道線法 的英文怎麼說

中文拼音 [dàoxiàn]
道線法 英文
polygonal method
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. Comparison of tunnel thread - drawing therapy and fistulectomy therapy for low - complex anal fistula

    式拖與瘺管切除治療低位復雜性肛瘺的療效比較
  2. The paper applies the method of the l - s coupling in the pauli exclusion principle and gives a simple method to determine the atom states of equivalent double electrons through l - s interaction fold line along angle

    摘要採用自旋與軌相耦的方,在滿足泡利不相容原理和條件下,給出了快速確定同科雙電子原子自旋與軌相耦合原子態的一種簡單方對角折,這種方是對確定同科雙電子自旋軌耦原子態的又是創新方
  3. Calculation of side distance of curved roadway demarcated by chord line

    標定曲方向邊距的計演算
  4. Swimming pool equipment - additional specific safety requirements and test methods for lane lines

    游泳池設備.泳專門安全要求和試驗方
  5. Swimming pool equipment - part 5 : additional specific safety requirements and test methods for lane lines

    游泳池器材.第5部分:泳的附加專用安全要求和試驗方
  6. An interior ballistic solution of erosion rifled guns

    膛火炮燒蝕彈
  7. It is also necessary to reconsider station functional arrangements, such as passenger mobility, and the locations of the passenger agent s office, station management office, and electric and mechanical room. all of these factors must be carefully assessed, since side platforms are to be constructed using the mf method

    (七)旅運量與營運模式之探討,由於車站如以多圓形潛盾隧施作,其月臺型式將為側式月臺,對旅客動及相關站務人員、機房之安排需重新考量。
  8. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis

    為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路劃皆以地下化為主,而整條路除大面積開挖之地下車站及轉轍段外,其餘皆以潛盾隧作為設計之主要考量。
  9. The paper on the basis of the study on the control of the changing slope curve paving in theory, through the study on the responses of the screed to different input signal in condition of the erected string, the controller of the transverse gradient and the floating beam on the spot experimentations, and through the analyzes the three paving design method in theory and the experimentation, on through the analyzes the three paying design method in theory and the experimentation data, provides some material solving measures to solve the changing slope curve paving

    摘要根據彎變坡攤鋪控制特性的理論研究,在工程實際中採用掛、橫坡控制器和浮動均衡梁進行了不同輸入激勵函數下熨平板響應的試驗研究,並通過對這3種攤鋪設計方的理論和試驗數據的分析,提出了解決彎變坡攤鋪的具體措施。
  10. Based on piecewise linear model, this paper proposes an estimation method that first estimates the slope of linear variant and the channel impulse response at the middle time of the current ofdm symbol using pilot sequences, and then estimates the whole channel impulse response through the estimated parameters

    該演算首先利用導頻序列估計出當前ofdm符號間隔內通性變化的斜率和中間時刻通的沖激響應值,然後根據性模型利用估計出的參數得到當前符號間隔內所有時刻上的通沖激響應。
  11. Every year on high - way, there are a large number of traffic accidents that due to driver ’ s inattention or bad - handle. lane departure is the mainly cause. the definition of lane departure is that regard the automobile as a rectangle, any one of angle contact or excess the lane that the automobile is running, we regard the automobile is in lane departure

    該方解決了車偏離預警系統啟動時因車輛前方不存在車信息而不能很好的初始化的問題,在搜索車輛前方可行區域的過程中,由於確立可行區域擺脫了對車的依賴,因此能夠很好地解決了變換車過程中繼續跟蹤車的問題。
  12. Corresponding to the correct water hammer mathematic model ( 3 ), the character difference equation is by comparing the new mathematic model with the old mathematic model, the last calculative part of paper argues the falseness of the current water hammer mathematic model, makes use of the improved character line method to analyze the correct mathematic model ( 3 ), studies all kinds of facts " impact on water hammer pressure value and water hammer phenomenon attenuation, points out that, in the long pipeline system, the subarea calculation of head loss along with flow rather influences the calculative results of water hammer pressure, advices to take the subarea calculation of head loss along with flow into account in the water hammer calculation of the long pipeline system

    對應于正確的水擊數學模型( 3 )的特徵差分方程形式如下c ,弓+吼川一c ,唱一幾弓扮幾rv另卜川= o幾代+吼川一幾唱一吼嶸{一c :腳丸}唱} ? 「本論文在最後的計算部分,通過對新老數學模型的數值計算比較,進一步論證了當前水擊數學模型的不正確性。並且應用改善了的特徵對正確的數學模型( 3 )進行了計算分析,研究了各種因素對水擊壓強值和水擊現象衰減的影響,指出在長管系統中,沿程水頭損失的分區計算對水擊壓強的計算結果影響較大,建議在長管系統的水擊計算中應按分區進行沿程水頭損失的計算。
  13. The difference formulation and boundary condition have been gained by the method of characteristics and the hydraulic transient basic formulation

    從壓力管水力瞬變基本方程出發,利用特徵求解了壓力管水力瞬變的差分方程及邊界條件。
  14. Through the computation of the water hammer pressure in steel and pvc pipes with the characteristic line method, the influence of velocity of water, material and wall thickness of the pipes to the magnitude, crecent process and phase length of the water hammer pressure is analyzed

    應用特徵,對鋼管及pvc管中水擊進行計算,分析了管中水流流速及管材料、管壁厚度對管中水擊壓強大小、水擊壓強的增長過程及其相長的影響。
  15. This thesis brings some new proposals for the computation of temperature rise in nature oil transformer. some useful formulas for convection calculation of vertical and horizontal duct are given. so temperature decrease at the surface of discs and temperature rise of oil flow can be obtained

    得到了較為適合的垂直油、水平油自然對流換熱特性數經驗關聯式,並據此得到了自然油循環變壓器垂直油和水平油餅表面溫降和油流溫升的計算方
  16. On the basis of analysis of design criterion of shaft washer and housing washer of tandem composite type cylindrical roller thrust bearing, we present a mathematic model for optimal design in accordance with line contact requirement for cylindrical roller and race, design the washers thickness and thickness variation angle by the search algorithm of constrained stochastic direction

    摘要在分析串聯組合型推力圓柱滾子軸承軸圈和座圈設計準則的基礎上,按滾子與滾接觸要求建立其最優化設計數學模型,採用機械優化設計中的約束隨機方向搜索計算軸圈和座圈的厚度、厚度變化角。
  17. The new boy stepped over promptly, and said : " now you said you d do it, now let s see you do it.

    這個新來的男孩毫不猶豫地跨過那,說: 「你說你敢打我,現在來看看你怎麼打。 」
  18. Because multi - band wavelet can describe signal more delicately and more compactly than two - band wavelet, and multi - band wavelet can be derived from the infinite iteration of multi - channel filter banks. by means of a detailed discussion for a effective design method of linear phase pr iir filter banks, the author obtain that the method is only fit for two - channel filter banks, but ca n ' t be extended to arbitrary m - channel ( m > 2 ) filter banks

    由於m帶小波比2帶小波分析信號更細致、更緊湊,而m帶小波可由迭代的m通濾波器組獲得,所以本章分析了一種兩通性相位完全重構無限脈沖響應濾波器組的有效設計方,希望可推廣用於m ( m 2 )通
  19. In terms of the characters of urban rail network planning, based on analyzing the applicability of the evaluation methods in existence, an evaluation method arid an index system are emphasized in the thesis

    摘要針對軌網規劃評價的特點,在對已有的現有評價方適用性分析基礎上,提出了一種組合的綜合評價方及指標體系。
  20. In view of the research situation of the technologic and economic evaluation on the constructed program of the pacific road " section in the no : 1 route of wuhan city ' s light rail transit at present, especially the researchment on the trend of the route, the paper discussed detail research of the constructing plans by using various theories of fundamental construction econnmics, etc, based on the the general urban constructing plan of wuhan, etc. the qualitative analysis method and the quantitative analysis method are connected to be applied into this paper for the research work

    本文根據《武漢市城市總體規劃》 ( 1996 - 2020 ) , 《城市快速軌交通工程項目建設標準》 , 《武漢市綜合交通規劃》 ( 1996 - 2020 )以及運籌學、技術經濟學、投資管理學、基本建設經濟學等原理和相關理論,對武漢輕軌交通一號太平洋路段這部分關鍵建設路方案的比選進行了論述及細化研究。本文採用定性分析與定量分析相結合的方,對軌網初始方案進行測試與調整;對多個路走向的初始方案進行篩選,確定兩個備選方案,再對軌交通網優選方案進行綜合比選評價,最終得出軌交通網的推薦方案,增強了建設方案的科學性和合理性。
分享友人