道洞開挖法 的英文怎麼說

中文拼音 [dàodòngkāi]
道洞開挖法 英文
pilot method of excavation
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線路黑水河溝隧進口滑坡體的施工方,包括的施工方以及超前與系統支護對在滑坡體上進所發揮的作用。
  2. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧工程,首先介紹了隧支護結構的常用分析計算方;然後通過對隧施工過程中,室穩定性與支護結構相互作用機理的深入分析,建立了隧施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方,綜合分析了隧在不同圍巖特性和圍巖類別條件下,以及不同施工方案等對隧圍巖整體穩定和安全性的影響,從而解決了通用有限元方難以解決的隧三維無限域問題;其可充分發揮有限元在分析非線性方面的有效性和成熟性,以及無限元在分析處理無限域和半無限域方面的精確性和簡便性,為隧施工過程中圍巖的穩定性分析辟了一條新的途徑。
  3. Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed

    文摘:採用近景攝影的方,從隧中獲取圍巖超欠數據,通過數理統計的方,分析各類圍巖超欠的數字特徵及概率分佈,同時得出各類圍巖超欠在隧斷面不同部位的分佈規律,為隧結構的可靠度研究提供可靠參數,也為隧工程質量控制提供基準
  4. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連拱模型試驗,研究了連拱毛引起的應力場變化規律,對不同的連拱斷面的襯砌受力差異進行了深入的分析,同時對中隔墻的受力特點也作了探討,提出了合理的連拱隧構築方及優化斷面圖。
  5. Then we simulate the common excavating methods of double - arc tunnel respectively, analyze the stress and strain of wall rock and support structure of each method, and recommend the best excavating method to construct double - arc tunnel in wall rocks of ii. then we analyze the " three headings method " in detail, and also simulate the effect of construction factor, stress releasing coefficient and secondary lining

    對實際工程中最常用的三種分別進行了施工模擬,分析了它們各自的圍巖和支護的受力變形規律,經比較后,得出了三導是類圍巖中修建連拱隧的較好的結論。
  6. Based on the numerical simulation, it can be concluded that the three heading construction method with the tunnel close to the mountain tunneled first should be chosen in the construction of the multi - arch loess tunnel

    計算結果表明對于偏壓黃土連拱隨應採用先靠山一側的側壁導進行施工。
  7. On the basis of model test, a better construction method under pre - prop for the surrounding rock i, ii, iii, named whole section excavation with heading in moderate degree and that with center heading and center partition first, then with two sides heading, is put forward

    在模型試驗的基礎上,提出了、 、類圍巖隧在預支護下的優化施工方,即下導適度超前全斷面與先行中導及中隔墻、其次兩側下導適度超前全斷面
分享友人