the movement of depth soil, the underwater level and the deformation of earth surface in process of pipe jacking

    研究了管施工程中引起的土壓力、土體與管壁的接觸壓力、孔隙壓力、深層土體移、地下的變化以及地表變形等的影響。
  15. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨管道中遇到的技術難題,進行手掘式工具管砂土層管法施工技術試驗研究,在研究中考慮砂土層存在的后靠土體移、變形,工具管難以進入出洞土體,挖掘面易坍塌、管道中心易偏差及難糾偏等問題,通對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體換填加固,出洞土體換填加固,以及在工具管頭部設置管帽、格柵、糾偏系統等技術措施
  16. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    樁錨支護是一種常見的基坑支護模式,本文以樁錨支護結構移為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁移的影響進行了分析,指出在樁錨支護體系中,錨桿支撐剛度及預應力對基坑變形的影響最為明顯,並通工程實例加以驗證。
  17. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    課題研究與實橋運用,荊州長江公路大橋斜拉橋施工程各狀態和成橋恆載狀態下,斜拉索索力、主梁線形、主梁關鍵截面應變、索塔塔平偏等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  18. 2. horizontal displacement variation rules according to water level and temperature are researched by analyzing that of huangtankou concrete gravity dam. 3

    對黃壇口混凝土壩移的變化程分析,研究了壩移隨、溫度等環境量的變化規律。
  19. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞道的路面高度,以及通往香港會議展覽中心的東行支路必須提高至主平基準面以下7 . 1米,以避開現有地鐵海隧道荃灣線,該隧道管道於主平基準面以下14 . 6米
  20. The mechanic character, destroying pattern, the ductile and dissipation energy capacity of this composite structure under the earthquake have been clarified. the stiffness degradation, natural frequency, damping ratio of this structural system with the development of intensity of earthquake have also been investigated. with consideration of the top displacement, drift of story and micro - strain of longitude steel bars, the equivalent shell wall method has been presented in order to simplify the design of such type structure

    試驗,掌握了該結構體系在平地震荷載作用下的受力特點、變形與耗能性能、結構的破壞形態等力學指標:得到了結構在不同地震烈度條件下的剛度變化、自振頻率、阻尼比等動力特性;綜合結構的移、層間轉角以及鋼筋的微應變,提出了適合於該結構體系簡化設計的「等效剪力墻法」 。
分享友人